Part 21 Rept Re Possible Component Support Interference.Full Five Degree Angular Rotation Not Available When Rigid Sway Struts Connected to Faulty Beam Attachments.Cause & Effects Under Review.Next Rept Due Wk of 850624
ML20125A544
Person / Time
Site: Beaver Valley
Issue date: 06/06/1985
From: Hein W
POWER PIPING CO. (SUBS. OF HARLAN ELECTRIC CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-85-286-000 PT21-85-286, PT21-85-286-000, NUDOCS 8506110104
Download: ML20125A544 (1)


Text

,

POWER PIPING COMPANY 829 BEAVER AVENUE ,

PITTSBURGH, PA.15233 ",",l, "l[,'

June 6, 1985 l l l

l '

United States Nuclear Regulatory Commission '

Office of Inspection and Inforcenent Washington, DC 20555 l

"abj: Potential Component Support j Interfere nce l h

Gentlemen:

l This is to inform you of a potential problem that we are currently evaluating.

We have been notified by the Beaver Valley Power Station - Unit No. 2 that 3 few beam attachments have been furnished by our conpany that result in i

interference probleas when used with rigid sway struts. It has been reported '

that when the strut is connected to these bean attachcents, a full 5 angular rotation is not available. We are currently reviewing the cause of l this interference, its affect on the operation of the rigid sway strut, the quantity of supports that have been furnished with this potential problem and the power plants involved.

It is our intent to nake a more formal report concerning our findings the week of June 24, 1985.

Very truly yours, POWER PIPING COMPANY

=  %

William D. Hein Manager Hanger Engineering WDH/cak CC: W.J. Hoogel T.P. Haynes D.T. Soukup 8506110104 850606 PDR ADOCK 05000412