LIMERICK GEtJERATING STATION i

UNITS 1 AND 2 j

1984 ANNUAL ENVIR0tNENTAL OPERATING REPORT (NON - RADIOLOGICAL)

OCTOBER 1984 - DECEMBER 1984 FACILITY OPERATING LICENCE NO. t1PF-27 DOCKET NOS. 50-352, 50-353 I

i I

I l

i 8505090247 841231

/

PDR ADOCK 05000352

}h R

pyg p

\\

n 3-

.K

'J'

,gQ. $ ; ',

+%

L

\\.

kw

1.0 INTRODUCTION

This report describes the implementation of the Environmental

-Protection Plan (EPP) from the date of issuance of the operating licence, October 26, 1984, through December 31, 1984.

Provided herein are strnnaries and results of the environmental protection activities required by Subsection 4.2 of the EPP.

2.0 ENVIROtNENTAL PROTECTION ACTIVITIES 2.1 Aquatic Monitoring The Environmental Protection Plan states that the NRC will rely on decisions made by the Comnonwealth of Pennsylvania, under the authority of the Clean Water Act, for any requirements for aquatic monitoring.

Industrial Waste NPDES Permit PA 0051926 dated Septerber 19, 1984 provides the mechanisms for protecting water quality and Indirectly aquatic blota.

In accordance with the requirements of Section 3 of the Permit monitoring results obtained during October, November and Decenter 1984 were starmarized for each month and reported on Discharge Monitoring Reports.

2.2 Terrestial Monitoring No terrestial monitoring is required.

2.3 Maintenance of Transmission Line Corridors Due to the time of year (late October through Decerrber ) there was no transmission line maintenance required.

2.4 Nolse Monitoring No noise surveys were conducted during this reporting period. Surveys will be conducted in accordance with the EPP requirements and results will be reported in future annual reports.

2.5 EPP Noncompi1ances There were no EPP noncanpliances for this reporting period.

1

r;

  • 7 25 Changes In Stttion' Deston or Operntion, Tests,~ or Experiments -

C There_were no changes in the Limerick Generating Station design or.

operation, tests, and experiments during this reporting period which involved an unreviewed environmental question.

2.7 Nonroutine Reports Submitted For this reporting period, no nonroutine reports in accordance with EPP Subsection 4.4.2 were submitted.

hfh/nt/04158501 e

"6

s PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 1215)841 4000 April 24, 1985 Docket No. 50-352 & 50-353 Mr. Richard C. DeYoung, Director Office of Inspection arri Enforcenent IE Nuclear Regulatory Commission mshington, DC 20555 Attn: Document Ccntrol Desk

Dear Mr. DeYoung:

We are serrling you a copy of the 1984 Annual Environmental Operating Report describirg implementation of the Environmental Protecticn Plan.

The information has been coupleted in ccupliance with the reporting requirements set forth in Appendix B (Envircnmental Protection Plan) to the Limerick Generating Station Operating License.

Yours truly, W. B. Willsey Director Environmental Affairs W W:htr Attachment oc:

Mr. Isarned W. Barry, Director Office of Resource Management US Nuclear Regulatory Commission Washington, DC 20555 Attne R. A. Hartfield 7602-4NBB

'/

.