'P M M M M 7 James E. Cross
.Vice President and Chief Nuclear Officer -
. December 10, 1992 Trojan Nuclear. Plant Docket 50-344 License'NPF-1 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington DC 20555
Dear Sirs:
Trojan Technical Specification 4__.4.5.5.
Steam Generator Tube Repair Report During the forced outage for a steam generator tube leak, selected
-inspection of steam generator _ tubes (those with sleeves) was' conducted.
The inspection and subsequent steam generator tube repairs were completed November 25, 1992.
Pursuant to the requirement of Trojan Technical..
Specification 4.4.5.5.a to. report the number of tubes plugged or sleeved.in.
each steam generator within--15 days _of_ completion of each (inservice) inspection, attached are the Trojan steam generator tube repair results.
. Sincerely.-
N d
W. R.: Robinson for J.-E. Cross Attachment c:
Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr.' David Stewart-Smith
. State of Oregon Department of Energy Mr. R. C. Barr NRC Resident Inspector TrojaniNuclear Plant' 1 Anni 9212140172 921210~
PDR ADOCK 05000344 E
I121 SW Salmon Street, Portland; OR 97204 j
(1 5031464-8897 j
a-Trojan Nuclear Plant Document Control Desk Docket 50-344 December 10 1992 License NPF Attachment Page 1 of 1 TROJAN TECHNICAL SPECIFICATION 4.4.5.5.a STEAM GENERATOR TEB U EFAIR REPORT The following table lists the number of tubes repaired by plugging or sleeving in each steam generator. The total number of tubes plugged and sleeved and the effective plugging ratio are also provided below.
STATUS OF STEAM GENERATOR TUBE REPAIRS AI_lllE_ENILDUQVIMBER 1992 Number of Tubes Repaired SLQ.L SLQ_B_
SLQ L SLQ_D_
To t a t_.
Repaired prior to 1991:
Repair by plugging 165 154 260 28a 862 l
0 0
1 0
1 Repair by sleeving Repaired during 1991:
Repair by plugging 374 498 365 343 1,017 580 Repair by sleeving 0
97 431 489 1,
Beginning of Cycle 14 Status:
442 Total tubes plugged 539 652 625 626 2,018 Total tubes sleeved 0
97 432 489 1,096 Total sleeves Inservice 0
101 463 532 1,
Repaired during November 1992:
Repair by plugging 0
1 2
1 4
Repair by sleeving 0
0 0
0 0
November 1992 Status:
Total tubes plugged 539 653 627 627 446 2,014 Total tubes sleeved 3 0
96 430 488 1,090 1,
Total sleeves inservice 0
100 461 529 2
15.91%
19.48%
19.48%
-19.62%
18.62%
Effective Plugging Ratio 1
The number of tubes repaired by sleeving reported in 1990 has been reduced from two to one.
One tube in Steam Generator "C" (Row 15 Col 13) sleeved in 1990 was remo.ed from service by plugging in 1991 due to a reduction in the inner diameter of one sleeve above the rolled transition area of the tube at the tube sheet.
2 Effective Plugging Ratios are based on the equivalence of 14 sleeves of sleeves installed per tube. y values may differ based on the number to one plug. Actual equivalenc However, the sleeve-to-plug ratio of 14:1 is conservative with respect to the current sleeving distribution.
3 One previously sleeved tube in each of Steam Generators B and D and two previously sleeved tubes in Steam Generator C were removed f rom service in November 1992. One tube was the f ailed tube, one tube exceeded the criteria which requires plugging, and two tubee exhibited a reduction in the inner diameter of a sleeve.
7372W.1292
,