PACIFIC GAS AND ELECTRIC COMPANY E ET NO. 50-275 DIABLO CANYON NUCLEAR POWER PLANT. UNIT NO. 1
)
NiQlDMENT TO FACILITY OPERATING LICENSE l
Amendment No.112 l
License No. DPR-80 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Pacific Gas and Electric Company (the licensee) dated March 13, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in co.iformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and j
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-80 is hereby amended to read as follows:
i 9605310102 960528 PDR ADOCK 05000275 P
. (2)
Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 112, are'hereby incorporated in the license.
Pacific Gas and Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
3.
This license amendment is effective as of its date of issuance.
FOR TiiE NUCLEAR REGULATORY COMMISSION
^
\\
[StevenD. Bloom,ProjectManager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
May 28, 1996 i
[lf"Eug$
UNITED STATES NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 20066-0001 1
\\,... /
PACIFIC GAS AND ELECTRIC COMPANY l
1 DOCKET NO. 50-323 DIABLO CANYON NUCLEAR POWER PLANT. UNIT NO. 2 NiffiDMENT TO FACILITY OPERATING LICENSE l
1 Amendment No. 110 License No. DPR-82 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Pacific Gas and Electric Company (the licensee) dated March 13, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized I
by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby j
amended to read as follows:
l l
l
. (2)
Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised i
through Amendment No. 110, are hereby incorporated in the license. Pacific Gas and Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
l 3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION i
O b.
Steven D. Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
' Changes to the Technical Specifications Date of Issuance:
May 28, 1996
)
4 ATTACHMENT TC LICENSE AMENDMENTS i
AMENDMENT NO. 112 TO FACILITY OPERATING LICENSE NO. OPR-80 AND AMENDMENT NO. 110 TO FACILITY OPERATING LICENSE NO. DPR-82 DOCKET NOS. 50-275 AND 50-323 Revise Appendix A Technical Specifications by removing the pages identified l
below and inserting the enclosed pages. The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change.
The corresponding overleaf pages are also provided to maintain document completeness.
p i
t l
REMOVE INSERT i
3/4 0-2 3/4 0-2 B 3/4 0-3 B 3/4 0-3 i
G w
m
'3/4 LIMITINGCONDITIONSFOROPERATIONANDSURVEILLANCEREQUIREMENTS 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION
- 3. 0.1 Compliance with the Limiting Conditions for Operation contained in the succeeding specifications is required during the OPERATIONAL MDDES or other conditions specified therein; except that upon failure to meet the Limiting Conditions for Operation, the associated ACTION requirements shall be met.
3.0.2 Noncompliance with a specification shall exist when the requirements of the Limiting Condition for Operation and associated ACTION requirements are not met within the specified time intervals. If the Limiting Condition for Operation is restored prior to expiration of the specified time intervals, completion of the ACTION requirements is not required.
3.0.3 When a Limiting Condition for Operation is not met, except as provided in the associated ACTION requirements, within I hour action shall be initiated to place the unit in a MODE in which the specification does not apply by placing it, as applicable, in:
a.
At least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, b.
At least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and c.
At least COLD SHUTDOWN within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Where corrective measures are completed that permit operation under the ACTION requirements, the action may be taken in accordance with the specified time limits as measured from the time of failure to meet the Limiting Condition for Operation.
Exceptions of these requirements are stated in the individual specifications.
This specification is not appliccole in MODE 5 or 6.
~
3.0.4 Entry into an OPERATIONAL MDDE or ot5er specified condition shall not be made when the conditions for the Limiting Conditions for Operation are not met and the associated ACTION requires a shutdown if they are not met within a specified time interval.
Entry into an OPERATIONAL MDDE or specified condition may be made fn accordance with ACTION requirements when conformance to them permits continued operation of the facility for an unlimited period of time.
This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION statements.
Exceptions to these requirements are stated in the individual specifications.
3.0.5 Limiting Conditions for Operation including the associated ACTION re-quirements shall apply to each unit individually unless otherwise indicated as follows:
a.
Whenever the Limiting Conditions for Operation refers to systems or components which are shared by both units, the ACTION requirements will apply to both units simultaneously. This will be indicated in the ACTION section; i
b.
Whenever the Limiting Conditions for Operation applies to only one unit, this will be identified in the APPLICABILITY section of the specification; and c.
Whenever certain portions of a specification contain operating param-eters, Setpoints, etc., which are different for each unit, this will I
be identified in parentheses, footnotes or body of the requirement.
DIABLO CANYON - UNITS 1 & 2 3/4 0-1 Amendment Nos. 55 and 54
~
APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.
4.0.2 Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.
4.0.3 Failure to perform a Surveillance Requirement within the allowed surveillance interval defined by Specification 4.0.2 shall constitute non-compliance with the OPERABILITY requirements for a Limiting Condition for Operation. The tiw limits of the ACTION requirements are applicable at the time it is identi<ied that a Surveillance Requirement has not been performed.
The ACTION requ'.rements may be delayed for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of r.he surveillance when the allowable outage time limits of the ACTION requi?ements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Exceptions to these requirements are stated an the individual specifications.
Surveillance Requirements do not have to b performed on inoperable equipment.
4.0.4 Entry into an OPERATIGML MODE or other specified condition shall not be mGe unless the Surveillance Requirement (s) associated with the Limiting Condition for Operation has been performed within the stated surveillance interval or as otherwise specified. This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.
4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2 and 3 components shall be applicable as follows:
a.
Inservice inspection of ASME Code Class 1, 2 and 3 components and inservice testing of ASME Code Class 1, 2 and 3 pumps, valves, and snubbers shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a; I
b.
Surveillance intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice inspection and testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable as 1
follows in these Technical Specifications:
ASME BOILER AND PRESSURE VESSEL REQUIRED FREQUENCIES FOR CODE AND APPLICABLE ADDENDA PERFORMING INSERVICE TERMINOLOGY FOR INSERVICE INSPECTION AND TESTING INSPECTION AND TESTING ACTIVITIES ACTIVITIES Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days l
67 106,112 DIABLO CANYON - UNITS 1 & 2 3/4 0-2 Unit 1 - Amendment No.
7 Unit 2 - Amendment No. 66r106,110 i
Revised December 21, 1990
! ~ ~
' APPLICABILITY BASES i
surveillance interval was exceeded.
within the allowable outage time limits of the ACTION requirements re i
j.
compliance with the requirements of Specification 4.0.3..
i If the allowable outage time limits of the ACTION requlrements are less j
than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or a shutdown is required to comply with ACTI0h requirements, e.g., Specification 3.0.3, a 24-hour allowance is provided to pemit a delay in implementing the ACTION requirements.
4 complete survefilance Requirements that have not been performed.This prov i
4 of this allowance is to permit the completion of a surveillance before aThe purpose shutdown is required to comply with ACTION requirements or before other remedia measures would be required that may preclude completion of a surveillance.
basis for this allowance includes consideration for plant conditions, adequate The planning, availability of personnel, the time rer.gired to perform the surveillance j
and the safety significance of the deley in completing the required surveillance.,
This provision also provides a time limit for the completion of Surveillance i
ACTION requirements and for completieg Surveillance Re j
i applicabl.e when an exception to the retairements of Specification 4.0.4 is j
allowed.
time limits of the ACTION requirements are applicable at that tim l
Requirements are not met, the time limits of the ACTION req When a 3
j applicable at the time that the surveillance is terminated.
I sent because the ACTION requirements define the reme i
i However, the Surveillance Requiresents have to be met to demonstrate that i
inoperable equipment has been restored to OPERABLE status.
4 l
)
DIABLO CANYON - UNITS 1 & 2 8 3/4 0-2a Amendment Nos. 55 and 54 w-s
.w
APPLICABILITY BASES 4.0.4 This specification establishes the requirement that all applicable surveillances must be met before entry into an OPERATIONAL MODE or other condition of operation specified in the Applicability statement. The purpose of.this specification is to ensure that system and component OPERABILITY requirements or parameter limits are met before entry into a MODE or condition for which these systems and components ensure safe operation of the facility.
This provision applies to changes in DPERATIONAL MODES or other specified-conditions associated with plant shutdown as well as startup.
i Under the provisions of this specification, the applicable Surveillance Requirements must be performed within the specified surveillance interval to ensure that the Limiting Conditions for Operation are met during initial plant startup or following a plant outage.
When a shutdown is required to comply with ACTION requirements, the provisions of Specification 4.0.4 do not apply because this would delay placing 1
the facility in a lower MODE of operation.
4.0.5 This specification establishes the requirement that inservice inspection of ASME code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumps, valves, and snubbers shall be performed in accordance with a periodically updated version of Section XI of the ASME Boiler and Pressure Vessel Code and Addenda as required by 10 CFR 50.55a.
l This specification includes a clarification of the frequencies for performing the inservice inspection and testing activities required by Section XI of the ASME Boiler and Pressure Vessel Cod ( and applicable Addenda. This clarification is provided to ensure consistency in surveillance intervals throughout the Technical Specifications and to remove any ambiguities relative to the frequencies for performing the required inservice inspection and testing activities.
Under the terms of this specification, the more rest,ictive requirements of the Technical Specifications take. precedence over the AYME Boiler and Pressure Vessel Code and applicable Addenda. The requiremes.ts of Specification 4.0.4 to perform surveillance activities before entry into an OPERATIONAL MODE or other specified condition takes precedence over the ASME Boiler and Pressure Vessel Code provision which allows pumps and valves to be tested up to one week after return to normal operation. The Technical Specification definition of OPERABLE does not allow a grace period before a component, that is not capable of performing its specified function, is declared inoperable and takes precedence over the ASME Boiler and Pressure Vessel Code provision which allows a valve to be incapable of performing its specified function for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> before being declared inoperable.
4.0.6 This specification delineates the applicability of the surveillance activities to Unit I and Unit 2 operations.
DIABLO Cidr*W - UNITS 1 & 2 8 3/4 0-3 Unit 1 - Amendment No. 66dG6,112 Unit 2 - Amendment No. 64dO6,110