T,M M ""S
....M7.l...-?**""*""_.
- - -. - - -...,. ~
~
... ~..
i.
Omaha Public Power District 444 South 16th Street Mall Omaha, Net >raia 68102-2247 402/636 2000 August 26, 1992 LIC-92-294R V. S. Nuclear Regulatory Commission ATIN: Document Control Desk Mail Station Pl-137 Washington, DC 20555
Reference:
Docket No. 50-285 Gentlemen:
SUBJECT:
Trrnsmittal of fort Calhoun Station (fCS) Cycle 14 Core Operating Limit Report (COLR) - Revision 2 in accordance with FCS Technical Specification 5.9.5, attached is a copy of Revision 2 to the FCS Cycle 14 COLR dated August 17, 1992.
In Revision 2, Section 6.0 and figure 3 have been revised to reflect an increase in the peak linear heat rate, if you should have any questions, please contact me.
Sincerely, Of Q
f,Q W. G. G tesDivision Manager Nuclear Operations WGG/grc Attachment c:
LeBoeu.
Lamb, Leib & MacRae J.L.Mllboan,NRC egional Administrator, Region IV R. P. Mullikin, NRC Senior Resident inspector S. D. Bloom, NRC Acting Project Manager l
l l
l 9209020341 920826 PDR ADOCK 05000285 P
p99 c5 5m Emre,wt e Equal Ortatung l
)