.< w ENTERGY I"Mff"'"'"'"""'
Ibn Gibson.MS 39150 Tet 601437 2800 J
C. R. Hutchinson September 5, 1996 gg"'
Grand Gull Nuclear Stahon U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C. 20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 Cycle 9 Reload Response to NRC Request for Additional Information regarding Minimum Critical Power Safety Limit I
Reference:
1.
NRC Letter GNRl-96/00177 dated August 22,1996 related to the Grand Gulf Nuclear Station Cycle 9 SLMCPR (PCOL 96/008, Revision 1).
2.
GNRO-96/0087, Revision to Proposed Amendment to the Operating License PCOL-96/008, Revision 1)
GNRO-96/00100 Gentlemen:
Please find attached Entergy Operations, Inc. response to the NRC request for additional information (Reference GNRI-96/00177) regarding the proposed amendment to the Grand Gulf Nuclear Station Operating License for the Cycle 9 Minimum Critical Power Ratio Safety Limit (SLMCPR).
The evaluation that supports the Cycle 9 SLMCPR applies the GESTAR ll methodology, with exception to the generic safety limit. This exception is essential in accommodating actual core design with a mixed vendor core. The GGNS licensing basis currently includes a cycle-specific calculation of the SLMCPR and Technical Specification changes as necessary. A revision to the COLR methodology references in Technical Specification 5.6.5 is provided in Attachment 3 to more explicitly reflect this deviation from the GESTAR ll methodology. Attachment 3 is e page replacement of the Technical Specification changes proposed in Reference 2.
k I The original amendment request had been reviewed and accepted by the Plant Safety h
Review Committee and the Safety Review Committee. The conclusions of the Significant Hazards Considerations for this response remain unchanged.
9609170610 960905 DR ADOCK 0500 6
I l
~ September 5 1996 GNRO-96/00100 i
, Page 2 of 3
-j l
l.
Based on the guidelines in 10CFR50.92, Entergy Operations has concluded that the response to the NRC request for additional information and the revised COLR
' references involve no additional significant hazards considerations.
l General Electric considers portions of the information contained in this submittal to be proprietary. The proprietary portions have been marked by vertical bars in the right hand margin. In accordance with the requirements to 10CFR2.790(b), an affidavit
-(Attachment 4) is enclosed to support the withholding of the information contained in this report from public disclosure j
Entergy Operations requests NRC approval and issuance of Technical Specifications changes by October 15,1996 to allow related work activities to be implemented.
Yours truly, gg
/-
C CG/acgg.
- attachments:
1.
Affirmation per 10CFR50.30 2.
EOl Response to_NRC Request for Additional Information.
3.
Mark-up of Affected Technical Specification Page 4.
GE Affidavit to Support the Withholding of the Information cc:
Mr. J. E. Tedrow (w/a)
Mr. R. B. McGehee (w/a)
)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. J. W. Yelverton (w/a)
Mr. L. 'J. Callan (w/a)
-/l Regional Administrator U.S. Nuclear. Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400
'~
Arlington, TX 76011 Mr. J. N. Donohew, Project Manager (w/a)
L
. Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 1
' Att:chment 1 to GNRO - 96/00100 BEFORE THE
~
UNITED STATES NUCLEAR REGULATORY COMMISSION t
LICENSE NO. NPF-29 DOCKET NO. 50-416 1
IN THE MATTER OF i
i MISSISSIPPI POWER & LIGHT COMPANY
'j and i
SYSTEM ENERGY RESOURCES, INC.
and SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION and ENTERGY OPERATIONS, INC.
l
)
AFFIRMATION I, C. R. Hutchinson, being duly swom, state that I am Vice President, Operations GGNS of Entergy Operations, Inc.; that on behalf of Entergy Operations, Inc., System Energy Resources, Inc., and
.j South Mississippi Electric Power Association I am authorized by Entergy Operations, Inc. to sign and file with the Nuclear Regulatory Commission, this application for amendment of the Operating License of the Grand Gulf Nuclear Station; that I signed this application as Vice President, Operations GGNS cf Entergy Operations, Inc.; and that the statements made and the matters set forth therein are true t nd correct to the best of my knowledge, information and belief.
///7
/ -
C. R. Hutchinson STATE OF MISSISSIPPI COUNTY OF CLAlBORNE
-l
. SUBSCRIBED ANg SWORN T enTernbe, a Notary Public, in and for the County and St
]
before me i
named, this' 8 day of t-
.1996.
(SEAL) d ]#/wu -
' Notary'Public
-'j utsstssim sWEWIDE NOTARY 'BUC FT c0MMISSION EXPIRES JUNE 5.19M My commission expires: EONDED TEEU SIEGAE NOTART SCEVICE
.,