c fW r,
'$egulatoppocket RIe NSEE OR7HERN syAyES POWER COMPANY M I N N E A Po t.i t. M I N N E S OT A 5 5 401 February 28, 1974 (laf/[b'\\
k 1.
(_f,. *g A,~
Office of Plans & Schedules A
s Directorate of Licensing V, $ x ar h
Washington, D.C.
20545
'PM U. S. Atomic Energy Commission Attention:
Mr. S Chapman Gentlemen:
MONTICELLO NUCLEAR' GENERATING PIANT Docket No. 50-263 License No. DPR-22 Monthly Operating Data January, 1974 In accordance with the request of February 19, 1974 from Mr. L Manning Muntzing, the attached operating data is provided.
This information includes a "one-time reporting request" forecast of refueling and major shutdowns for the next five years.
Very truly yours,
.f
- .l-
't%
G H Neils General Superintendent of C ED Nuclear Power Plant Operations
]
A APR181974+ 's CHN/ts h
EGULATORY
?.' Alt SEtyjog cc: J G Keppler D - # CKET CLDtg Attachment D
g dhdd 9212090267 740228 PDR ADOCK 05000263 P
I.
UNIT HONTICELLO NUC1 EAR GENERAT1HG PIANT DATE February 28, 1974 CQ4PLETED BY R L Scheinost MAJOR SilUTDOWN FORECAST (5-year forecast; report one-time only) 1 PURPOSE (s)
BEGIN DATE END DATE Refuelingt majar maintenancet perfonn 3/15/74 6/1/14 inspections and conduct tests required (740315)
(740601) each operating cycle Same 3/15/75 5/11/75 (750315)
(750511)
Jame 2/21/76 4/3/76 (760221)
(760403) game 3/12/77 4/23/77 (770312)
(770423)
Same 3/4/77 4/15/78 (780304)
(780415) a),
UNIT.WiE
}kuticell! Elrar Generating Plant
'IRTE February / 27,E74
/
COMPLElID BY Yk [//2M-dC
(
OPERATING STATUS 1.
REPORTING PERIOD: 0000, 740101
'IO 2400, 740131 GROSS IDURS IN REPORTING PERIOD:
743 (Change to DST)_
2.
CURRENTLY alt 010RIZED POWER LEVEL Wt 1670 We-hTT 559 (Pool Winter Rating, M\\PLA test) 3.
POWER LEVEL TO MlICH RESTRICTED (IF AW):
91%
4.
REASONS FOR RESTRICTIONS (IF AhT):
End of cycle scram reactivity THIS CUMULATIVE hDNDI YR-TO-DATE TO DATE 5.
Il0URS REACTOR WAS CRITICAL 743 743 17,180 6.
HOURS GENERATOR ON-LINE 743 743 16,590 7.
GROSS THER4\\L T0hTR GENERATED (FMI) 1,084,831
_1,084,831 25,596,072 8.
GROSS ELECTRICAL POWER GENERATED (hMf) 374,870 374,870_
8,765,100 9.
NET ELECTRICAL POWER GENERATED (hNi) 360,710 360,710 8,378,508
- 10. REACTOR AVAILABILITY FAcr0R (1) 100%
100%
75.7%
- 11. PLANT AVAILABILITY FACTOR (2) 100%
100%
73.1%
- 12. PLAhT CAPACITY FACIOR (3) 86.8%
86.8%
66.0%
- 13. FORCED OLTrnGE RATE (4) 0 0
Later
- 14. SiluTDOWNS SCHEDULED TO BEGIN IN NEXT 6 h0NDiS (STATE TYPE, DATE, AND DURATION OF EAOl):
Refueling outage, scheduled to start hhrch 15, 1974, duration of 11 weeks.
~~
15.
IF SHirrDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STAR'IUP:-
- 16. PLANTS IN TEST STATUS (DELLTED)
(1) REACTOR AVAILABILITY FACTOR = HOURS REACTOR WAS CRITICAL
- 100 GROSS Il0URS IN REPORTING PERIOD (2) PLAhT AVAILABILITY FACTOR = IDURS GENERATOR ON LINE
- 100 GROSS Il0URS IN REPORTING PERIOD (3) PLAhT CAPACITY FACTOR = NIrr ELECTRICAL POKER GENERATED
- 100 NET DBONSTRAlhD* GROSS IDURS IN REPORTING PERIOD (4) FORCED OlTTAGE RATE = F_0_RCED OUTAGE LOURS
- 100 HOURS GENERATOR ON-LINE + FORChD OlHAGE HOURS
e 2025 EU)SURE A bbnticello hbclear UNIT. Generating Plant IMTE Fo 6 pa Lg7V /
CQ@llD'ED BY MM UadeMC i
/
DAILY 1%T POWER OJnUT hogn{
January, 1974 1
DAY AVERAGE HOUR 1X We-net IRY AVERAGEIl00RLY We net 1
505 25 473 2
503 26 480 3
502 27 476 4
499 28 468 5
471 29
,,_,57 4
6 480 30 453 7
503 31 452 8
_502 9
505 10 503 11 505 12 501 13 501 14 479 15 485 16 485 17
__483 18 484 19 485 20 482 21 483 22 478 23 474 24 472
tu2/
FONTICELID yJC sgr.ngf UNIT NME GENERATI?G PIX
- I' Base loaded power operation for the entire month.
RITORT BONH{ January, 1974 OCNPLETED BY MV M
PIET SUTD0'.0iS TYPE MEDDD OF F-FORCED DURATION SUITING DCLCi NO.
DATE S-SCHEIULED 00URS)
REASON (1)
W E REACIOR (2)
OCIISTS hDNE
\\
(1) PIASON:
(2) MEIW A-EQUIBLT FAILURE (EXPIAIN)
A-Mi'. '