ML20125C170
| ML20125C170 | |
| Person / Time | |
|---|---|
| Issue date: | 12/01/1992 |
| From: | Joshua Wilson Office of Nuclear Reactor Regulation |
| To: | Pierson R Office of Nuclear Reactor Regulation |
| References | |
| PROJECT-669A NUDOCS 9212110079 | |
| Download: ML20125C170 (2) | |
Text
-
Project No. 669 December.1. 1992 4
MEMORANDUM FOR:
Robert C. Pierson, Director Standardization Project Directorate Associate Directorate for Advanced-Reactors and License Renewal, NRR FROM:
James H. Wilson, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal, NRR
SUBJECT:
NOTICE OF PUBLIC MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION (NRC) STAFF AND THE ELECTRIC POWER RESEARCH INSTITUTE (EPRI)
DATE AND TIME:
December 16, 1992 (8:30 a.m. - 11:30.a.m.)
i LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room 6-B-13 PURPOSE:
Closeout meeting for issues identified in the staff's draft safety evaluation report for Appendix A to Chapter 1 of EPRI's Requirements Dacument for passive plant designs.
PARTICIPANTS *:
NRC-EPRI A. El-Bassioni J. Berger R. Palla E. Rumble J. H. Wilson S. Lewis J. Trotter (original signed by)
James H. Wilson, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal, NRR cc:
See next page
- Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners,' intervenors, or, other parties to attend as observers pursuant to "Open Meeting-Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78.
Members of the public who wish to attend should contact me at (301) 504-1108.
DISTRIBUTION:
Central ' File :
PDST R/F TMurley/FMiraglia DCrutchfield NRC PDR
-WTravers RPierson-RBorchardt JNWilson JHWilson
-TKenyon JMoore,15B18 EJordan, MNBB3701 ACRS (10)
GGrant, ED0 AChaffee, EAB OPA P0' Dell, PTSB NRR Mailroom,12G18 LPlisco, 12G18
+
PShea AEl-Bassioni,10E4 RPalla,10E4 f[h-I PdST OFFICIAL RECORD COPY:
SC:har:ADAR 0FC:
' LA:PDST:ADAR PM:PDST:ADAR
'v/
RBo dt
'MTG1216.JHW NAME: PSheay4
'JHWilson4z, t
DATE: 12/oi/92 12/0i/92 [
12/f /92 bfa'fh hffd{ []
2 1
7 2120 a
669A PDR
-4'.
ALWR Utility Steering Committee EPRI-Project No. 669 cc:
Mr. E. E. Kintner Chairman Utility Steering Committee Bradley Hill Road Post Office Box 682 Norwich,-Vermont 05055 Mr. ' John Trotter Nuclear Power Division Electric Power Research Institute Post Office Box 10412 Palo Alto, California 94303 Mr. Brian A. McIntyre, Manager Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit Post Office Box 355 Pittsburgh, Pennsylvania 15230 Mr. Joseph Quirk GE Nuclear Energy Mail Code 782 General Electric Company 175 Curtner Avenue
+ San Jose, California 95125 Mr. Stan Ritterbusch Combustion Engineering 1000 Prospect Mill Roa6 Post Office Box 500 Windsor,-Connecticut 06095 Mr. Daniel F. Giessing U. S. Department of Energy NE-42 Washington, D.C.
20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.V.
Room 8002 Washington, D.C.
20503