ML20117F464
| ML20117F464 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 08/28/1996 |
| From: | Oheim H BOSTON EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| BECO-#2.96-076, BECO-#2.96-76, NUDOCS 9609040076 | |
| Download: ML20117F464 (4) | |
Text
l I
l eA G
Boston Edison Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 i
Henry V. Oheim l
General Manager - Technical section August 28, 1996 BECo Ltr. #2.96-076 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 License No. DPR-35 l
Submittal of Fitness-For-Duty Proaram Performance Data for Pilarim Nuclear Power Station l
The enclosed Fitness-For-Duty Program performance data sheets are submitted in accordance l
with 10CFR26.71(d). This submittal contains data for the period January 1,1996, through i
l June 30,1996.
Please contact me if you have any questions or comments regarding the enclosed submittal.
. V5 eim I
HVO\\ RAH \\pkk\\radmisc/ffddata Attachment cc:
Mr. Alan B. Wang, Project Manager Project Directorate 1-1 Office of Nuclear Reactor Regulation Mail Stop: 14B2 l
U. S. Nuclear Regulatory Commission i
1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road i/
0J003m King of Prussia, PA 19406
[6b //
8 J
Senior Resident inspector Pilgrim Nuclear Power Station 9609040076 96082a PDR ADOCK 05000293 R
i-
)
- A l
O 1
manean annan
(
j Executive Offices j
800 Boylston Street Boston. Massachusetts 02199 Paul A.Keefe,MD (617) 424-2372 Fitness for Duty Performance Data Summary for Management Actions Six Month Period Ending June 30,1996 There were five positive preaccess test results during this period. One administrative, one l
for alcohol and three for marijuana. Two of the marijuana positives were at the 100 i
nanogram level and one was at the 50 nanogram level. The 50 nanogram positive reflects the new corporate policy change to lower the level for a positive marijuana test.
i l
There were four "for cause" tests performed on company personnel during this period.
i All four were negative for alcohol and drugs.
)
l There were no positives as a result of random tests.
j 1
Integrity checks revealed twenty four specimens having creatinine levels ofless than 200 nanograms per liter. One was positive for marijuana at the 50 nanogram test level This l
test also had a low specific gravity. Of the remaining twenty three specimens, three had i
low specific gravity findings. Twenty three were re-tested. Five of these were still low and had to be re-tested as observed specimens.
l During the early part of this year, the Fitness For Duty application program was upgraded from a forms driven system to a windows interface system. A number of problems were identified. We continue to work with the computer applications group to resolve these issues.
Our corporate office has instituted changes to our company policy on drug and alcohol abuse. These changes have also been added to our fitness for duty policy. In the case of either an alcohol or drug positive test, they will sent to EAP for treatment, suspended for three days without pay, and given a final warning. A second positive will result in termination.
The percent:ge of positive tests this period was 1.10% is an increase compared to the last test period.
D* ad O FITDATA2. DOC W
I' we s
.e-w--
FITNESS FOR DU7Y PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR26 l
l 1
Boston Edison company 7
June 30, 1996 l
Company 6 Months Ending 3
Pilgrim Nuclear Power Station Location 1
4 Dr. Paul Keefe 5 617-424-2372 Contad Name.
Phone (include area code) l 6
Cutoffs: Screen / Confirmation (ng/ml)
O Appendix A to 10CFR26 Marijuana 50 / ng/ml Amphetamines 1000/ ng/ml
/
Cocaine 300 / ng/ml Phencyclidine -
25/ ng/ml
/
l Opiates 300/ ng/ml Alcohol (% BAC)
/
i IJcensee Employees Long-Term Short-Term Testing Results ContractorPersonnel ContractorPersonnel Average Numberwith Unescorted hecess 7
944.48 168.2 l
l Categories 8
Tested PosiGve Tested PosiGve Tested Positive Pre-Access 56 0
3 0
79 5
y l
[
Post accident 0
o o
o o
o r
C i
a u
Observed behavior s
4 0
0-0-
0 0
e Random 229 0
15 0
21 0.
Follow-up 15 0
3 0
0 0
Nr 0
0 0
0 0
0 Total 304 0
21 0
100 5
i
4 4
b S
4 BREAKDOWN OF CONFIRMED POSITIVE TE$TS FOR SPECIFIC SUBSTANC 9
Marijuana Marijuana Amphe-Phency-Refusat 50 mg 100 mg Cocaine Oplates famines clidine Alcohol to Test Licensee Employees 0
0 0
0 0
0 0
0 Contractors 1
2 0
0 0
0 Total 1
1 1
2 0
0 0
0 1
1 5
N 4
4O e-
-m-e**
. -.e a
-