Summary of 790330 Meeting W/Mark II Owners Group in Bethesda,Md to Discuss NRC Comments on Proposed Kennedy- Newmark Criteria for Combining Dynamic Responses Using Square Root of Sum of Squares
ML20125C233
Person / Time
Issue date: 04/12/1979
From: Hou S
Office of Nuclear Reactor Regulation
To: Bosnak R
Office of Nuclear Reactor Regulation
Shared Package
ML20125C235 List:
References
REF-GTECI-A-08, REF-GTECI-CO, TASK-A-08, TASK-A-8, TASK-OR 790421, NUDOCS 8001080116
Download: ML20125C233 (8)


Text

-

l 9e ll2iTED STAYES

[/

b NUCLEAR REGULATORY COMMISSION i

!..l. fj j WASHINGTON, D. C. 20555 ge 7j

\\.),#

APR 121979 MEMORANDUM FOR:

R. J. Bosnak, Chief, Mechanical Engineering Branch, DSS FROM:

S. N. Hou, Mechanical Engineering Branch, DSS

SUBJECT:

MEETING MINUTES - RESPONSE COMBINATION IN MARK-II PLANTS On March 30, 1979, a meeting (Attachment A) with Mark-II Owner's P"oup was held in Bethesda to discuss staff comments (Attachment B) on their proposed Kennedy-Newmark Criteria (Attachment C) for combining dynamic responses using SRSS. Discussions include staff review status, Owner's response to staff commments (Attachment F) and presentations by the Brookhaven National Laboratory (Attachment G) regrading the progress in their on-going generic studies on response combination methodologies.

As mathematically indicated (Attachment 0), the rules of SRSS are valid only for combining standard deviations when all functions to be combined are stationary, uncorrelated, and with zero-mean. Hence, any proposed SRSS application to combining the extreme peaks of response functions, which also may not be stationary, uncorrelated, and with zero-mean, certainly need careful investigation. The purpose is to ensure the validity of assumptions used; the adequacy of criteria to cover various nature of response functions; the limitation of criteria applica-tion; and the applicability of criteria to aid the engineering processes in design and analysis.

Currently, we have two technical assistant contracts with BNL for j

generic investigation on response combination methodologies and for evaluating the Owner's proposed criteria. The expected completion date for both contracts is September 30, 1979. Their findings may be helpful to complete our review on the proposed Kennedy-Newmark criteria.

In order to expedite the licensing process, Interim acceptance criteria (Attachment E) for using SRSS were developed since November, 1978 for lead Mark-II plants. With respect to combining dynamic responses of LOCA and SSE loads, the staff position as outlined in NUREG-0484 is that SRSS is acceptable for the reactor coolant pressure boundary systems, components and supports.

In addition, the staff has accepted the SRSS method of combining re ponses resulting from LOCA and SSE for all other ASME Class and 3 systems, components and supports in the plant.

80 01080 )I b bb

~ b U I) 8 90011185 t

l 1

APR 121979 R. J. Bosnak In summary, this meeting is helpful to schieve mutual understanding in views and to inform the progress of on-goin efforts of all sides, W

S. N. Hou Mechanical Engineering Branch Division of Systems Safety Attachments:

A.

Meeting Agenda & Attendance List B.

Staff Comments on the proposed criteria C.

The Mark-II Owner's proposed Kennedy-Newmark Criteria D.

Staff presentation: Background Information on Response Combinations E.

NRC Interim Acceptance Criteria for using SRSS F.

Dr. Kennedy's presentation: Response to Staff Comments on the Proposed Criteria G.

BNL Presentation: Prcp ess report on their generic studies.

cc w/att:

J. P. Knight, DSS F. Schauer, DSS K. Wichman, 00R H. L. Brammer, DSS F. Cherny, DSS J. Richardson, RES W. F. Anderson, SD E. G. Igne, ACRS H. Chau, Mark-II Owner's Group M. Reich, BNL 90011186 i

- ~.

\\

~

ATTA CH M EN T A

Meeting Agenda On

\\

RESPONSE COMBINATION IN MARK-II PLANTS March 30,, 1979 I.

Status report on staff review 10 min.

A.

Describe review effort B.

Explain staff concern C.

Propose review schedule i

II. Mark-II Owner's response to staff i

coments on Kennedy-Newmark Criteria 50 min.

Break 10 min.

III. BNL Presentation:

A.

Coments and planned reviews on Kennedy-Newmark Criteria 10 min.

B.

Progress report on generic studies 50 min.

1.

Objective of studies 2.

Approaches used 3.

Findings up to present:

a.

Identify major parameters b.

Sumarize findings on i

sensitive studies 4.

Identify remaining work and completion date 90011187 i

IV. Discussion i,

V.

Closing A.l e5

F ATTENDANCE LIST March 30, 1979 MK-II Meeting Name Organization R. Bosnak NRC/ DSS /MEB H. L. Bramer NRC/ DSS /MEB Pei-Ying Chen NRC/ DSS /MEB Lingagoud Memula Bechtel Louis C S Nieh Stone & Webster Jo S. Abel Comonwealth Edison A. K. Singh Sargent & Lundy R. P. Kennedy Engineering Decision Analysis Co.

C. V. Subramanian General Electric Co.

G. H. Weidenhamer NRC/SCSD R. K. Mattu NRC/ DSS /MEB K. N. Jabbour NRC/ DOR /SEPB C. P. C. Wang BNL M. Reich BNL J. Curreri BNL l

Kulin D. Desai NRC/ DSS /MEB M. Hartzman NRC/ DSS /MEB A. W. Chan S&W K. Wichman NRC/ DOR /EB J. B. Mahoney Burns & Roe C. K. Chau Lawrence Livermore Lab.

J. F. Costello NRC/RES K. G. Hazifotis General Electric John O'Brien NRC/RES David D. Reiff NRC/RES C. P. Tan NRC/ DSS /SEB R. M. Stephens NRC/ DSS /MEB 1

)

S. N. Hou NRC/ DSS /MEB

)

90011188 A-2

\\

.x.

t ATTACH ME N T B

MECHANICAL ENGINEERING BRANCH COMMENTS ON NEDO-24010SUPPLEMEN[2 A.

For Criterion #1:

1.

The proposed criterion represents a fresh approach by utilizing characteristir;s cf time functions,instead of attempting generic conclusions fr0m c few case studies as done by others. Generally speaking, the criterion is simple, easy to apply, and may be able to achieve a high non-exceedance probability in most cases.

However, the criterion appears to be based on engineering judgement without the needed data basis to verify the claimed goal of achieving 84% non-exceedance probability.

2.

We are not certain the parameters used, such as number and level of high peaks, durations, etc., are sufficiently adequate to ensure a justifiable SRSS combination in all cases meeting the criterion.

For instance, one important condition to warrant the use of SRSS is that both time functions shall be rapidly varying.

Since " rapid varying" is a relative term, a comparison of frequency contents in time function may be necessary.

A search of parameters which control the characteristics of time functions in conjunction with sensitivity studies of those parameters may be helpful to verify the adequacy of the criterion.

90011)89 5-l I

y k

hi

)

2-l As an alternative, numerical examples associated with non-l exceedance probability evaluation (i.e., use CDF) may be conducted to develop the data base for verifying the assurance i

level of the proposed criteria.

3.

The proposed criterion indicated that the use of SRSS can be based on the characteristics of either the loading time functions, or the response time functions. We feel that combination of responses should be solely based on the character-istics of the response time functions.

Since the characteristics of the responses are effected by the structural dynamic properties, such as natural frequencies, damping values, etc. even the same loading can produce responses of various nature. Thus a loading time function meeting the criteria may not necessarily mean that the response time functions will also meet the criter t.

We would require justification for the use of loading functions.

4.

It is rather difficult to determine whether two time functions are strongly correlated, or weakly correlated just by observation alone. Furthermore, judgement by opinion may vary from person to person. We have adequate confidence that the level of correlation among earthquake ground motion components is weak.

However, to determine the level of correlation among response L

time functions other than earthquake event may present a problem.

g.

90011190 t

6:2 s

{.

. Additional work of calculating the coefficient of correlation may be needed. The work will be compoupded when an increased number of time functions are needed to be combined at one time.

5.

Many response time functions may not have a zero mean. No guidance is provided on how such cases would be handled.

B.

For Criterion #2:

1.

It was stated in the preamble of the report that the intent of the proposed criteria for response combinations is to achieve a non-exceedance probability of 84% (+).

We feel that proposed criterion #2 may not achieve that goal if it uses SRSS based on a 50% (+) non-exceedance probability, since it appears to be inconsistent with the stated intent. Furthermore, the purpose and the basis in adding an additional r'equirement of 85% (+) non-exceedance probability at 1.2 SRSS is not clear, since the proposed value to be used is SRSS, not the 1.2 SRSS.

One of the many possible reasons for people to promote SRSS is because the method is simple and convenient.

If we go to the trouble of generating a CDF curve at the 84% non-exceedance probability then that value may be more justifiable than the SRSS value. Why bother to have two SRSS related values?

I.

i 90011191 B-3

~'.

[

(

4 2.

Since a CDF curve is used in the criterion, guidance to ensure the validity of the curve may be necessary.

Notice that CDF curve may not be unique due to following circurestances:

a.

Rmiponse time function is not unique.

b.

Durations of the strong motion portions taken for response i

combinations are arbitrary.

l c.

The probability density function assumed for defining phasing relationships among response functions is arbitrary.

Thus, how a bounding CDF curve is defined to ensure adequate l

coverage of all mentioned uncertainties is essential to the application of the proposed criterion #2.

1 p