Text
.
. ~... -.
~
g G
"':CLOR'.T'T" 1 O
- 0TICE OF VIOL \\ TID':
License ::o. D??,-50 Based on the results of a ::'tC inspection conducted on February 2'. ~7,1s75 it appears that one of the activitics was not conducted in ful" cenplince with conditions of your license as indicated belote:
Contrary to Criterion III, Appendix B,10 CFR 50 and the FS.'J, Secti:a lA, Operating Quality Assurcnce Plan,Section III, plant design change C/:! 0800, :Iodification of Diesel Generator Air Start 5 sten, was cc.-
/
pleted during 1974 without receiving prior Gensration Engineering Depcrement review and approval as required by Generation Engineering Procedure GP 1003, Control of Design Changes.
i:.; :;,vr This infraction was identified by the inspector and 'aad the potantial for causing or contributing to an occurrence t ith safety significan:e.
f:ll
- \\
(,,)
O 90012345 9
o 4%
7910190 FJP3
.O_
e