Text

n-

~

bme O Consumers Power Company General offices: 1945 West Parnall Road, Jackson, MI 49201 + (517) 788-0550 April 16, 1985 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

RESPONSE TO INSPECTION REPORT 85-05 One item of noncompliance was identified in Inspection Report 50-255/85-05 dated March 20, 1985. The following is our response to this item:

Noncompliance 50-255/85-05-01 Technical Specification 4.2 Table 4.2.1 item 5 requires the Safety Injection Tanks to be sampled for boron concentration monthly.

Contrary to the above, the monthly sampling of the Safety Injection Tanks for boron, due on February 10, 1985, was not accomplished within the 31 day surveillance period plus the 25% grace period.

Corrective Action Taken and Results Achieved The Safety Injection Tank boron samples were completed prior to the discovery that the required surveillance interval had been exceeded. All samples indicated that a satisfactory boron concentration was present in the tanks.

The occurrence was identified during routine review of the completed surveillance test. The event was reported as required and submitted as Licensee Event Report 85-002. The occurrence was reviewed with supervisors in the department responsible for the error. The requirements associated with surveillance test performance were emphasized. The responsible department has enhanced the processing methods used to ensure tests are completed on schedule.

8505130368 850416 PDR ADOCK 05000255 APR 191985 G

PDR i

OC0485-0176A-NLO4 O

TEsj

. rs.

e-

-J G Keppler, Administrator 2

Palisades Plant IEIR 85-05-Response April 16, 1985 Corrective Action to be Taken to Avoid Further Noncompliance A computerized tracking system will be developed to assist in the administration of the surveillance program.

Date When Full-Compliance Will Ee Achieved Full-compliance has been achieved. Additional action involving the computerized tracking system will be completed by September 30, 1985.

antdjalle$auaW&

David J Van Director, Nuclear Licensing CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement

-NRC Resident Inspector - Palisades l