Withdraws Relief Request 12R-11 Re Second 10-yr Interval ISI Program
ML20117M199
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/12/1996
From: Kofron K
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BYRON-96-0173, BYRON-96-173, NUDOCS 9606180216
Download: ML20117M199 (2)


Text

Onnmonweahh r4mm Company v fly ron Generating Wten

'g 4150 North German Church Road

. H) ron,11. 61010 9-'9 i Tel H15;2.4 M411 June 12,1996 LTR: BYRON-96-0173 FILE: 3.11.0321 Ofrice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Revision to Byron Station Second Ten Year Interval Inservice Inspection Program Relief Requests 12R-11 Revision 0,12R-12 Revision 0 Byron Nuclear Power Station, Units 1 and 2 Facility Operating Licenses NPF-37 and NPF-66 jiHC Docket Nos. 50-454 and 50-455 l

Reference:

Request for Additional Information Regarding Second Ten Year Inservice Inspection Program - Byron Station (TAC Nos. M94830 and M94831) dated April 3,1996 for Dockets Nos. STN 50-454 and 50-455.

l In response to the Request for Additional Information (RAI), Byron Station wishes to withdraw Relief Request 12R-11 from review at this time. Byron Station will be re-submitting the relief request to address the issues and comments in the RAI. The revision to the relief will detail the proposed implementation of ASME Code Case N-533 and other programmatic provisions to insure the integrity of mechanical connections. Byron Station still requests an expedited review on Relief Request 12R-12 which provides corrective measures and inspection actions for leaks dmfed on mechanical connections. Comed respectfully requests USNRC Staff evaluation oMelief Request 12R-12 prior to the implementation of our Unit 1 Second Ten Year Inspection Interval implementation date of September 1,1996. =

Byron Station has re-scheduled implementation of the Unit 1 Second Ten Year Inservice Inspection Program to commence on September 1,1996. This remains within the allowable time frame extension provisions in ASME Section XI, article IWA-2400(c) based on Unit I commercial date of September 16,1985. This date reschedule is a direct result of the Byron Unit I current refuel outage BIR07 estimated completion date of July 5,1996. The original schedule was for return to service on May 24,1996, but was extended due to the extensive Steam Generator tube repairs. The re-scheduled Second Interval date allows for completion of First Interval requirements and the incorporation of procedures and plans for the hcond Interval.

9606180216 960612 PDR ADOCK 05000454 O PDR 0050 (p:\96byltrs\9601734ociO61296) 3 g A !!nicom Company

fu Byron Ltr:96-0173 June 12,1996 Page 2.

. Please address any comments or questions regarding this matter to Gary Contrady at 815/234-5441, .

X-2496.

i Sincerely,

.d' l i

K. L. Kofron Station Manager Byron Nuclear Power Station

. KLK/GC/rp j l

cc:' II. J. Miller, NRC Regional Administrator, RIII l G.F. Dick, Jr., Byron Project Manager - NRR l-1. Peterson, Senior Resident Inspector, Byron l