Forwards Rev 2 to Fort Calhoun Station Cycle 14 Core Operating Limits Rept. Section 6.0 & Figure 3 Revised to Reflect Increase in Peak Linear Heat Rate
ML20118A391
Person / Time
Site: Fort Calhoun 
Issue date: 08/26/1992
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20118A392 List:
References
LIC-92-294R, NUDOCS 9209020341
Download: ML20118A391 (1)


Text

.

T,M M ""S

....M7.l...-?**""*""_.

- - -. - - -...,. ~

~

... ~..

i.

Omaha Public Power District 444 South 16th Street Mall Omaha, Net >raia 68102-2247 402/636 2000 August 26, 1992 LIC-92-294R V. S. Nuclear Regulatory Commission ATIN: Document Control Desk Mail Station Pl-137 Washington, DC 20555

Reference:

Docket No. 50-285 Gentlemen:

SUBJECT:

Trrnsmittal of fort Calhoun Station (fCS) Cycle 14 Core Operating Limit Report (COLR) - Revision 2 in accordance with FCS Technical Specification 5.9.5, attached is a copy of Revision 2 to the FCS Cycle 14 COLR dated August 17, 1992.

In Revision 2, Section 6.0 and figure 3 have been revised to reflect an increase in the peak linear heat rate, if you should have any questions, please contact me.

Sincerely, Of Q

f,Q W. G. G tesDivision Manager Nuclear Operations WGG/grc Attachment c:

LeBoeu.

Lamb, Leib & MacRae J.L.Mllboan,NRC egional Administrator, Region IV R. P. Mullikin, NRC Senior Resident inspector S. D. Bloom, NRC Acting Project Manager l

l l

l 9209020341 920826 PDR ADOCK 05000285 P

p99 c5 5m Emre,wt e Equal Ortatung l

)