ML20117E203

From kanterella
Jump to navigation Jump to search
Forwards Amend 4 to Failure Modes & Effects Analysis for Beaver Valley Power Station Unit 2. Amend Consists of Changes in Plant Design Mods Impacting Analysis
ML20117E203
Person / Time
Site: Beaver Valley
Issue date: 04/12/1985
From: Carey J
DUQUESNE LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20117E206 List:
References
2NRC-5-060, 2NRC-5-60, NUDOCS 8505100360
Download: ML20117E203 (6)


Text

_ _ _ _ _ _ _ -

hYL

'Af Duquesne Licjit us,5;,odo Nuclear Construction Division (412)923-1960 Robinson Plaza, Building 2 Suite 210 Telecopy (412) 787 2629 Pittsburgh, PA 15205 April 12, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Mr. Harold R. Denton Of fice of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Failure Modes and Ef fects Analysis - Amendment 4 Gentlemen:

Duquesne Light Company, acting on its own behalf and as agent for The Cleveland Electric Illuminating Company, Ohio Edison Company, and The Toledo Edison Company, is filing herewith three (3) signed originals plus three (3) copies of Amendment 4 to the Failure Modes and Effects Analysis (FMEA) for the Beaver Valley Power Station Unit No. 2.

This Amendment consist of our changes resulting from plant design modifications impacting the analysis.

Please insert the revised Amendment 4 material into the FMEA as per the attached Amendment Instruction Sheets.

DUQUESNE LIGKr COMPANY By

+

ll 5. Carey

/ v

~

Vice President GLB/wjs Attachments SUBSCRIBED AND SWQRN TO BEFORE ME THIS

/A6[ DAY OF (l M

, 1985.

dm& l}< u) A'W Notary Public ANITA ELAINE REITER, NOTARY PUBLIC ROBINSON TOWNSHIP, ALLEGHENY COUNTY 0gf f

MY COMMISSION EXPIRES OCTOBER 20,1986 j

i 0

8505100360 850412 PDR ADOCK 05000412 A

PDR

1 Unitsd Stcteo Nuciser Ragulct" y Conunicsien Mr. Harold R. Denten Failure Modes and Effects Analysis - Amendment 4 P5ge 2 COMMONWEALTH OF PENNSYLVANIA )

)

SS:

COUNTY OF ALLEGHENY

)

On this

/2[dayof

/[/6

, before me, a Notary Public in and for said Commonwealth and County, personally appeared E. J.

Woolever who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file i

the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, Mc Notary Public.

ANITA ELAINE REITER, NOTARY PUBUC ROBINSON TOWNSHIP, ALLEGHENY COUNTY I

MY COMMISSION EXPIRES OCTOBER 20,1986 l

l 1

Unitsd Statss Nuclear R:gulstory Commission Mr. Harold R. Danton Failure Modes and Ef fects Analysis - Amendment 4 P1ge 3 GLB/wjs NR/NRC/FMEAAMND Attachment bec:

J. J. Carey

- w/o attachment W. T. Wardzinski

- w/o attachment E. J. Woolever

- w/o attachment j

R. E. Dougher

- w/o attachment C. E. Ewing

- w/o attachment T. D. Jones

- w/o attachment J. A. Hultz

- w/o attachment l

E. F. Kurtz, Jr.

- w/o attachment l

J. H. Latshaw

- w/o attachment 1

R. E. Martin

- w/o attachment T. P. Noonan

- w/o attachment J. A. Rocco

- w/o attachment R.

J.~ Swiderski

- w/o attachment G. L. Beatty

.w/o attachment E. T. Eilmann

- w/o attachment R. W. Fedin

- w/o attachment K. M. Holcomb

- w/o attachment J. Lee, Esq.

- w/o attachment J. D. O'Neil

- w/o attachment S. L. Pernick, Jr.

- w/o attachment K. A. Troxler

- w/o attachment T. J. Zogimann

- w/o attachment

'A. A. Dasenbrock

- w/o attachment G. H. Oliver

- w/o attachment

)

D. E. Burke (CEI)

- w/o attachment j

R. G. Schuerger-(CEI) - w/o attachment t

B. M. Miller (2) (OEC) - w/o attachment J. Silberg (SPPT)

- w/o attachment D. Chamberlain (S&W)

- w/o attachment J. B. Chin (S&W)

- w/o attachment P. RaySircar (S&W)(5) - w/o attachment (3)

)

T. J. Lex (W)

- w/o attachment.-

B. Loreriz (W)

- w/o' attachment

~

'DLC/ EPM

- w/o attachment NCD File

- w/ attachment r

.1

. STONE 6 WEBSTER ENGINEERING CORPORATION

[

245 SUMMER STREET. BOSTON. M ASSACHU SETTS

\\

ADDRESS ALL CORRESPONDENCE TO P.O. BOX 2325. BOSTON. MA 02107 w U TELEX 94-0001 aosTON 940977 ogg,gu NEW YOnet CONSTRUCTION C H E RR Y MILL. N. J.

REPORTS DENVER E M AMIN ATIONS HOUSTON CON 1uLTING PORTLAND. OREGON ENGINEERING RIC MLAND. W A W ASHINGTON. D C.

Transmitted with this letter is Amendment 4 to Duquesne Light Company's Unit 2 Failure Modes and Effects Analyses Beaver Valley Power Station (BVPS-2 FMEA).

Insertion instructions for Amendment 4 pages are also included.

Please acknowledge receipt of your BVPS-2 FMEA Amendment 4 package by completing and returning the attached form in the envelope provided.

O i V 4

i l

l

1' Iv Acknowledgement of Receipt of Amendment 4 to Failure Modes and Effects Analyses Beaver Valley Power Station - Unit 2 Please sign, date, and return this sheet to:

Stone & Webster Engineering Corporation l

P.O. Box 2325 Boston, MA 02107 Attn:

Mr. J. Nawazelski, BVPS-2 Licensing 245/8

}

Receipt of Amendment 4 to the Failure Modes and Effects Analyses (FMEA) is acknowledged.

- My copy has been brought up to date, and superseded pages have been removed and destroyed.

Change my address as follows:

Please reassign this manual (as applicable) to:

1 I

Name i

I I-Name of Organization i

i Address i

~

l City State Zip Code l

l 5

. Signature Date j

Print name of person to whom FMEA is assigned l

Serial Number (located inside cover)

~.

j i

_, _ _.. _