ND-20-0485, ITAAC Closure Notification on Completion of ITAAC 2.2.03.08c.iv.04 (Index Number 186)

From kanterella
(Redirected from ML20118C419)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC 2.2.03.08c.iv.04 (Index Number 186)
ML20118C419
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/27/2020
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 2.2.03.08c.iv.04, ND-20-0485
Download: ML20118C419 (6)


Text

Michael J. Yox 7825 River Road

^Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtie3& 4 706-848-6459 tei April 27, 2020 Docket Nos.: 52-026 ND-20-0485 10CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 ITAAC Closure Notification on Completion of ITAAC 2.2.03.08c.iv.04 [Index Number 1861 Ladies and Gentlemen; In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant(VEGP) Unit 4 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.2.03.08c.iv.04 [Index Number 186]. This ITAAC verifies that the maximum elevation of the top inside surface of the Passive Residual Heat Removal Heat Exchanger(PRHR HX) outlet line to Steam Generator(SG) connection is less than the elevation of the PRHR HX lower channel head top inside surface. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted, Michael J. Yox Regulatory Affairs Dir^tor Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 4 Completion of ITAAC 2.2.03.08c.iv.04 [Index Number 186]

MJY/WLP/sfr

U.S. Nuclear Regulatory Commission ND-20-0485 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKlnney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones (w/o enclosures)

Mr. G. Chick Mr. M. Page Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. R.L Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Requlatorv Commission Mr. W. Jones (w/o enclosures)

Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. 8. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Mr. G. Armstrong Ms. T. Lamb Mr. M. Webb Mr. T. Fredette Mr. C. Weber Mr. S. Smith Mr. C. Santos Mrs. M. Bailey Mr. S. Rose Mr. B. Davis Mr. J. Vasquez Mr. J. Eargie Ms. K. Carrington Mr. P. Heher

U.S. Nuclear Regulatory Commission ND-20-0485 Page 3 of 3 Mr. M. King Mr. E. Davidson Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authoritv of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hosier, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-20-0485 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-20-0485 Enclosure Vogtle Electric Generating Riant(VEGP) Unit 4 Compietion of iTAAC 2.2.03.08c.iv.04[index No. 186]

U.S. Nuclear Regulatory Commission ND-20-0485 Enclosure Page 2 of 3 ITAAC Statement Design Commitment:

8.c) The PXS provides RCS makeup, boration, and safety injection during design basis events.

inspections.Tests. Anaivsis:

iv) inspections of the elevation of the following pipe lines will be conducted:

4. PRHR HX outlet line to SG connection Acceptance Criteria:

iv) The maximum elevation of the top inside surface of these lines is less than the elevation of:

4. PRHR HX lower channel head top inside surface ITAAC Determination Basis Multiple ITAAC are performed to demonstrate that the Passive Core Cooling System (PXS) provides Reactor Coolant System (RCS) makeup, boration, and safety injection during design basis events. This ITAAC requires that inspections be conducted to verify that the maximum elevation of the top inside surface of the Passive Residual Heat Removal Heat Exchanger (PRHR HX)outlet line to Steam Generator(SG)connection is less than the elevation of the PRHR HX lower channel head top inside surface.

The inspections of the PRHR HX outlet line to SG connection top-of-pipe surface was performed using survey equipment in accordance with the site survey and measurement procedure (Reference 1). The conservative wall thickness, derived from installed pipe data, was subtracted from the top-of-pipe survey data to obtain the highest elevation of the inside surface of these lines (Reference 2). The elevation of the PRHR HX lower channel head top outside surface was determined using survey equipment in accordance with the site survey and measurement procedure (Reference 1). As-built manufacturer's data was used to derive the PRHR HX lower channel head wall thickness. The PRHR HX lower channel head top inside surface elevation was then determined by subtracting the as-built manufactrurer's lower channel head wall thickness from the top outside surface of the lower channel head (Reference 2). The maximum derived elevation of the top inside surface of the PRHR HX outlet line to SG connection was compared to the derived elevation of the top inside surface of the PRHR HX lower channel head.

The inspection results documented in Reference 2 verify that the maximum elevation of the PRHR HX outlet line to SG connection top inside surface is 110.5 feet and the elevation of the PRHR HX lower channel head top inside surface is 112.0 feet, which meets the ITAAC acceptance criteria. The Reference 2 inspection results are available for NRG inspection as part of the ITAAC Completion Package (Reference 3).

U.S. Nuclear Regulatory Commission ND-20-0485 Enclosure Page 3 of 3 ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.2.03.08c.iv.04 was performed for VEGP Unit 4 and that the prescribed acceptance criteria are met. Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References favallable for NRC Inspection)

1. 26139-000-4MP-T81C-N3201, Rev 5,"Construction Survey"
2. SV4-PXS-FSK-800186, Rev 1,"Unit 4 As-Built PRHR HX Outlet Lines Elevation Comparison to PRHR HX Lower Channel Head Top Inside Surface Elevation"
3. 2.2.03.08c.iv.04-U4-CP-Rev0,"Completion Package for the Unit 4 ITAAC 2.2.03.08c.iv.04

[Index Number 186]"