ML20117F493

From kanterella
Jump to navigation Jump to search
Forwards fitness-for-duty Performance Data for Period of Jan-June 1996
ML20117F493
Person / Time
Site: Davis Besse 
Issue date: 08/22/1996
From: Jeffery Wood
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9609040088
Download: ML20117F493 (4)


Text

_

1 N l

CENTEREOR W

ENERGY 6200 Dak Tree Boulevard Motl Address independenceOH PO Bon 94661 216-447 3100 Cieveiond OH 441014661 Docket Number 50-346 License Number NPF-3 Serial Number 2400 August 22, 1996 j

United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555-0001

Subject:

Semiannual Fitness-For-Duty Report January - June, 1996 Ladies and Gentlemen:

Pursuant to 10 CFR 26.71(d) " Record Keeping Requirements", Toledo Edison submits its semiannual Fitness-For-Duty (FFD) report for the period of January - June, 1996 for Davis-Besse Nuclear Power station, Unit 1. provides Toledo Edison's FFD Program Performance Data. provides a summary of management actions taken by Toledo Edison based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by Toledo Edison.

Should you have any questions or require additional information, please contact Mr. James L. Freels, Manager - Regulatory Affairs, at

{

(419) 321-8466.

Very truly yours, C" &&

N RY J. K. Wood Vice President - Nuclear Davis-Besse Nuclear Power Station KNH: tam Attachments cc:

L. L. Gundrum, NRC Project Manager A. B. Beach, Regional Administrator, NRC Region III S. Stasek, DB-1 Senior Resident Inspector Utility Radiological Safety Board I

9609040000 960822 I

)

PDR ACOCK 0500 6

R Operating Companies.

Cleveland Electne lituminating Toledo Edison

i w

Docket Number 50-346 License Number NPF-3 Serial Number 2400 Toledo Edison's Fitness-For-Duty Report January - June 1996 1

i l

i

4 1

Docket Number $0-346 License Number NPF - 3 Serial Number 2400 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 Toledo Edison June 30.1996 Company 6 Months Ending Davis-Besse (419) 321-8466 Location Phone J. L Freels. Manaaer-Reaulatorv Affairs Contact Name Cutoffs: Screen / Confirmation (ng/mi)

Appendix A to 10CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 907 127 Categories Tested Positive Tested Positive Tested Positive Pre-Access 118 0

479 4

Post Accident 1

0 3

0 Observed Behavior 1

0 16 5

Random 288 0

67 0

Follow-up 11 0

25 3

Other 112 1

1 0

Total 531 1/1 591 11/12 Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal tamines clidine to test Licensee Employees 0

0 0

0 0

1 0

Long-Term Contractors 0

0 0

0 0

0 0

Short-Term Contractors 2

2 0

0 0

8 0

Total 2

2 0

0 0

9 0

13

l 9-l Docket Number 50-346 License Number NPF-3

. Serial Number 2400 i

l TOLEDO EDISON'S MANAGEMENT ACTIONS RELATING TO I

FITNESS-FOR-DUTY Toledo Edison Contractor Personnel Personnel Referred to FAP 1

0 Management Sanctions 1

12 Toledo Edison does not perform onsite initial drug screening tests; therefore, there are no unconfirmed presumptive positive results on which to base management actions.

TOLEDO EDISON'S FITNESS-FOR-DUTY

)

REPORTS There were no Fitness-For-Duty reports submitted during this reporting j

period (January - June 1996).

l l

L l

- -,