ML20125D143

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1992 for Grand Gulf Nuclear Station
ML20125D143
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/30/1992
From: Cottle W, Daughtery L
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-92-00148, GNRO-92-148, NUDOCS 9212150024
Download: ML20125D143 (5)


Text

-

i$

!r V ENTERGY "0TR*"" " '"*'

fb1 Gesort MS 39150 '

l Td (01437 6408


,-, - ~.- -

December 9, 1992 E T.cotu.

we ne ce m l

G<rd M Row 9n.<.

U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.

20555 i

i Attention: Document Control Desk s

- Subj ect:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 l

Monthly Operating Report GNR0-92/00148 Gentlemen:

i j

In accordance with the requirement of Technical Specification 6.9.1.10, j

Entergy Operations.is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for. November 1992.

i l-If you have any questions or require additional information, please contact this office.

l l_

Yours truly,

)

w r c.=cc:-

f-i:

WTC/TMC/cg

[

attachments:

1.

Operating Status-2.

Average Daily Power Level 3.

Unit Shutdowns and Power Reductions cc:

(See next page) 1 i

4-92113O=

R K 0500o416-

/

\\

PDR i

M00PN0V: :1 4

l

i i

\\

T o

December 9, 1992 GNRO-92/00148 Page 2 of 3 i

cc:

Mr. R. H. Bernhard (w/a)

Mr. D. C. Hintz (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. Stewart D. Ebneter (w/a)

Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 Atlanta,' Georgia 30323 Mr. P. W. O'Connor, Project Manager (w/2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.

20555 d

W

~

M00PNOV - 2 u- -

  • to GNR0-92/00148 DOCKET N0.

50-416 DATE 12/03/92 COMPLETED BY L. F. Daughte,ry TELEPHONE (601)437-23 OPERATING STATUS 1. 'Jnit Name: GGNS UNIT 1 Notes: 2. Reporting Period: November 1992 3. Licensed Thermal Power (MWT): 3833 MWT 4. Nameplate Rating (Gross MWE): 1372.5 MWE 5. Design Electrical Rating (Net MWe): 1250 MWE 6. Maximum Dependable Capacity (Gross MWe): 1190 MWE 7. Maximum Dependable Capacity (Net MWe): 1143 MWE 0. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: N/A 9. Power Level To Which Restricted, In Any (Net MWe): N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr to Date Cumulative

11. Hours In Reporting Period 720.0 8,040 71,152
12. Number of Hours Reactor Was Critical 720.0 6,605.0 56,802.1
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 720.0 6,419.3 54,469.7
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2,728,121 23,670,643 189,393,837
17. Gross Electrical Energy Generated (MWH) 890,868 7,579,960 60,150,070
18. Net Electrical Energy Generated (MWH) 856,558 7,274,583 17,535,298
19. Unit Service Factor 100.0 79.8 79.1
20. Unit Availability Factor 100.0 79.8 79.1
21. Unit Capacity Factor (Using MDC Neti 104.1 79.2 75.5 22.UnitCapacityFactor(UsingDERNeth 95.2 72.4 68.5
23. Unit Forced Outage Rate 0.0 5.3 6.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation).

Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 M00PNOV/SCMPFLR _____________a

  • to GNR0-92/00148 DOCKET NO.

50-416 UNIT I DATE 12/03/92-COMPLETED BY L. F. Daughtery TELEPHONE-601-437-2334 MONTH November 1992 DAY AVERAGE DAILY POWER LEVEL-DAY AVERAGE DAILY POWER LEVEL 4 (MWe-Net) (MWe "at) 1 1186 17 1202 2 1198 18 J 48 3 1155 19 1190 4 1208 20_ 1187-3 5 1214 21 1154-6 1217 22 1191 7 1211 23 1208 8 1209 24 1202 9 1203 25 1207 10 1197 _ 26 1214 11 1190 27 1217 12 1194 28 978 13 1212 29-1132 14 1200 30 1207 15 1207 31-N/A i 16 1204 N/A M00PNOV/SCMPFLR

. to GNRO-92/00148, UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-416 UNIT NAME 1 DATE 12/03/92 COMPLETED BY L. F. Daughtery TELEPHONE 601-437-2334 REPORT MONTH November 1992 l l i Method of Licensee l l Cause & Corrective No. l Date Type. Duration Reason Shutting DownL Event l System l Component Action To l (1)- Hours-(2) Reactor Report # l Code Code Prevent Recurrence l 1. l (3) (4) (5) -(C&CA) I 92-11/28/92 S.

26.8 B

5 N/A N/A N/A LRx thermal power reduction to c 009 lapproximately 65% for control rod [ ! sequence exchange I i l 1 l UNIT SHUIDOWNS AND POWER REDUCTIONS 1 2' 3 4 'F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment' Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram. Entry Sheets for Licensee B-Maintenance or Test 3-Automatic Scram-Event' Report (LER) C-Refueling 4-Continued File (NUREG-0161) D-Regulatory Restriction 5-Reduced load E-Operator Training & 6-Other Licensing Examination F-Administrative 5 G-Operational Error ~ Exhibit 1-Same Source i (Explain) H-Other (Explain) 1 'M00PN0V/SCMPFLR}}