Forwards Safety Insp Repts 50-295/92-23 & 50-304/92-23 on 921005-29 & Notice of Violation.Mgt Actions to Increase Involvement of Engineering Organizations in Plant Activities Effective
ML20125C658
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/04/1992
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20125C660 List:
References
NUDOCS 9212140026
Download: ML20125C658 (3)


See also: IR 05000295/1992023

Text

._ __

. _ _ .

_ _ _

__

..

__

_ _ _

_

._

_ _ _ _

.

.

,

DEC-41%b

Docket No. 50-295

Docket No. 50-304

.

.

Commonwealth Edison Company

1

ATTN

Mr. Cordell Reed

Senior Vice president

i

Licensing Department - Suite 300

1

Opus West III

1400 Opus place

Downers Grove, IL

60515

Dear Mr. Reed:

!

Thio refers to the routine safety inspection conducted by

R. h

Lerch, K. Salehi, K. Shembarger, and W. Gleaves of this

office on October 5 - 29, 1992.

The inspection included a review

'

of activities authorized for your Zion Station Units 1

and 2.

At the conclusion of the inspection, the findings were

discussed with those members of your staff identified in the

enclosed report.

3

'

The inspection focused on engineering and technical support for

station activities.

The specific areas examined are identified

in the report. Within these areas, the inspection consisted of a

selective examination of procedures and representative records,

observations, and interviews with personnel.

Management actions to increase the involvement of engineering

organizations in plant activities was effective.

An example is

the corporate engineering effort for snubber reduction.

Engineering products were typically thorough and correct.

Our

.

inspection, however, found some areas where your performance was

lacking.

In these areas, certain of your activities, appeared to

be in violation of NRC requirements as specified in the enclosed

Notice of Violation (Notice).

The first violation is of concern

'

bccause the engineering evaluations for a temporary alteration to

the safety injection system failed to evaluate the potential for

,

leakage to create a significant water hammer.

An evaluation by

the corporate engineering staff also failed to recognize this

issue.

Other temporary alterations reviewed had evaluation

weaknesses to a lessor extent.

The second violation involved an

interlock between emergency core cooling system valves not being

'

tested after maintenance was performed.

A maintenance activity

unintentionally disabled the interlock.

Upon discovery by the

licensee, the deviation report (DVR) failed to identify

inadequate post-maintenance testing as a contributing cause.

9212140026 921204

PDR

ADOCK 05000295

l

O

PDR

i

/E0/

..

.

.

-

- - - . -

-

.

--.

.

_ _ .

-

_-

_

.

.

.. __

.

DEC - 4 B32

Commonwealth Edison Company

2

.

You are required to respond to this letter and shoula follow the

instructions specified in the enclosed Notice when preparing your

response.

In your response, you should document the specific

actions taken and any additional actions you plan to provent

recurrence.

After reviewing your response to this Notico,

including your proposed corrective actions, and the results of

future inspections, the NRC will determine whether further NRC

enforcement action is necessary to ensure compliance with NRC

regulatory requirements.

In accordance with 10 CFR 2.790 of the Commission's regulations,

a copy of this letter, the enclosed inspection report, and your

response (s) to this letter will be placed in the NRC Public

Document Room.

The responses directed by this letter is not subject to the

clearance proceduros of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this

inspection.

Si.1cerely,

OkITNM SMED Bf HUDERI L M!uW

11 .

J.

Miller, Director

Division of Reactor Safety

Enclosures:

1.

Notice of Violation

l

2.

Inspection Reports

No. 50-295/92023(DRS);

!

No. 50-304/92023(DRS)

Eng_.Atinched Distribut;1QD

l

l

f'S

Vfg

YfS

RIII

RII

RIII

RIII

RIIIt

/)stl-

/:44-(hg

fu C fc4

$4LL mt

B . gW

l

Lerch/cg

Shembarger

Salchi

Gleaves

Burgess

12/J /92

12/ A /92

12/A/92

12/2 /92

12/?-/92

II,I )

RI M-

RIII

RII/

WQY

m

(

/W

t

Farber

Martin

ller

12/

/92

12/j/92

12/T /92

2/

/92

4

e

. . - . -

.

.

-

--

.

~ . =

.

l

.

.

Commonwealth Edison Company

3

DEC - 4 ISG2

Distribution

oc w/enclosurent

M. Wallace, Vice Presiderit,

PWR Operations

T. Kovach, Wailcar

Licensing Manager

T. Joyce, St6 tion Manag9r

-

S.

Kaplan, Regulatory Assurance

Supervisor

DCD/DCB (RIDS)

OC/LFDCB

Pesident inspectors, Byron,

Braidwood, 21on

f

Richard Hubbard

J. W. McCaffrey, Chief, Pub,lic

Utilities Division

Mayor, city of Zion

Zion, trH, NRR

Robert Newmann, Office of Public

Counsel, State of Illinois Center

Robert M. Thompson, Administrator

Wisconsin Division of Emergency

Government

l

,