ML20125C309

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1992 for Virgil C Summer Station,Unit 1
ML20125C309
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/30/1992
From: Skolds J, Summer V
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9212110136
Download: ML20125C309 (5)


Text

. 10CFR50.36

- South C:rolina Eltetric & G:s Comp:ny John L skolds 7 P.O. Box 88 Vice President Jenkinsville. SC 29065 Nuclear Operatione

. (803) 345 4040 SCE&G

,-~,

DECEltER 7, 1992 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 MOVEMBER MONTHLY OPERATING REPORT Enclosed is the November 1992 Monthly Operating Report for the Virgil C.

Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly y urs, w '

John L. Skolds JWH:RJB:smd Attachments c: 0. W. Dixon J. W. Flitter R. R. Mahan F. Yost R. J. White INP0 Records Center S. D. Ebneter Marsh & McLennan G. F. Wunder Paul D. Krippner (ANI)

General Managers Pat Haught (Westinghouse)

G. J. Taylor NSRC NRC Resident Inspector RTS (MON 2000)

J. B. Knotts Jr. File (818.03-1) 9212110136 921130 / f DR ADOCK 0500 g5 110006 NUCLEAR EXCELLENCE - A SUMMER TRADITION!

O.

Director, Office of Resource Management November Monthly Operating Report Page 1 >

ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL

-DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 12/ 1/92 COMPLETED BY J. W. HALTIWANGER TELEPHONE (803) 345-4297 NOVENBER 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

l. 891 17. 892
2. 891 18. 892
3. 892 19. 892
4. 891 20. 892
5. 891 21. 891
6. 891 22. 894
7. 891 23. 891 1
8. 874 24. 893
9. 890- 25, 893
10. 891 26. 893
11. 892 27. 892
12. 893 28. 894
13. 892 29. 893
14. 891 30. 893
15. 892
16. 891

Director, Of fice of Resource Management November Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 12/ 1/92 COMPLETED DY J. W. HALTlWANGER-TELEPHONE (803) 345-4297 OPERATING STATUS

1. Reporting Period: November 1992 Gross Hours in Reporting Period 720
2. Currently Authorized Power Level (MWt): 2775 Max. Depend. Capacity (MWe-Net): 885 Design Electrical Rating (MWe-Net): 900
3. Power Level to which Restricted (If Any)(MWe-Net): N/A 4 Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE
5. Number of Hours 9eactor Critical 720.0 7809.1 62433.7
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator on Line 720.0 7788.6 61276.3
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 9 Gross Thermal Energy Generated (MWH) 1995108 21414098 159982865
10. Gross Electrical Energy (MWH) =668450 7148660 53034059
11. Net Electrical Energy Generated (MWH) 641700 6851524 50398806-
12. Reactor Service Factor 100.0 97.1 79.9
13. Reactor Availability Factor 100.0 97.1 79.9
14. Unit Service Fa. 7r 100.0 96.9 78.4
15. Unit Availability Factor 100.0 96.9 78.4
16. Unit Capacity Factor (Using MDC) 100.7 96.3 72.9 17 Unit Capacity Factor (Design MWe) 99.0 94.7 71.6
18. Unit Forced Outage Rate 0.0 0.0 6.0
19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):

Refueling, March 5, 1993, 65 Days

20. If Shut Down at End of Report Period, Estimated Date of Startup: N/A
21. Units in Test Status (Prior to Commercial Operation): N/A 4

l n .

,6.

Directori Office of-Resource Management November Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 12/ 1/92 COMPLETED BY J. W. HALTIWANGER ~

TELEPHONE (803) 345-4297 NOVEMBER 1992 NO. DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION /COKMENTS NONE 1.0 PSASON 2.: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Trair.ing and License Examination F: Administrative G: Operational Error H: Other (Explain) 2.0 METHOD 1: Manual '

2: Manual Scram 3: Automatic Scram 4: Continuation (Use initial Date) 5: Power Reduction (Duration 0.0)

9. Other (Explain)

q ,,

Director, Office of. Resource Management November Monthly Operating Report-Page 4 ATTACHMENT IV NARRATIVE SUMM*RY OF OPERATING EXPERIENCE DOCKET NO. 50/.95 UNIT V. C. SUKMER I DATE 12/ 1/92 I COMPLETED BY J. W. HALTIWANGER t TELEPHONE (803) 345-4297 NOV EMB ER 1992 V. C. Summer Nuclear Station operated at approximately 100 percent power for the entire month of November.

i I

>L

!