ML20117A127
| ML20117A127 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 08/15/1996 |
| From: | Hill W NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20117A131 | List: |
| References | |
| NUDOCS 9608260017 | |
| Download: ML20117A127 (2) | |
Text
eff Northem States Power Company Monticello Nuclear Generating Plant j
2807 West Hwy 75 Monticello, Minnesota 55362 9637 August 15,1996 U S Nuclear Regulatory Commission 10 CFR Part 50 Attn: Document Control Desk Section 50.90 Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 License Amendment Request Dated August 15,1996 Revision of Statement on " Normal" Shift Lenath and Other Misc. Chances Attached is a raquest for an amendment to the Technical Specifications, Appendix A of the Operating License for the Monticello Nuclear Generating Plant. This request is submitted in accordance with the provisions of 10 CFR Part 50, Section 50.90.
Technical Specification Administrative Controls section 6.1.F.1 states that:
"The objective shall be to have operating personnel work a normal 8-hour day,40-hour week while the plant is operating."
This amendment request proposes to revise this statement so that either 8 or 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts will be considered " normal" and that 40-hours is considered a " nominal" week. Additionally, a j
number of other non-technical typographical and clarification changes are being made.
j Exhibit A contains a description of the proposed changes, the reasons for requesting the changes, Safety Evaluations, a Determination of Significant Hazards Consideration, and an
)
Environmental Assessment. Exhibit B contains the current Technical Specification pages marked up with the proposed changes. Exhibit C contains revised Monticello Technical Specification pages.
This submittal contains no new NRC commitments, nor does it modify any prior commitments.
Please contact Sam Shirey, Sr Licensing Engineer, at (612) 295-1449 if you require additional information related to this request.
k l
/)A'lkjb p0 l William J Hill Plant Manager Monticello Nuclear Generating Plant em sts nrrurmanomwrmusimm nQs6b J,
9608260017 960915 PDR ADOCK 05000263 PDR p
USNRC NORTHERN STATES POWER COMPANY August 15,1996 Page 2 l
c:
Regional Administrator-Ill, NRC
)
NRR Project Manager, NRC Resident inspector, NRC State of Minnesota Attn: Kris Sanda i
J Silberg Attachments:
Affidavit to the US Nuclear Regulatory Commission Exhibit A-Evaluation of Proposed Change Exhibit B - Technical Specification pages marked up with proposed change Exhibit C - Revised Monticello Technical Specification Pages I
l I
a 4
J 1
4