sw e s we i
i PLANT avaius t
M Y AND/0R SPRINKLER SYSTEM 5
.l LIMITING CONDITION FOR OPERATION 3.7.11.2 The spray and/rr sprinkler systems located in the followil areas shali b: PERA8LE:
a.
(Plantdependent) b.
c.
APPLICA81LITY: All modes i
F MittN1:
With a spray and/or sprinkler system inoperable establish a continuous fire watch with backup fire suppression equipment in unprotectedarea(s),and In MODES 1, 2, 3 or 4 restore the system to OPERABLE status within 7 days or be-in at least H0Y STANDBY within.
1.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
In MODES 5 or 6 restore the system to OPERABLE status
~within 7 days or prepare and' submit a Spec 2.
next 10 days outlining-the cause of inoperability and the plans for restoring the systera to OPERABLE status..
.. SURVEILLANCE REQUIREMENTS l
The spray and/or spinklar systems shall be demonstrated to 4.7.11.2 OPERABLE:
- a. - At least once per g2 days by' cycling each testable valve through one complete cycle.
b.
At least-once per 12 months:
By performing a-system functional test which includes simulated automatic actuation of the system and 1.
verifying that-the automatic valves in the flow path actuate to their. correct positions._
By inspectTon of spray headers to verify the'iFinteg
~
~
' 2.
3.
By inspection of each nozzle to verify no blockage.
At least once per 5 years by an_ air flow test-of the open-c.
head spray and/or sprinkler system.1 g211gKO 4 761210.