Forwards Operating Data Including one-time Reporting Request Forecast of Refueling & Major Shutdowns for Next 5 Yrs
ML20125B235
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/28/1974
From: Neils G
NORTHERN STATES POWER CO.
To: Chapman S
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 9212090267
Download: ML20125B235 (5)


Text

,.

c fW r,

'$egulatoppocket RIe NSEE OR7HERN syAyES POWER COMPANY M I N N E A Po t.i t. M I N N E S OT A 5 5 401 February 28, 1974 (laf/[b'\\

k 1.

(_f,. *g A,~

Office of Plans & Schedules A

s Directorate of Licensing V, $ x ar h

Washington, D.C.

20545

'PM U. S. Atomic Energy Commission Attention:

Mr. S Chapman Gentlemen:

MONTICELLO NUCLEAR' GENERATING PIANT Docket No. 50-263 License No. DPR-22 Monthly Operating Data January, 1974 In accordance with the request of February 19, 1974 from Mr. L Manning Muntzing, the attached operating data is provided.

This information includes a "one-time reporting request" forecast of refueling and major shutdowns for the next five years.

Very truly yours,

.f

.l-

't%

G H Neils General Superintendent of C ED Nuclear Power Plant Operations

]

A APR181974+ 's CHN/ts h

EGULATORY

?.' Alt SEtyjog cc: J G Keppler D - # CKET CLDtg Attachment D

g dhdd 9212090267 740228 PDR ADOCK 05000263 P

PDR

I.

UNIT HONTICELLO NUC1 EAR GENERAT1HG PIANT DATE February 28, 1974 CQ4PLETED BY R L Scheinost MAJOR SilUTDOWN FORECAST (5-year forecast; report one-time only) 1 PURPOSE (s)

BEGIN DATE END DATE Refuelingt majar maintenancet perfonn 3/15/74 6/1/14 inspections and conduct tests required (740315)

(740601) each operating cycle Same 3/15/75 5/11/75 (750315)

(750511)

Jame 2/21/76 4/3/76 (760221)

(760403) game 3/12/77 4/23/77 (770312)

(770423)

Same 3/4/77 4/15/78 (780304)

(780415) a),

UNIT.WiE

}kuticell! Elrar Generating Plant

'IRTE February / 27,E74

/

COMPLElID BY Yk [//2M-dC

(

OPERATING STATUS 1.

REPORTING PERIOD: 0000, 740101

'IO 2400, 740131 GROSS IDURS IN REPORTING PERIOD:

743 (Change to DST)_

2.

CURRENTLY alt 010RIZED POWER LEVEL Wt 1670 We-hTT 559 (Pool Winter Rating, M\\PLA test) 3.

POWER LEVEL TO MlICH RESTRICTED (IF AW):

91%

4.

REASONS FOR RESTRICTIONS (IF AhT):

End of cycle scram reactivity THIS CUMULATIVE hDNDI YR-TO-DATE TO DATE 5.

Il0URS REACTOR WAS CRITICAL 743 743 17,180 6.

HOURS GENERATOR ON-LINE 743 743 16,590 7.

GROSS THER4\\L T0hTR GENERATED (FMI) 1,084,831

_1,084,831 25,596,072 8.

GROSS ELECTRICAL POWER GENERATED (hMf) 374,870 374,870_

8,765,100 9.

NET ELECTRICAL POWER GENERATED (hNi) 360,710 360,710 8,378,508

10. REACTOR AVAILABILITY FAcr0R (1) 100%

100%

75.7%

11. PLANT AVAILABILITY FACTOR (2) 100%

100%

73.1%

12. PLAhT CAPACITY FACIOR (3) 86.8%

86.8%

66.0%

13. FORCED OLTrnGE RATE (4) 0 0

Later

14. SiluTDOWNS SCHEDULED TO BEGIN IN NEXT 6 h0NDiS (STATE TYPE, DATE, AND DURATION OF EAOl):

Refueling outage, scheduled to start hhrch 15, 1974, duration of 11 weeks.

~~

15.

IF SHirrDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STAR'IUP:-

16. PLANTS IN TEST STATUS (DELLTED)

(1) REACTOR AVAILABILITY FACTOR = HOURS REACTOR WAS CRITICAL

  • 100 GROSS Il0URS IN REPORTING PERIOD (2) PLAhT AVAILABILITY FACTOR = IDURS GENERATOR ON LINE
  • 100 GROSS Il0URS IN REPORTING PERIOD (3) PLAhT CAPACITY FACTOR = NIrr ELECTRICAL POKER GENERATED
  • 100 NET DBONSTRAlhD* GROSS IDURS IN REPORTING PERIOD (4) FORCED OlTTAGE RATE = F_0_RCED OUTAGE LOURS
  • 100 HOURS GENERATOR ON-LINE + FORChD OlHAGE HOURS

e 2025 EU)SURE A bbnticello hbclear UNIT. Generating Plant IMTE Fo 6 pa Lg7V /

CQ@llD'ED BY MM UadeMC i

/

DAILY 1%T POWER OJnUT hogn{

January, 1974 1

DAY AVERAGE HOUR 1X We-net IRY AVERAGEIl00RLY We net 1

505 25 473 2

503 26 480 3

502 27 476 4

499 28 468 5

471 29

,,_,57 4

6 480 30 453 7

503 31 452 8

_502 9

505 10 503 11 505 12 501 13 501 14 479 15 485 16 485 17

__483 18 484 19 485 20 482 21 483 22 478 23 474 24 472

tu2/

FONTICELID yJC sgr.ngf UNIT NME GENERATI?G PIX

      • I' Base loaded power operation for the entire month.

RITORT BONH{ January, 1974 OCNPLETED BY MV M

PIET SUTD0'.0iS TYPE MEDDD OF F-FORCED DURATION SUITING DCLCi NO.

DATE S-SCHEIULED 00URS)

REASON (1)

W E REACIOR (2)

OCIISTS hDNE

\\

(1) PIASON:

(2) MEIW A-EQUIBLT FAILURE (EXPIAIN)

A-Mi'. '

B-M\\IN. OR TEST B-KC C-REFUELINE SC D-REGL\\ TORY RESIRICTIGN C-MTR E-OPERATOR TRALNIhU G SCT LICENSE EXMtINATION F-AMIINISTR\\TIVE G-OPERATIONAL ERROR (Explain)