ML20125A161

From kanterella
Jump to navigation Jump to search
NRC-2018-000831 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed. Part 1 of 2
ML20125A161
Person / Time
Issue date: 04/30/2020
From:
NRC/OCIO
To:
Shared Package
ML20125A158 List:
References
FOIA, NRC-2018-000831
Download: ML20125A161 (180)


Text

From:

Ramuhalli Pcacteep To:

Subject:

Hiser Matthew; Purtscher Patrick (External_Sender) Draft report Date:

Attachments:

Matt, Pat, Thursday, November 10, 2016 3:17:44 PM First Draft Outline Harvesting PNNL rev2.docx.

The attached document is a draft and should be treated as such. As discussed, the document is missing some references, and is awaiting some input for the sections on information tools for harvesting. Also note that the section on examples is being rewritten to homogenize the language.

Any feedback on the updates is appreciated.

On the other items:

  • We would prefer to combine the report and the workshop summary and issue a single report.

This should help with managing costs associated with producing the report, and will ensure that the report includes the latest information from the workshop.

  • I will work with our financial specialists to see where we stand on spending to date and anticipated costs through January. I will touch base with Pat on Monday about this.
  • As discussed, it would be helpful to have two people from PNNL (me, plus our materials SME) attend the workshop. This (and the associated planning and post-workshop summary generation) will require a modification to the scope and costs on the contract.

Please let me know when you receive this.

With best regards, Pradeep Pradeep Ramuhalli, PhD Senior Research Scientist, Applied Physics Group Pacific Northwest National Laboratory 902 Battelle Blvd.

P.O.Box 999, MSIN KS-26 Richland, WA 99352 Tel: 509-375-2763 Email: pradeep.ramuhalli@pnol.gov http-//www pool gov

PNNL-SA-XXXXX Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal January 2017 P Ramuhalli R Devanathan R Meyer u.a. DEPARTMENT OF ENERGY SW Glass K Knobbs Prepared for the U.S. Department of Energy under Contract OE-AC0S-76RL01830

(b)(5)

PNNL-SA-XXXXX Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal FM Last FM Last January 2017 Prepared for FM Last FM Last the U.S. Department of Energy under Contract DE-AC05-76RLO 1830 Pacific Northwest National Laboratory Richland, Washington 99352

(b )(5) iii

V

(b)(5) vii

(b )(5) ix

(b)(5)

(b)(5) xi

(b)(5) xii

(b)(5) xiii

(b )(5)

(b)(5) l(b)(5)

I I. I

(b)(5) 2.2

(b)(5) l(b )(5)

(b )(5) 3.3

(b )(5)

(b )(5) 3.4

(b)(5) 3.5

(b)(5) 3.6

(b)(5)

(b )(5)

(b)(5) 3.7

(b)(5)

(b )(5) 3.8

(b)(5)

(b)(5) 3.9

3.10

(b)(5)

(b)(5) 3.11

(b )(5) 3.12

(b)(5) 3.13

(b)(5) l(b )(5) 3.14

(b)(5) 3.15

(b)(5) 3.16

(b )(5) 4.17

(b )(5) 4.18

(b )(5) 4.19

(b )(5)

(b)(5) 4.20

(b)(5) 4.21

(b )(5) 4.22

(b )(5) rb)(5) 4.23

(b )(5) 4.24

(b )(5) 4.25

(b )(5) 5.26

(b )(5) 6.27

(b )(5) 6.28

(b)(5) 7.29

(b)(5)

(b)(5)

A.I

(b )(5)

Distr.1

y Pacific Northwest NATIONAL LABORATORY Proudly Opcmtcd b)* Ba1lelle Si11ce 1965 902 Battelle Boulevard P.O. Box 999 Richland, WA 99352 1-888-375-PNNL (7665) www.pnnl.gov U.S. DEPARTMENT OF ENERGY

From:

To:

Cc:

Subject :

Date:

Attachments:

Pat rick, Ramuhalli Pradeep Purtscher Patrick Hass Kay E; O"Neil Jara

[External_Sender] Harvesting TLR Thursday, December 07, 201710:32:08 AM PNNL-27120 Harvestina-TLR-final-120717.docx Attached is the cleared TLR, with the PNNL number included. Let me know if you have any questions.

Than ks.

With best regards, Pradeep Pradeep Ramuha ll i, PhD Senior Research Scientist, Applied Physics Group Pacific Northwest National Laboratory 902 Battelle Blvd.

P.O.Box 999, MSIN KS-26 Richland, WA 99352 Tel: 509-375-2763 Email: pradeep.ramuhalli@pnn l.gov http'(/www pool gov

PNNL-27120 Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal December 2017 P Ramuhalli R Devanathan RM Meyer SW Glass K Knobbs U.S. DEPARTMENT OF ENERGY

DISCLAIMER Tilis report was prepared as an account of work sponsored by an agency of the United States Government. NeitJier tl1e U1liled States Govermnent nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, ex1,ress or implied, or assumes any legal liability or res1,onsibility for the accuracy, com1,lctcncss, or usefulness of any information, a1,paratus, product, or process disclosed, or re1,resents that its use would not infringe 1,rivatcly owned tights. Reference berein to any specific commercial product, process, or service by trade name, trademark, manufacturer, orothe,wise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Govenuncnt or any agency thereof, or Battelle Memorial Institute. The views and opi1lions of autl10rs expressed herein do not necessarily state or reflect those of tl1e United States Government or any agency thereof.

PACTFIC NORTHWEST NATIONAL LABORATORY operated by BATTELLE for the UNITED STATES DEPARTMENT OF ENERGY under Contract DE-AC05-76RL0/830 Printed in the United States of America Available to DOE and DOE contractors from the 0111cc of Scicntlflc and Tcchnknl lnfor11111tlon, P.O. Box 62, Oak Ridge, TN 37831-0062; ph: (865) 576-8401 fax: (865) 576-5728 email: report "adonis.osti.go,*

Available to the public from the National Technical Information Service 5301 Shawnee Rd., Alexandria, VA 22312 ph: (800) 553-NTIS (6847) email: ordersralntis.go,* <http://www.ntis.gov/a bout/form.aspx>

Online or*dcd.ng: http://www.ntis.gO\\'

@ Tllis document was printed on recycled paper.

(8/2010)

PNNL-27120 Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal P Ramuhalli R Devanathan RM Meyer December 201 7 Prepared for SW Glass K Knobbs the U.S. Nuclear Regulatory Commission under a Related Services Agreement with the U.S. Department of Energy Contract DE-AC05-76RLO 1830 Pacific Northwest National Laboratory Richland, Washington 99352

(b)(5)

Ill

(b)(5)

V

(b )(5)

Vil

(b)(5)

IX

(b)(5)

XI

(b )(5)

X II

(b)(5)

(b )(5) 2

(b)(5) 3

(b)(5) 4

(b)(5) 5

(b)(5) 6

(b)(5) 7

(b )(5) 8

(b )(5) 9

(b)(5) 10

(b )(5) 11

(b)(5) 12

(b )(5) 13

(b )(5) 14

(b )(5) 15

(b )(5) 16

(b )(5) 17

(b)(5) 18

(b )(5) 19

(b )(5) 20

(b)(5) 21

(b)(5) 22

(b )(5) 23

(b)(5) 24

(b )(5) 25

(b)(5) 26

(b )(5) 27

(b)(5) 28

(b)(5) 29

(b)(5) 30

(b)(5) 31

(b )(5) 32

(b)(5) 33

(b)(5) 34

(b)(5) 35

(b )(5) 36

~

Pacific Northwest NATIONAL LABORATORY Proudly Operated by Banelle Since 1965 902 Battelle Boulevard P.O. Box 999 Richland, WA 99352 1-888-375-PNNL (7665) www.pnnl.gov Prepared for the U.S. Nuclear Regulatory Commission under a Related Services Agreement with the U.S. Department of Energy CONTRACT DE-ACOS-76RL01830 U.S. DEPARTMENT OF ENERGY

From:

To:

Subject :

Date:

Attachments:

Patrick, Ramuhalli Pradeep Purtscher Patrick

[External_Sender) RE: draft report from PNNL on Harvesting project Monday, December 04, 2017 4:23:19 PM Harvestng-TLR-linal DRAFT-120417.docx I don't recall if I got this back to you or not. If not, attached is the updated version. In addition to the editorial changes you suggested, an internal peer review caught a few more editorial changes (format checks, grammatical issues). These are in the attached.

With best regards, Pradeep Ramuhal li, PhD Tel : 509-375-2763 Email: pradeep.ramuhal li@pnnl.gov From: Purtscher, Patrick [1]

Sent: Friday, November 24, 2017 10:05 AM To: Ramuhall i, Pradeep <Pradeep.Ramuha lli@pnnl.gov>

Subject:

FW: draft report from PNNL on Harvesting project Good afternoon, Here is the report with some little editorial changes that we would like you to make before we send it through for management approva l.

Pat

PNNL-XXXXX Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal December 2017 P Ramuhalli R Devanathan RM Meyer SW Glass K Knobbs U.S. DEPARTMENT OF ENERGY

DISCLAIMER Tilis report was prepared as an account of work sponsored by an agency of the United States Government. NeitJier tl1e U1liled States Govermnent nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, ex1,ress or implied, or assumes any legal liability or res1,onsibility for the accuracy, com1,lctcncss, or usefulness of any information, a1,paratus, product, or process disclosed, or re1,resents that its use would not infringe 1,rivatcly owned tights. Reference berein to any specific commercial product, process, or service by trade name, trademark, manufacturer, orothe,wise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Govenuncnt or any agency thereof, or Battelle Memorial Institute. The views and opi1lions of autl10rs expressed herein do not necessarily state or reflect those of tl1e United States Government or any agency thereof.

PACTFIC NORTHWEST NATIONAL LABORATORY operated by BATTELLE for the UNITED STATES DEPARTMENT OF ENERGY under Contract DE-AC05-76RL0/830 Printed in the United States of America Available to DOE and DOE contractors from the 0111cc of Scicntlflc and Tcchnknl lnfor11111tlon, P.O. Box 62, Oak Ridge, TN 37831-0062; ph: (865) 576-8401 fax: (865) 576-5728 email: report "adonis.osti.go,*

Available to the public from the National Technical Information Service 5301 Shawnee Rd., Alexandria, VA 22312 ph: (800) 553-NTIS (6847) email: ordersralntis.go,* <http://www.ntis.gov/a bout/form.aspx>

Online or*dcd.ng: http://www.ntis.gO\\'

@ Tllis document was printed on recycled paper.

(8/2010)

PNNL-XXXXX Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal P Ramuhalli R Devanathan RM Meyer December 201 7 Prepared for SW Glass K Knobbs the U.S. Nuclear Regulatory Commission under a Related Services Agreement with the U.S. Department of Energy Contract DE-AC05-76RLO 1830 Pacific Northwest National Laboratory Richland, Washington 99352

(b)(5)

Ill

(b )(5)

V

(b)(5)

Vil

(b )(5)

IX

(b)(5)

XI

(b )(5)

X II

(b)(5)

(b )(5) 2

(b)(5) 3

(b )(5) 4

(b)(5) 5

(b )(5) 6

(b )(5) 7

(b )(5) 8

(b)(5) 9

(b)(5) 10

(b )(5) 11

(b )(5) 12

(b)(5) 13

(b)(5) 14

(b)(5) 15

(b)(5) 16

(b )(5) 17

(b )(5) 18

(b )(5) 19

(b)(5) 20

(b )(5) 21

(b )(5) 22

(b)(5) 23

(b )(5) 24

(b )(5) 25

(b)(5) 26

(b)(5) 27

(b )(5) 28

(b)(5) 29

(b )(5) 30

(b )(5) 31

(b )(5) 32

(b )(5) 33

(b)(5) 34

(b )(5) 35

~

Pacific Northwest NATIONAL LABORATORY Proudly Operated by Banelle Since 1965 902 Battelle Boulevard P.O. Box 999 Richland, WA 99352 1-888-375-PNNL (7665) www.pnnl.gov Prepared for the U.S. Nuclear Regulatory Commission under a Related Services Agreement with the U.S. Department of Energy CONTRACT DE-ACOS-76RL01830 U.S. DEPARTMENT OF ENERGY

PNNL-SA-XXXXX Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal January 2017 P Ramuhalli R Devanathan R Meyer u.a. DEPARTMENT OF ENERGY SW Glass K Knobbs Prepared for the U.S. Department of Energy under Contract OE-AC0S-76RL01830

(b)(5)

PNNL-SA-XXXXX Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal FM Last FM Last January 2017 Prepared for FM Last FM Last the U.S. Department of Energy under Contract DE-AC05-76RLO 1830 Pacific Northwest National Laboratory Richland, Washington 99352

(b)(5) iii

l(b )(5) r (5)

.____ _ __JI V

(b)(5) vii

(b )(5) ix

(b)(5)

(b)(5) xi

xii

(b )(5) xiii

(b )(5)

(b)(5 rb)

(5)

I. I

(b)(5) 2.2

(b)(5) l(b )(5)

(b )(5) 3.3

(b)(5) l(b )(5) l(b)(5) l(b)(5) 3.4

(b )(5) 3.5

(b)(5) 3.6

(b )(5) l(b)(5)

(b)(5) 3.7

(b )(5)

(b)(5) 3.8

(b)(5)

(b)(5) 3.9

l(b)(5) 3.10

(b )(5)

(b )(5) 3.11

(b)(5) 3.12

(b)(5) 3.13

(b )(5) 3.14

(b)(5) 3.15

(b )(5) 3.16

(b)(5) 4.17

(b )(5) 4.18

(b)(5) 4.19

(b )(5) l(b)(5) 4.20

(b)(5) 4.21

(b )(5) 4.22

(b )(5) rb)(5) 4.23

(b )(5) 4.24

(b)(5) 4.25

(b)(5)


r

.... _)(-5) _________

5.26

(b)(5) 6.27

(b)(5) 6.28

(b )(5) 7.29

(b)(5)

(b )(5)

A.I

(b )(5)

Distr.1

y Pacific Northwest NATIONAL LABORATORY Proudly Opcmtcd b)* Ba1lelle Si11ce 1965 902 Battelle Boulevard P.O. Box 999 Richland, WA 99352 1-888-375-PNNL (7665) www.pnnl.gov U.S. DEPARTMENT OF ENERGY