ML20118A811

From kanterella
Jump to navigation Jump to search
Corrected TS Page 3/4-12a to Amend 73 to License NPF-30. Corrects Two Typos
ML20118A811
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/18/1992
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20118A812 List:
References
NUDOCS 9209280191
Download: ML20118A811 (2)


Text

__

MBLE 4.3-1 (Continued)

TABLE NOTAT10f4S (10) !

"oint verification is not required.

(11) following maintenance or adjustment of the Reactor trip breakers, the TRIP ACTUATING DEVICE OPERATIONAL TEST shall include independent verifi-cation of the Undervoltage and Shunt trips.

(12) At least once per 18 months during shutdown, verify that on a simulated Boron Dilution Doubling test signal the normal C.JS discharge valves will close and the centrifugal charging pumps suction valves from the RWST will open within 30 seconds.

(13) Deleted (14) Deleted (15)

The surveillance MODES 9ecified for these channels in Table 4.3-2 are more restrictive and, therefore, applicable.

(16)

TheTRIPACTUATjNGDEVICEOPERATIONALTESTshallindependentlyverify the OPERABillTY of the Undervoltage and Shunt Trip circuits for the l

Manual Reactor Trip function.

The test shall also verify the OPERABILITY of the Bypass Breaker trip circuit.

(17) local manual shunt trip prior to placing breaker in service.

(18) Automatic Undervoltage Trip.

Complite verifTeation of 0FTRAlf1EIIY of the manual reactor trip switch circuitry shall be performed pri-to startup from the first shutdown to Mode 3 occurring after August 7, 1992.

CALLAWAY - UNIT 1 3/4 ?-12a Amendment No. +9, M, 34, 67, 64, 73

$k D$ o 3

f Mr. D. f. Sc hnell Callaway Plant Union llectric Company Unit No. 1 (c:

Cermak fletcher Associates Mr. Bart D. Withers 18225 flower Hill Way #A Presidont and Chief Gaithersburg, Maryland 20879-5334

[xecutive Officer Wolf Creek Nuclear Operating Corporation Gerald Charnoff, [sq.

P.O. Box 411 lhomas A. Baxter, (sq.

liurlington, Kansas 60839 Shaw, Pittman, Potts & 1rowbridge 2300 N. Street, fi.W.

Mr. Dan 1. Bolef, President Washington, D.C.

20037 Kay Drey, Representative lloard of Directors Coalition W

1. P. $harley for the invironment Supervising Ingineer, 6267 Delmar Boulevard Site Licensing University City, Missouri 65136 Union Ilectric Company Post Office liox 620 fulton, flissouri 65251 U.S. fluclear Regulatory Commission Resident inspectors Office RR*)

Steedman, Missouri 65077 fir. Alan C. Passwater, Manager licensing and fuels Union Electric Company Post Office Box 149 St. Louis, Missouri 63166 Manager - [lectric Department flissourt Public Service Commission 301 W. liigh Post Of fice liox 360 Jefferson City, Missouri 65102 Regional Administrator U.S. NRC, Region 111 l

799 Roosevelt Road l

Glen Lilyn, Illinois 60137 Mr Ronald A. Kucera, Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 6510?

l l

t