Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20148M6511997-06-18018 June 1997 Comment Opposing Proposed Suppl to Bulletin 96-001 That Would Request Licensees to Take Action to Ensure Continued Operability of Control Rods L-95-045, Comment on Proposed Rules 10CFR2,50 & 51 Re Decommissioning of Nuclear Power Reactors1995-10-19019 October 1995 Comment on Proposed Rules 10CFR2,50 & 51 Re Decommissioning of Nuclear Power Reactors ML20080M1121995-02-27027 February 1995 Comment Re Proposed Suppl 5 to GL 88-20 IPEEE for Severe Accident Vulnerabilities. Proposed GL Suppl Should Indicate That Licensees Can Use Llnl Hazard Results of NUREG-1488 Re Revised Hazard Estimates Instead of NUREG/CR-5250 ML20073M0751994-09-23023 September 1994 Comment on Proposed Rules 10CFR30,40,70 & 72 Re Clarification of Decommissioning Funding Requirements. Permitting Access to Funds Only on Semiannual Basis Seems Unnecessarily Restrictive ML20069L5291994-06-13013 June 1994 Comment Supporting Proposed Rulemaking 50-60 Re Petition for Rulemaking & Changes to 10CFR50.54 ML20029D8251994-04-29029 April 1994 Comment Supporting Elimination of Proposed 5-yr Implementation Schedule & Believes That Current Programs Adequate to Maintain Containment Integrity ML20044G1971993-05-24024 May 1993 Comment Supporting Draft Insp Procedure Re Commercial Grade Procurement & Dedication ML20044E5721993-05-19019 May 1993 Comment Supporting Proposed Generic Ltr for Relocation of TS Tables on Instrument Response Time Limits ML20044D3271993-05-0707 May 1993 Comment Opposing Proposed GL Availability & Adequacy of Design Bases Info ML20125B6141992-12-0303 December 1992 Exemption from Requirements of 10CFR50,app a Re GDC-2 & 10CFR50.49 Re Environ Qualification of Electric Equipment Important to Safety for Nuclear Power Plants ML20095J6881992-04-23023 April 1992 Comment Opposing Draft Reg Guide DG-1022, Emergency Planning & Preparedness for Nuclear Power Plants ML20077R5161991-08-14014 August 1991 Comment Supporting Petition for Rulemaking PRM-20-20 Re Reduced Total Effective Dose Equivalent to Individual Members of Public from 0.5 Rem (5 Msv) to 0.1 Rem (1 Msv) ML20235N8531989-02-14014 February 1989 Comment Supporting Chapter 1 Re Policy Statement on Exemptions Below Regulatory Concern.Policy Development for Criteria for Release of Radioactive Matl Needed for Development of Consistent Waste Mgt Practices ML20235P3311989-02-0808 February 1989 Comment Opposing Proposed Rules 10CFR50 & 55 Re Educ & Experience Requirements for Senior Reactor Operators & Supervisors at Nuclear Power Plants ML20236P5851987-11-0909 November 1987 Transcript of 871109 Briefing in Washington,Dc Re Facility Steam Generator Tube Rupture Event.Pp 1-56.Supporting Documentation Encl ML20138N5311985-11-0101 November 1985 Memorandum & Order Affirming ASLB 850903 Initial Decision Authorizing Director of NRR to Issue License Amend for North Anna to Permit Receipt & Storage of 500 Spent Fuel Assemblies from Surry Power Station.Served on 851101 ML20133K7171985-10-18018 October 1985 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20133K6801985-10-18018 October 1985 Forwards Notice of Withdrawal of Appearance in Proceeding. Requests Svc List Be Revised to Include Client Under Listed Address.W/O Encl ML20133F4241985-10-0909 October 1985 Order Stating That ASLB 850903 Initial Decision Authorizing NRR to Amend OL to Permit Receipt & Storage of Spent Fuel Should Not Be Deemed Final,Pending Further Order. Served on 851009 ML20138A9521985-10-0909 October 1985 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20134N6981985-09-0303 September 1985 Initial Decision LBP-85-34 Authorizing NRR to Issue Amends to Licenses NPF-4 & NPF-7 to Permit Receipt & Storage of 500 Spent Fuel Assemblies from Surry.Initial Decision Effective Immediately.Served on 850904 ML20134N4381985-09-0303 September 1985 Order Granting Licensee 850621 Request to Correct Transcript.Proposed Transcript Corrections & Certificate of Svc Encl.Served on 850904 ML20129K1251985-07-18018 July 1985 Brief in Support of NRC 850718 Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Authorizing Issuance of Amend to Licenses NPF-4 & NPF-7 to Permit Receipt & Storage of 500 Spent Fuel Assemblies ML20129K1281985-07-18018 July 1985 Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Authorizing NRR to Issue Amend to Licenses NPF-4 & NPF-7 to Permit Receipt & Storage of 500 Spent Fuel Assemblies ML20129F8231985-07-12012 July 1985 Reply Opposing Concerned Citizens of Louisa County post- Hearing Brief.Licensee Proposed Findings of Sabotage & Human Error Not Addressed.Challenge of NRC EIS Conclusion Unnecessary.Certificate of Svc Encl ML20209F0021985-07-0808 July 1985 Post-hearing Brief Re Issues Raised at ASLB 850521 & 22 Evidentiary Hearings.Nrc Required by NEPA to Evaluate Alternative of Constructing & Operating Dry Cask Storage Facility,But Failed to Perform Even Cursory Review ML20209F2041985-07-0808 July 1985 Proposed Findings of Fact & Conclusions of Law Re Application for Amend to Ol,Authorizing Licensee to Ship 500 Spent Nuclear Fuel Assemblies from Surry Power Station to North Anna Station.Certificate of Svc Encl ML20128H0791985-07-0808 July 1985 Order Granting Concerned Citizens of Louisa County 850627 Motion for 7-day Extension Until 850708 to File Proposed Findings of Fact & Conclusions of Law.Served on 850708 ML20128G9471985-06-27027 June 1985 Motion for Extension of 850701 Deadline to File Proposed Findings of Fact & Conclusions of Law.Addl Wk Required Due to Addl Legal Duties.Certificate of Svc Encl ML20127F0511985-06-21021 June 1985 Proposed Findings of Fact & Conclusions of Law Re Util 820713 Application to Amend Ol,Authorizing Receipt & Storage of Up to 500 Spent Nuclear Fuel Assemblies.Unsigned,Undated Order & Certificate of Svc Encl ML20127F0451985-06-21021 June 1985 Post-hearing Brief Requesting Board Find in Util Favor Re Proposed OL Amend Authorizing Receipt & Storage of Up to 500 Spent Nuclear Fuel Assemblies.No Basis from Sabotage or Human Error Considerations for Denying Proposed Amend ML20128A7731985-05-22022 May 1985 Transcript of 850522 Hearing in Charlottesville,Va.Pp 313-364.Supporting Documentation Encl ML20125C4081985-05-21021 May 1985 Applicant Exhibit A-H-11,consisting of Undated,Untitled Photograph H ML20125C3601985-05-21021 May 1985 Applicant Exhibit A-B-5,consisting of Undated,Untitled Photograph B ML20125C4221985-05-21021 May 1985 Applicant Exhibit A-J-13,consisting of Undated,Untitled Photograph J ML20125C3471985-05-21021 May 1985 Applicant Exhibit A-3,consisting of SAND82-2365, Assessment of Safety of Spent Fuel Transportation in Urban Environs, Dtd June 1983 ML20125C4301985-05-21021 May 1985 Applicant Exhibit A-K-14,consisting of Undated,Untitled Photograph K ML20125C3941985-05-21021 May 1985 Applicant Exhibit A-F-9,consisting of Undated,Untitled Photograph F ML20125C4361985-05-21021 May 1985 Applicant Exhibit A-L-15,consisting of Undated,Untitled Photograph L ML20125C3101985-05-21021 May 1985 Staff Exhibit S-1,consisting of Undated Environ Assessment & Finding of Proposed No Significant Impact Re 820713 & 0820 Applications for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,allowing Receipt & Increased Storage of Spent Fuel ML20125C3411985-05-21021 May 1985 Applicant Exhibit A-2,consisting of 830915 Procedure 1-OP-4.19, Receipt & Storage of Spent Fuel TN-8L Shipping Cask Unloading & Handling Procedures ML20125C3291985-05-21021 May 1985 Staff Exhibit S-3,consisting of Forwarding NMSS Apr 1985 Environ Assessment Re 821008 Application for Authority to Construct & Operate Dry Cask ISFSI at Surry Power Station ML20125C4001985-05-21021 May 1985 Applicant Exhibit A-G-10,consisting of Undated,Untitled Photograph G ML20125C3381985-05-21021 May 1985 Applicant Exhibit A-1,consisting of 831104 Procedure OP-4.3, Shipping of Spent Fuel TN-8L Shipping Cask Loading & Handling Procedures, for Surry Power Station ML20125C3711985-05-21021 May 1985 Applicant Exhibit A-C-6,consisting of Undated,Untitled Photograph C ML20125C3791985-05-21021 May 1985 Applicant Exhibit A-D-7,consisting of Undated,Untitled Photograph D ML20125C3821985-05-21021 May 1985 Applicant Exhibit A-E-8,consisting of Undated,Untitled Photograph E ML20125C3501985-05-21021 May 1985 Applicant Exhibit A-A-4,consisting of Undated,Untitled Photograph a ML20125C3191985-05-21021 May 1985 Staff Exhibit S-2,consisting of Undated Safety Evaluation Re Increasing Spent Fuel Storage Capacity.Proposed Mods to Spent Fuel Pool & Transshipment/Storage of Spent Fuel Acceptable ML20125C4131985-05-21021 May 1985 Applicant Exhibit A-I-12,consisting of Undated,Untitled Photograph I 1997-06-18
[Table view] Category:TRANSCRIPTS
MONTHYEARML20236P5851987-11-0909 November 1987 Transcript of 871109 Briefing in Washington,Dc Re Facility Steam Generator Tube Rupture Event.Pp 1-56.Supporting Documentation Encl ML20128A7731985-05-22022 May 1985 Transcript of 850522 Hearing in Charlottesville,Va.Pp 313-364.Supporting Documentation Encl ML20128A5571985-05-21021 May 1985 Transcript of 850521 Hearing in Charlottesville,Va Re Amend to OLs for Receipt of Spent Fuel Assemblies. Pp 174-292.Suppl Documentation Encl ML20127P6601985-05-21021 May 1985 Transcript of 850521 Limited Appearance Session in Charlottsville,Va.Pp 293-312 ML20117G1031985-05-0909 May 1985 Testimony of Jm Pickworth Re Concerned Citizens of Louisa County Consolidated Contention 1 Concerning Human Error. Testimony Maintains That VEPCO Employees Trained to Properly Implement Cask Handling Procedures.Related Correspondence ML20117G0851985-05-0909 May 1985 Testimony of Pn Mccreery Re Concerned Citizens of Louisa County Consolidated Contention 1 Re Human Error.Design Features & Handling Procedures Associated W/Cask Make Likelihood of Human Error Slight.Related Correspondence ML20117G0781985-05-0909 May 1985 Testimony of RM Jefferson Re Sabotage,Diversion & Emergency Responses to Sabotage of Shipments of Spent Fuel from Surry to North Anna.Related Correspondence ML20117G0601985-05-0909 May 1985 Testimony of ML Smith Re Requirements of 10CFR73.37 & Implications of Requirements for Possible Sabotage Attacks on Proposed Surry-to-North Anna Shipments of Spent Fuel. Related Correspondence ML20117F7441985-05-0909 May 1985 Testimony of ML Smith Re Current Status of Spent Fuel Storage Space in Surry Power Station Spent Fuel Pool & Plans to Use Dry Casks to Store Spent Fuel.Related Correspondence ML19249D8991979-07-30030 July 1979 Testimony Re Tornado Missiles,To Supplement Pages 14-15 of Util 790623 Testimony on High Density Spent Fuel Racks.Risk of Tornado Missiles Striking Spent Fuel Racks Is Not Significant.Certificate of Svc Encl ML19249D6371979-07-23023 July 1979 Submits Proposed Correction to 790618 Public Hearing. Certificate of Svc Encl 1987-11-09
[Table view] Category:DEPOSITIONS
MONTHYEARML20236P5851987-11-0909 November 1987 Transcript of 871109 Briefing in Washington,Dc Re Facility Steam Generator Tube Rupture Event.Pp 1-56.Supporting Documentation Encl ML20128A7731985-05-22022 May 1985 Transcript of 850522 Hearing in Charlottesville,Va.Pp 313-364.Supporting Documentation Encl ML20128A5571985-05-21021 May 1985 Transcript of 850521 Hearing in Charlottesville,Va Re Amend to OLs for Receipt of Spent Fuel Assemblies. Pp 174-292.Suppl Documentation Encl ML20127P6601985-05-21021 May 1985 Transcript of 850521 Limited Appearance Session in Charlottsville,Va.Pp 293-312 ML20117G1031985-05-0909 May 1985 Testimony of Jm Pickworth Re Concerned Citizens of Louisa County Consolidated Contention 1 Concerning Human Error. Testimony Maintains That VEPCO Employees Trained to Properly Implement Cask Handling Procedures.Related Correspondence ML20117G0851985-05-0909 May 1985 Testimony of Pn Mccreery Re Concerned Citizens of Louisa County Consolidated Contention 1 Re Human Error.Design Features & Handling Procedures Associated W/Cask Make Likelihood of Human Error Slight.Related Correspondence ML20117G0781985-05-0909 May 1985 Testimony of RM Jefferson Re Sabotage,Diversion & Emergency Responses to Sabotage of Shipments of Spent Fuel from Surry to North Anna.Related Correspondence ML20117G0601985-05-0909 May 1985 Testimony of ML Smith Re Requirements of 10CFR73.37 & Implications of Requirements for Possible Sabotage Attacks on Proposed Surry-to-North Anna Shipments of Spent Fuel. Related Correspondence ML20117F7441985-05-0909 May 1985 Testimony of ML Smith Re Current Status of Spent Fuel Storage Space in Surry Power Station Spent Fuel Pool & Plans to Use Dry Casks to Store Spent Fuel.Related Correspondence ML19249D8991979-07-30030 July 1979 Testimony Re Tornado Missiles,To Supplement Pages 14-15 of Util 790623 Testimony on High Density Spent Fuel Racks.Risk of Tornado Missiles Striking Spent Fuel Racks Is Not Significant.Certificate of Svc Encl ML19249D6371979-07-23023 July 1979 Submits Proposed Correction to 790618 Public Hearing. Certificate of Svc Encl 1987-11-09
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20236P5851987-11-0909 November 1987 Transcript of 871109 Briefing in Washington,Dc Re Facility Steam Generator Tube Rupture Event.Pp 1-56.Supporting Documentation Encl ML20128A7731985-05-22022 May 1985 Transcript of 850522 Hearing in Charlottesville,Va.Pp 313-364.Supporting Documentation Encl ML20128A5571985-05-21021 May 1985 Transcript of 850521 Hearing in Charlottesville,Va Re Amend to OLs for Receipt of Spent Fuel Assemblies. Pp 174-292.Suppl Documentation Encl ML20127P6601985-05-21021 May 1985 Transcript of 850521 Limited Appearance Session in Charlottsville,Va.Pp 293-312 ML20117G1031985-05-0909 May 1985 Testimony of Jm Pickworth Re Concerned Citizens of Louisa County Consolidated Contention 1 Concerning Human Error. Testimony Maintains That VEPCO Employees Trained to Properly Implement Cask Handling Procedures.Related Correspondence ML20117G0851985-05-0909 May 1985 Testimony of Pn Mccreery Re Concerned Citizens of Louisa County Consolidated Contention 1 Re Human Error.Design Features & Handling Procedures Associated W/Cask Make Likelihood of Human Error Slight.Related Correspondence ML20117G0781985-05-0909 May 1985 Testimony of RM Jefferson Re Sabotage,Diversion & Emergency Responses to Sabotage of Shipments of Spent Fuel from Surry to North Anna.Related Correspondence ML20117G0601985-05-0909 May 1985 Testimony of ML Smith Re Requirements of 10CFR73.37 & Implications of Requirements for Possible Sabotage Attacks on Proposed Surry-to-North Anna Shipments of Spent Fuel. Related Correspondence ML20117F7441985-05-0909 May 1985 Testimony of ML Smith Re Current Status of Spent Fuel Storage Space in Surry Power Station Spent Fuel Pool & Plans to Use Dry Casks to Store Spent Fuel.Related Correspondence ML19249D8991979-07-30030 July 1979 Testimony Re Tornado Missiles,To Supplement Pages 14-15 of Util 790623 Testimony on High Density Spent Fuel Racks.Risk of Tornado Missiles Striking Spent Fuel Racks Is Not Significant.Certificate of Svc Encl ML19249D6371979-07-23023 July 1979 Submits Proposed Correction to 790618 Public Hearing. Certificate of Svc Encl 1987-11-09
[Table view] |
Text
w f
r.
May 9, .1985 Q ,
-UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION oghfD us BEFORE THE ATOMIC SAFETY AND LICENSING BOARD ~65 ggy 10 A10:10 In The Matter Of ) ffErf[gSECR ragy
) BRAT C"Y #O-VIRGINIA ELECTRIC AND )
POWER COMPANY ) Docket Nos. 50-338/339-OLA-1
) .
-(North Anna Power )
Station, Units 1 and 2) )
TESTIMONY OF JOSEPH M. PICKWORTH I.
Introduction My name is Joseph M. Pickworth. I am the Refueling Senior Reactor Operator for Virginia Power's Surry Power Station in Surry, Virginia.
I am responsible for the total inventory of nuclear fuel (both new and spent fuel) and any movement of such fuel in or out of the Surry Power Station, as well as for overseeing the implementation of the handling procedures that pertain to such.
fuel movement, which I helped develop. I have worked for Virginia Power since 1975, starting out as a Quality Control s in.
ao inspector, and switching in 1979 to the Operations Department.
Et In 1982 I became involved in refueling operations, specifically I
l
'f.
e with fuel test programs and fuel shipping programs. My resume
@$ is attached to this testimony as Appendix 1.
me.o
I have been asked to address that portion of Concerned Citizens of Louisa County's (CCLC) Consolidated Contention 1
!- dealing with human error. My testimony, in summary, is that L
Virginia Power employees are trained to properly implement Surry's cask _ handling procedures, thereby minimizing the likelihood of any human error in preparing casks for shipment.
II.
Development of the Cask Handling Procedures The Surry cask handling procedures were developed after experience gained from handling two different spent fuel casks the model NLI 1/2 National Lead Industries cask and the model18L Transnuclear cask, the cask to be used for the Surry-to-North Anna Shipments.
In 1983, I participated in a cask handling exercise
' involving the National Lead cask, as well as in the actual shipment of a dozen fuel pins to the Battelle Laboratory using that cask. In addition, in August 1983 I went to the AGNS facility in Barnwell, South Carolina, along with several of my colleagues who will be participating in the upcoming Surry shipment. There we obtained both hands-on experience with the model 8L Transnuclear cask, and training from Transnuclear in the use of the cask. After this experience, we identified potential problems specific to cask handling at Surry. The Surry cask handling procedures were subsequently developed i
w.
J using (1) the National Lead and Transnuclear generic cask handling procedures, (2) the operating manual for the Transnuclear model 8L cask, and (3) the hands-on experience
. gained with the Transnuclear and National Lead casks.
III.
Th9 Training Program For Cask Handling As is evident from its training program for cask handling, Virginia Power is committed to the safe handling of spent fuel at the Surry and North Anna Power Stations. The employees that will be involved in shipping the Surry fuel have had seven hours of class room instruction in cask handling and have become certified crane operators after completing an 80-hour course in crane c eration and rigging given by the Crane /MIT Operator School. These employees obtained the experience with the Transnuclec .k previously mentioned at Barnwell, South Carolina. Addit. nally, these employees have gone through a
" dry run" (without fuel) that took place at Surry in November 1983. Finally, a refresher course will be given this summer, informing employees of any minor changes in procedures. I am confident that Virginia Power employees are properly trained to implement the cask handling procedures and that the casks will be4 prepared for shipment without significant error.
i I
i
r d'
-4 IV.
The Quality Assurance Program at Surry Virginia Power's Quality Assurance Program is involved in all integrity tests of the spent fuel cavity including (1) drying tests to insure that the fuel remains dry; (2) the torquing of the bolts on the lid and other penetrations leading to the fuel cavity; (3) the testing of the pressure inside the fuel cavity; and (4) the testing of the "0-ring" seal on the cask lid and on all other penetrations into the fuel cavity.
Thus, whenever a step affecting safety is taken that requires that its performance be verified by readings of pressure, torque, etc., these values are designated as "QC" holdpoints in the cask handling procedures and must be confirmed by a Quality Control inspector.
Additionally, after the cask is loaded onto the truck and ready to leave the site, the Quality Assurance team ensures (1) that the truck contains the proper placard identifying radioactive material in accordance with DOT and ANSI standards, (2) that the required radiation surveys are done, and (3) that inspections of the truck and the trailer are carried out.
Thece_ Quality Assurance checks provide added confidence i
that the casks will be prepared for shipment without significant error.
l l
b
Iw
'N l -s-V.
Conclusion
'The Surry cask handling procedures were developed after
.significant experience handling spent fuel casks. Virginia Power employees have been properly trained to implement these procedures, and Virginia Power's Quality Assurance Program provides an additional layer of confidence that these procedures will be properly implemented. These factors make it unlikely that any significant error will occur during the preparation of the casks for shipment from Surry to North Anna.
l l
t l
a ,
, Appendix 1
-Il =
JOSEPH M. PICKWORTH t
EDUCATION Civilian: Youngstown University (3 years completed);
Tidewater Community College, Associate Degree in Science and Accounting Military: Military Equipment ~ School POSITION Refueling Senior Operator for Surry Power Station in Surry, Virginia.
EXPERIENCE Civilian: 1979 to present Virginia Electric and Power Company (Virginia Power). As Refueling Senior Reactor Operator, I am responsible for the total inventory of nuclear fuel and any movement of nuclear fuel in or out of the Surry Power Station. I joined the Operations Department and obtained my Senior Reactor Operator licenso in 1979. In 1982 I became involved with refueling opera-tions, including fuel test programs arn fuel shipping programs.
1975 to 1979 :
Virginia Power and Electric Company Quality Control Inspector.
Military: Electrician's Mate First Class, United States Navy. Eight years active service completed.
My service experience included training of personnel; supervision of maintenance and repair of new systems and equipment; super-vision of-installation, tests and inspections of new equipment and systems; maintenance and operation of electrical power units and auxiliaries associated with conventional and nuclear power plants; history record mainte-nonce of electrical and mechanical systems and components; and developing procedures for quality control of maintenance / repair of nuclear power plants.
l t