ML20125A161

From kanterella
Jump to navigation Jump to search
NRC-2018-000831 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed. Part 1 of 2
ML20125A161
Person / Time
Issue date: 04/30/2020
From:
NRC/OCIO
To:
Shared Package
ML20125A158 List:
References
FOIA, NRC-2018-000831
Download: ML20125A161 (180)


Text

From: Ramuhalli Pcacteep To: Hiser Matthew; Purtscher Patrick

Subject:

(External_Sender) Draft report Date: Thursday, November 10, 2016 3:17:44 PM Attachments: First Draft Outline Harvesting PNNL rev2.docx.

M att, Pat, The attached document is a draft and should be treated as such. As discussed, the document is missing some references, and is awaiting some input for the sections on information tools for harvesting. Also note that the section on examples is being rewritten to homogenize the language.

Any feedback on the updates is appreciated.

On the other items:

  • We would prefer to combine the report and t he workshop summary and issue a single report.

This should help with managing costs associated with producing t he report, and will ensure that the report includes t he latest information from the workshop.

  • I w ill work with our financial specia lists t o see where we stand on spending to dat e and antici pated costs t hrough January. I wi ll touch base w ith Pat on Monday about t his.
  • As discussed, it would be helpful to have two people from PNNL (me, plus our materials SME) attend the workshop. This (and the associated planning and post-workshop summa ry generation) will require a modificat ion to the scope and costs on the contract.

Please let me know when you receive t his.

W ith best rega rds, Pradeep Pradeep Ramuha ll i, PhD Sen ior Research Scientist, Applied Physics Group Pacific Northwest National Laboratory 902 Battelle Blvd.

P.O.Box 999, MSIN KS-26 Richland, WA 99352 Tel: 509-375-2763 Emai l: pradeep.ramuhalli@pnol.gov http-//www pool gov

PNNL-SA-XXXXX Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal January 2017 P Ramuhalli SW Glass R Devanathan K Knobbs R Meyer u.a. DEPARTMENT OF ENERGY Prepared for the U.S. Department of Energy under Contract OE-AC0S-76RL01830

(b)(5)

PNNL-SA-XXXXX Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal FM Last FM Last FM Last FM Last January 20 17 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RLO 1830 Pacific Northwest National Laboratory Richland, Washington 99352

(b)(5) iii

V (b)(5) vii

(b)(5) ix

(b)(5)

(b)(5) xi

(b)(5) xii

(b)(5) xiii

(b)(5) (b)(5) l(b)(5)

I I. I

(b)(5) 2.2

(b)(5) l(b)(5)

(b)(5) 3.3

(b)(5)

(b)(5) 3.4

(b)(5) 3.5

(b)(5) 3.6

(b)(5)

(b )(5)

(b)(5) 3.7

(b)(5)

(b )(5) 3.8

(b)(5)

(b)(5) 3.9

3.10 (b)(5)

(b)(5)

3. 11

(b)(5)

3. 12

(b)(5)

3. 13

(b)(5) l(b)(5) 3.14

(b)(5)

3. 15

(b)(5)

3. 16

(b)(5) 4.17

(b)(5) 4.18

(b)(5) 4.19

(b )(5)

(b)(5) 4.20

(b)(5) 4.2 1

(b)(5) 4.22

(b )(5) rb)(5) 4.23

(b)(5) 4.24

(b )(5) 4.25

(b)(5) 5.26

(b)(5) 6.27

(b)(5) 6.28

(b)(5) 7.29

(b)(5)

(b)(5)

A.I

(b)(5)

Distr.1

Pacific Northwest y U. S. DEPARTMENT OF NATIONAL LABORATORY ENERGY Proudly Opcmtcd b)* Ba1lelle Si11ce 1965 902 Battelle Boulevard P.O. Box 999 Richland, WA 99352 1-888-375-PNNL (7665) www.pnnl.gov

From: Ramuhalli Pradeep To: Purtscher Patrick Cc: Hass Kay E; O"Neil Jara Subject : [External_Sender] Harvest ing TLR Date: Thursday, December 07, 201710:32:08 AM Attachments: PNNL-27120 Harvestina-TLR-final-120717 .docx Pat rick, Attached is the cleared TLR, with the PNNL number included . Let me know if you have any questions.

Than ks.

With best regards, Pradeep Pradeep Ramuha ll i, PhD Senior Research Scientist, Applied Physics Group Pacific Northwest National Laboratory 902 Ba tte lle Blvd.

P.O.Box 999, MS IN KS-26 Richla nd, WA 99352 Tel: 509-375-2763 Email: pradeep.ramuhalli@pnn l.gov http'(/www pool gov

PNNL-27120 Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal December 2017 P Ramuhalli SW Glass R Devanathan K Knobbs RM Meyer U .S. DEPARTMENT OF ENERGY

DISCLAIMER Tilis report was prepared as an account of work sponsored by an agency of the United States Government. NeitJier tl1e U1liled States Govermnent nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, ex1,ress or implied, or assumes any legal liability or res1,onsibility for the accuracy, com1,lctcncss, or usefulness of any information, a1,paratus, product, or process disclosed, or re1,resents that its use would not infringe 1,rivatcly owned tights. Reference berein to any specific commercial product, process, or service by trade name, trademark, manufacturer, orothe,wise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Govenuncnt or any agency thereof, or Battelle Memorial Institute. The views and opi1lions of autl10rs expressed herein do not necessarily state or reflect those of tl1e United States Government or any agency thereof.

PACTFIC NORTHWEST NATIONAL LABORATORY operated by BATTELLE for the UNITED STATES DEPARTMENT OF ENERGY under Contract DE-AC05-76RL0/830 Printed in the United States of America Availa ble to DOE a nd DOE contractors from the 0111cc of Scicntlflc and Tcchnknl lnfor11111tlon, P.O. Box 62, Oak Ridge, T N 37831-0062; ph: (865) 576-8401 fax: (865) 576-5728 email: report "adonis.osti.go,*

Available to the public from the National Technical Information Service 5301 Shawnee Rd., Alexandria, VA 22312 ph: (800) 553-NT IS (6847) email: ordersralntis.go,* <http://www.ntis.gov/a bout/form.aspx>

Online o r*dc d.n g: http://www.ntis.gO\'

@ Tllis document was printed on recycled paper.

(8/2010)

PNNL-27120 Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal P Ramuhalli SW Glass R Devanathan K Knobbs RM Meyer December 201 7 Prepared for the U.S . Nuclear Regulatory Commission under a Related Services Agreement with the U.S. Department of Energy Contract DE-AC05-76RLO 1830 Pacific Northwest National Laboratory Richland, Washington 99352

(b)(5)

Ill

(b)(5)

V

(b )(5)

Vil

(b)(5)

IX

(b)(5)

XI

(b)(5)

X II

(b)(5)

(b)(5) 2

(b)(5) 3

(b)(5) 4

(b)(5) 5

(b)(5) 6

(b)(5) 7

(b)(5) 8

(b)(5) 9

(b)(5) 10

(b)(5) 11

(b)(5) 12

(b)(5) 13

(b)(5) 14

(b)(5) 15

(b)(5) 16

(b)(5) 17

(b)(5) 18

(b)(5) 19

(b )(5) 20

(b)(5) 21

(b)(5) 22

(b)(5) 23

(b)(5) 24

(b)(5) 25

(b)(5) 26

(b)(5) 27

(b)(5) 28

(b)(5) 29

(b)(5) 30

(b)(5) 31

(b)(5) 32

(b)(5) 33

(b)(5) 34

(b)(5) 35

(b )(5) 36

Pacific Northwest

~

NATIONAL LABORATORY Proudly Operated by Banelle Since 1965 902 Battelle Boulevard P.O. Box 999 Richland, WA 99352 1-888-375-PNNL (7665) www.pnnl.gov Prepared for the U.S. Nuclear Regulatory Commission U.S. DEPARTMENT OF under a Related Services Agreement with the U.S. Department of Energy CONTRACT DE-ACOS-76RL01830 ENERGY

From: Ramuhalli Pradeep To : Purtscher Patrick Subject : [External_Sender) RE : draft report from PNNL on Harvesting project Date: Monday, Dece mber 04, 2017 4:23:19 PM Attachments: Harvestng-TLR-linal DRAFT-120417.docx

Patrick, I don't recall if I got this back to you or not. If not, attached is the updated version. In addition to the editorial changes you suggested, an internal peer review caught a few more editorial changes (format checks, grammatica l issues). These are in the attached .

With best regards, Pradeep Ramuhal li, PhD Tel : 509-375-2763 Email: pradeep.ramuhal li@pnnl .gov From: Purtsc her, Patrick [mailto :Patrick.Purtscher@nrc.gov]

Sent: Fri day, November 24, 2017 10:05 AM To: Ramuhall i, Pradeep <Pradeep.Ramuha ll i@pn nl.gov>

Subject:

FW: draft report from PNNL on Ha rvesting project Good afternoon, Here is the report with some little editorial changes that we would li ke you to make before we send it through for management approva l.

Pat

PNNL-XXXXX Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal December 2017 P Ramuhalli SW Glass R Devanathan K Knobbs RM Meyer U .S. DEPARTMENT OF ENERGY

DISCLAIMER Tilis report was prepared as an account of work sponsored by an agency of the United States Government. NeitJier tl1e U1liled States Govermnent nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, ex1,ress or implied, or assumes any legal liability or res1,onsibility for the accuracy, com1,lctcncss, or usefulness of any information, a1,paratus, product, or process disclosed, or re1,resents that its use would not infringe 1,rivatcly owned tights. Reference berein to any specific commercial product, process, or service by trade name, trademark, manufacturer, orothe,wise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Govenuncnt or any agency thereof, or Battelle Memorial Institute. The views and opi1lions of autl10rs expressed herein do not necessarily state or reflect those of tl1e United States Government or any agency thereof.

PACTFIC NORTHWEST NATIONAL LABORATORY operated by BATTELLE for the UNITED STATES DEPARTMENT OF ENERGY under Contract DE-AC05-76RL0/830 Printed in the United States of America Availa ble to DOE a nd DOE contractors from the 0111cc of Scicntlflc and Tcchnknl lnfor11111tlon, P.O. Box 62, Oak Ridge, T N 37831-0062; ph: (865) 576-8401 fax: (865) 576-5728 email: report "adonis.osti.go,*

Available to the public from the National Technical Information Service 5301 Shawnee Rd., Alexandria, VA 22312 ph: (800) 553-NT IS (6847) email: ordersralntis.go,* <http://www.ntis.gov/a bout/form.aspx>

Online o r*dc d.n g: http://www.ntis.gO\'

@ Tllis document was printed on recycled paper.

(8/2010)

PNNL-XXXXX Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal P Ramuhalli SW Glass R Devanathan K Knobbs RM Meyer December 201 7 Prepared for the U.S. Nuclear Regulatory Commission under a Related Services Agreement with the U.S. Department of Energy Contract DE-AC05-76RLO 1830 Pacific Northwest National Laboratory Richland, Washington 99352

(b)(5)

Ill

(b )(5)

V

(b)(5)

Vil

(b)(5)

IX

(b)(5)

XI

(b )(5)

X II

(b)(5)

(b )(5) 2

(b)(5) 3

(b)(5) 4

(b)(5) 5

(b )(5) 6

(b)(5) 7

(b )(5) 8

(b)(5) 9

(b)(5) 10

(b)(5) 11

(b)(5) 12

(b)(5) 13

(b)(5) 14

(b)(5) 15

(b)(5) 16

(b)(5) 17

(b )(5) 18

(b)(5) 19

(b)(5) 20

(b)(5) 21

(b )(5) 22

(b)(5) 23

(b)(5) 24

(b)(5) 25

(b)(5) 26

(b)(5) 27

(b)(5) 28

(b)(5) 29

(b)(5) 30

(b)(5) 31

(b)(5) 32

(b)(5) 33

(b)(5) 34

(b)(5) 35

Pacific Northwest

~

NATIONAL LABORATORY Proudly Operated by Banelle Since 1965 902 Battelle Boulevard P.O. Box 999 Richland, WA 99352 1-888-375-PNNL (7665) www.pnnl.gov Prepared for the U.S. Nuclear Regulatory Commission U.S. DEPARTMENT OF under a Related Services Agreement with the U.S. Department of Energy CONTRACT DE-ACOS-76RL01830 ENERGY

PNNL-SA-XXXXX Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal January 2017 P Ramuhalli SW Glass R Devanathan K Knobbs R Meyer u.a. DEPARTMENT OF ENERGY Prepared for the U.S. Department of Energy under Contract OE-AC0S-76RL01830

(b)(5)

PNNL-SA-XXXXX Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal FM Last FM Last FM Last FM Last January 20 17 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RLO 1830 Pacific Northwest National Laboratory Richland, Washington 99352

(b)(5) iii

l(b)(5)

._____ __JI r (5)

V

(b)(5) vii

(b)(5) ix

(b)(5)

(b)(5) xi

xii (b)(5) xiii

(b)(5)

(b)(5 (5) rb)

I. I

(b)(5) 2.2

(b)(5) l(b)(5)

(b)(5) 3.3

(b)(5) l(b)(5) l(b)(5) l(b)(5) 3.4

(b )(5) 3.5

(b)(5) 3.6

(b)(5) l(b)(5)

(b)(5) 3.7

(b )(5)

(b)(5) 3.8

(b)(5)

(b)(5) 3.9

l(b)(5) 3.10

(b )(5)

(b )(5)

3. 11

(b)(5)

3. 12

(b)(5)

3. 13

(b)(5) 3.14

(b)(5)

3. 15

(b)(5)

3. 16

(b)(5) 4.17

(b)(5) 4.18

(b)(5) 4.19

(b )(5) l(b)(5) 4.20

(b)(5) 4.2 1

(b)(5) 4.22

(b)(5) rb)(5) 4.23

(b)(5) 4.24

(b)(5) 4.25

(b)(5)


r. . _)(-5)_ _ _ _ _ _ _ _ __

5.26

(b)(5) 6.27

(b)(5) 6.28

(b )(5) 7.29

(b)(5)

(b)(5)

A.I

(b)(5)

Distr.1

Pacific Northwest y U. S. DEPARTMENT OF NATIONAL LABORATORY ENERGY Proudly Opcmtcd b)* Ba1lelle Si11ce 1965 902 Battelle Boulevard P.O. Box 999 Richland, WA 99352 1-888-375-PNNL (7665) www.pnnl.gov