UNITED STATES ATOMIC ENERGY COMMISSION

, dU l*?

wAsmNGTON. O.C. H545 I 'I

/

NORTHERN STATES PO4ER COMPANY (MONTICELID NUCLEAR GENERATING PLANT)

DOCKET NO. 50-263 PROVISIONAL CONSTRUCTION PERMIT Construction Permit No. CPPR-31 1.

Pursuant to Section 104 b. of the Atomic Energy Act of 1954, as amended, (the Act) and Title 10, Chapter 1, Code of Federal Regulations, Part 50,

" Licensing of Production and Utilization Facilities," and pursuant to the order of the Atomic Safety and Licensing Board, the Atomic Enerky Commis-sion (the Commission) hereby issues a provisional construction permit to Northern States Power Company (the applicant) for a utilization fscility (the facility), described in the application and amendments thereto filed in this matter by the applicant and as more fully de, scribed in the evidence received at the public hearing upon that application. The facility, known as the Monticello Nuclear Generating Plant, will be located at the appli-cant's site in Wright County, Minnesota, about 3 miles northwest of Monticello, Minnesota.

2.

This permit shall be deemed to contain and be subject to the conditions specified in Sections 50 54 and 50 55 of said regulations; is subject to all applicable provisions of the Act, and rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the condi-tions specified or incorporated below:

A.

The earliest date for the completion of the facility is October 1, 1969, and the latest date for completion of the facility is February 1, 1970.

B.

The facility shall be constructed and located at the site as described in the application, as amended, in Wright County, Minnesota, about 3 miles northwest of Monticello, Minnesota.

C.

This construction permit authorizes the applicant to construct the facility described in the application and the hearing record in accordance with the principal architectural and engineering criteria set forth therein.

3.

This permit is provisional to the extent that a license authorizing opera-tion of the facility will not be issued by the Commission unless (a) the applicant submits to the Commission, by amendment to the application, the complete-final safety analysis report, portions of which may be submitted and evaluated from time to ties; (b) the Commission finds that the final design provides reasonable assurance that the health and safety of the 9212100217 670621 PDR ADOCK-05000293 A

PDR

_ha,:

5 W

d'-

4

~

2-7 public will not 'be endangered by the operation of the facility in '

accordance with procedures approved by it in connection with the -

issuance of said license; and (c) the applicant submits proof.of financial _ protection and the execution of an indemnity agreement as required by Section 170 of the Act.

FOR THE ATOMIC ENERGY COMMISSION

.ri$21 Signed bf Achng Dire M J. Skovha!l Peter A.' Morris, Director Division of Reactor Licensing Date of Issuance:

JUN 101957

~

4

,.t:

  • j,
  1. %j UNITED STATES -

ATOMIC ENERGY COMMISSION

}

i pig WASHINGTON, D.C. 20S45

%,%n * /

Mr. David C. Eberhart Director Office of the t'ederal Megluter National Archives & Record Service Washington, D. C.

20408

Dear.Mr. Eberhart:

Attached for publication iti the Federal Register are an original and two certified copies of a document entitled:

Docket No. N 3 Northern states power comommy petice of T==-

of Frwisiend Cemetruction Pensit Publication of the above document at the earliest possible date would be appreciated.

Sincerely yours, W. B. McCool Secretary to the Commission

Enclosures:

Original and_2 cert. cys.

CC:

cket Clerk (Dir. of Reg.)

D. C. Files (SECY)

Wm. Hughes (PI) )

Germantown Files (SECY)(SECY Legal Files (OGC Public Proceedings Br.-

Congressional Liaison Contracts hbk h C~

UNITED STATES ATOMIC ENERGY COMMISSION DOCKET NO. 50-263 NORTHERN STATES POWER COMPI.NY NOTICE OF ISSUANCE OF PROVISIONAL CONSTRUCTION PERMIT Notice is hereby given that, pursuant to the Initial Decision of the Atomic Safety and Licensing Board, dated June 19,1967, the Director of the Division of Reactor Licensing has issued Provisional Construction Permit No. CPPR-31 to Northern States Power Company for the construction of a boil-ing water nuclear reactor, designated as the Monticello Nuclear Generating Plant Unit 1.

The reactor is designed for initial operation at approxi-mately 1469 thermal megawatts and is to be located at a site in Wright County, Minnesota, approximately three miles northwest of Monticello, Minnesota.

A copy of the Initial Decision is on file in the Commission's Public Document Room, 1717 H Street, N.W., Washin6 on, D.C.

t FOR THE ATOMIC ENERGY COMMISSION Origb! 3; ped by D.1 Shasil Astbg Olrn!w Peter A. Morris, Director Division of Reactor Licensing Dated at Bethesda, Maryland this // day of June,1967

{ '-

opxmh[: 7.m~ -

)

s n

.