ML20117M589

From kanterella
Jump to navigation Jump to search
Notifies NRC of Addl Rev to Second Interval ISI Program Dates at Unit 2.Dates Will Remain Unchange for Unit 3,per Ltr
ML20117M589
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/12/1996
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9606180641
Download: ML20117M589 (2)


Text

.. _,

.-,,_m._..._.m St: tion Srpport Department

,,y

.10 CFR 50.55a-PECO NUCLEAR r= %v %e" Nuclear Group Headquarters s

ard

A Uw or PECO Emcy

{5 p

June 12,1996 i

Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 i

i k

j U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 i

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Inservice Testing (IST) Program and inservice Inspection (ISI) Program Dates

REFERENCES:

1)

Letter from G. A. Hunger, Jr. (PECO Energy Company) to U.S. Nuclear Regulatory Commission (USNRC), dated March 27,1995 1

i 2)

Letter from G. J. Beck (Philadelphia Electric Company) to USNRC, dated February 25,1991 l

3)

Letter from J. W. Gallagher (Philadelphia Electric Company) to W. T. Russell (USNRC), dated August 17,1988

Dear Sir:

- In the above Referenced letters, the U. S. Nuclear Regulatory Commission (USNRC) was notified of revisions to the dates of the second inservice Inspection (ISI) Program interval for the Peach Bottom Atomic Power Station i

(PBAPS), Units 2 and 3. These revisions were in accordance with the ASME Boiler and Pressure Vessel Code. The purpose of this letter is to notify the i

USNRC of an additional revision to the second interval inservice Inspection (ISI) l Program dates at PBAPS, Unit 2.

iI f/

T 96o61Bo641.96o612

-PDR ADOCK oSooo277 G

PDR

(

{0

June 12,1996 Page 2 in accordance with 10 CFR 50.55a(g)(4), the second interval ISI Program for PBAPS, Units 2 and 3 conforms to ASME Section XI,1980 Edition through Winter 1981 addendum. This edition permits an interval to be decreased or extended by as much as one year, and extended to account for units that are

.)

out of service for 6 months or more (paragraph IWA-2400(c)).

PBAPS. Unit 2 Second Interval ISI Program Date Chance Accordingly, the second interval ISI Program concluding date for PBAPS, Unit 2 will be extended by one year. The revised ISI Program second interval for PBAPS, Unit 2 is:

1 September 19,1986 to November 4,1998 PBAPS. Unit 3 Second Interval ISI Program (No Date Changes) l For PBAPS, Unit 3, the dates will remain as discussed in the Reference 1 letter:

December 23,1985 to November 4,1997 i

PBAPS. Units 2 and 3 Second Interval IST Prooram (No Date Changes)

The second interval inservice Testing (IST) Program dates (which were previously the same as the second interval ISI Program dates) will remain unchanged and are as follows:

PBAPS, Unit 2 September 19,1986 to November 4,1997 PBAPS, Unit 3 December 23,1985 to November 4,1997 If you have any questions, please contact us.

Very truly yours, l

k.

r G. A. Ilunger, r.,

Director-Ucensing oc: