ML20118D184
| ML20118D184 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 09/30/1992 |
| From: | Haltiwanger J, Skolds J SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9210090377 | |
| Download: ML20118D184 (5) | |
Text
_
10CFR50.36 fg S,Qcy,gn neanc a ou con +any g,gS;,y g, d%g' '
.an..
- n. se m,s oudee ow-4
(*.v)3) 7 48., 4Q4ll SOE&G m.
October 6,1992 I
Document Control Desk e
U. S. Nuclear Regulatory Commission
'4ashington, DC 20555 Attention: Director, Of fice of Resource Management Gentlemen:
Subjea: VIRGIL C. SUMMER HUCLEAR STATION DOCKET NO. 50/395 l
OPERATING LICENSE NO. NPf-12 SEPTEMBER MONillLY OPERATING REP i Enclosed is the September 1992 Monthly Operating Report for the Virgil C.
Summer Nuclear Station Unit No. 1.
This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.
If there are any questions, please call me at your convenience.
Very truly yours, LL NI John L. Skolds JWil:RJB: led Attachments c:
- 0. W. Dixon J. W. Flitter R. R. Mahan F. Yost R. J. White INP0 Records Center S. D. Ebneter Marsh & McL:n.an G. F. Wunder Pat Haught (Westinghouse)
General Managers NSRC G. J. Taylor RTS (MON 2000)
NRC Resident inspector file (818.03-1)
- 1. B. Anotts Jr.
$$ft00
@CK05000395 77 920930 R
fBM NUCllAR EXCELLLNCE - A SIJMMER TRADIT10Hi
///
m
_....__..- _ _._ -.... ~ _.... _.
._-.___.___..m
._.___m..__,
T
. l i
Director, Office of Resource Mariagement F
September Monthly opera Ing Report Page 1 s
- t b
ATIACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKE* NO.
50/395 UNIT V. C. SUMMER I r
DATE 10/ 1/92 COMPLETED BY J. W.
HALT!WANGER TELEPHONE (803) 345-4297 i
SEPTEMBER 1997 i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PObf4 LEVEL-(MWe-Net)
(MWe-Net) 1.
878 17.
884 E
2.
882 18.
885 I
3.
984 19; 886 4.
884 20, 885 5.
878 21.
884 6.
877 22.
885 7
883 23.
864 8.
884 24.
885 9.
884 25.
887 10, 885 26.
886 11.
883 27, 887 12.
883 28.
886.
13.
883 29.
886 14.
883 30.
886 i
15.
884
- 16.
'885 i
9 a
?
l 6-
.,L...,.,
,,i,,
,m..
y
- y..,,
,A_,...
.,,, ~.,,
,c.,m,
- v. 7
Director, Office of Resource Managerent September Monthly Oparating Report lage 2 ATTACl! MENT II OPERATING DATA REPORT DOCKET NO.
50/395 UNIT Y.
C. SUHMER 1 DATE 10/ 1/92 COMPLETED BY J J.
IIALTIWANGER TELEPilONE
_dO3) 345-4' ;-7
>PEPATING STATUS 1.
Reporting Periodi Septt:-Der 1392 Gross Hours in Report 2ng PertoC:
120 2.
Currently Authorszed Power Level (MWL):
2775 Max. Depend. Capacity (MWe-Net):
885 Design Electrical Rating (MWe-Net):
900 3.
Power Level to Wnich Restricted (It Any)(MWe-Net):
N/A 4.
Reasnns for Restrictions:
N/A 3
Tills MONTM YR TO DATE CUMULATIVE
- 5. Number of liours Reactor Crit ical 720.0 6344.1 60968.7 6.
Reactor Reserve Shutdown h u'.s 0.0 0.0 0.0 7.
Itours Generator on Line 720.0 6323.6 59811.3
- 8. Unit Reserve Shutdown flours 0.0 0.0 0.0
- 9. Grors Therme.1 Energy Generated (MWH) 1995350 17354302 155923069
- 10. Cross Electrical Energy (MWil) 663210 5789730 51175129
- 11. Het Electrical Energy Generated (MWH) 636383 5546969 49094251
- 12. Reactor Service factor 100.0 96.5 79.5
- 13. Reactor Availability Factor 100.0 96.5 79.5
- 14. Unit Service Factor 100.0 96.2 78.0
- 15. Unit Availability Factor 100.0 96.2 78.0
- 16. Unit Capacity Factor (Using MDC) 99.9 95.3 72.3
- 17. Unit Capacity Factor ( De s i g t.
MWe) 98.2 93.7 71.1
- 18. Unit Forced Outage Rate 0.0 0.0 6.1 19 Shutdowns Scheduled Over Next 6 Months (Type, date & Duration of Each):
Refueling, March 5,
'993, 55 days.
- 20. If Shut Down at End of Report Period, Est1 mated Date of Startup: N/A
- 21. Units in Test Status (Prior to Commercial Operation):
N /i.
l i
)
e Director, Office of Resuurce Management September Honthly Operating Report Page 3
~
ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 10/ 1/92 COMPLETED BY J.
W.
HALTIWANGER TELEI' HON E (803) 345-4297 SEPTEMBER 1992 NO.
DATE TYPE DURATICN REASON HETHOD CORRECTIVE ACTION /CCMMENTS NONE 1.0 REASON As Equipment railure
-i B: Maintenance or Test C: Refueling U Regulatary Restriction E Operator Training and License' Examination P Administrative G Operational Error H Other (Explain) l 2.0 METHOD 1: Manual 2 Manual Scram 3: Automatic Scram 4: Continuation (Use initial Date) 5: Power Reductian (Duration 0,0)
- 9. Other'(Explain) t 6
l l
)
i
... _. _. _ ~,... _,., _.. _.
u.
~, -
_,. _. _ _. _ _.. _ _ _ _. =. _ _. _. _ _ _ _... _ _.. _.. __..._..._...
m _.
.__._.__m 1
Director, Office of Resource Management I
Septemoer Monthly Operating Report Page 4 ATTACHMENT IV
~
NARr.ATIVE S!!HMARY Or OPERATING EXPERIENCE DOCKET NO.
50/395
- UNIT V. C. SUMMER I DATE-10/ 1/92 COMPLETED BY J, W.
IIALT!WANGER TELEPHONE (803) 345-4297-SEPTEMBER 1992
-V.
C.
Summer Station, Unit 1,
operated at approximately 100 percent power for the entire month of September.
e 3
6 I
h I
e l.
I l
._-....;_._. _u...__
__