Text

Corninonw calth liliwn Onnpany tiraidwom! Generating Station Route #1, Box 8i Ilraces ille. IL N) su'>Xil9 Tel H 15-4542801 May 7,19%

U.S. Nuclear Regulatory Commission Atta: Document Control Desk Washington, DC 20555-0001

Subject:

Braidwood Station Unit 1 Operating Interval Between Eddy Current Inspections for Circumferential Crack Indications in the Braidwood Unit 1 Steam Generators NRC Docket: 50-456 i

l

\

We have reviewed your letter dated May 2,1996, in which you provided the Staffs opinion 1 about our proposal to modify our commitment regarding the date for the initiation of a mid-cycle Braidwood Unit I steam generator tube inspection. Our original commitment, as subsequently clarified in our letter to you dated April 29, 1996, specified that Braidwood would initiate an inspection prior to July 13,19%, if our proposed revision was found unacceptable.

Your letter states that in light of the recent Byron Unit I cream generator eddy current inspection data obtained during the present refueling outage, the Staff finds our proposed modification to our original commitment unacceptable. Commonwealth Edison Company (Comed) understands the Staffs position and therefore, intends to conduct a midcycle J inspection at Braidwood Unit I no later than July 13, 1996. Comed continues to believe a technical basis exists which supports deferring the mid-cycle inspection until the fall. This information will be presented to you at a meeting during the week of May 13th. If after your review of this information you fmd it resolves your concerns, then Comed requests that the 4 Staff reconsider our request for a fall outage. I We look forward to meeting with you to further discuss this important topic.

Sincerely, Karl L. ' up y

Site Vice-President Braidwood Station cc: W. Russell, Director - NRR H. Miller, Regional Administrator - RIII A. Thadom, Associate Director - NRR B. Sheron, Director - Division of Engineering NRR J. Roe, Director - Division of Reactor Projects III/IV-NRR I R. Capra, Director of Directorate III NRR 200043 D. Lynch, Senior Project Manager - NRR R. Assa, Braidwood Project Manager - NRR C. Phillips, Senior Resident Inspector - Braidwood C1 I O

9605200442 960507 v PDR ADOCK 05000456