LIMERICK GENERATING STATION LNITS 1 AND 2 1984 AtNUAL ENVIR0tHENTAL OPERATING REPORT (NON - RADIOLOGICAL)
OCTOBER 1984 - DECEMBER 1984 FACILITY OPERATING LICENCE NO. NPF-27 DOCKET NOS. 50-352, 50-353 T6Z4 8505070568 841231 1
R PDR
~
l PDR ADOCK 05000352
U
<.':.7' ,,
g.q....; -
%g a
. i
1.0 INTRODUCTION
This report describes the implementation of the Environmental Protection Plan (EPP) from the date of issuance of the operating licence, October 26, 1984, through December 31, 1984.
Provided herein are stsnnaries and results of the environmental protection activities required by Subsection 4.2 of the EPP.
2.0 ENVIR0tNENTAL PROTECTION ACTIVITIES 2.1 Aquatic Monitoring The Environmental Protection Plan states that the NRC will rely on decisions made by the Ccmnonwealth of Pennsylvania, under the authority of the Clean Water Act, for any requirements for aquatic monitoring.
Industrial Waste NPDES Permit PA 0051926 dated Septerrber 19, 1984 provides the mechanisms for protecting water quality and Indirectly aquatic blota.
In accordance with the requirements of Section 3 of the Permit monitoring results obtained during October, Noventer and Decenter 1984 were stsimarized for each month and reported on Discharge Monitoring Reports.
2.2 Terrestial Monitoring No terrestial monitoring is required.
2.3 Maintenance of Transmission Line Corridors Due to the time of year (late October through Decenter ) there was no transmission line maintenance reautred.
2.4 Noise Monitoring No noise surveys were conducted during this reporting period. Surveys will be conducted in accordance with the EPP requirements and results will be reported in future annual reports.
2.5 EPP Noncompliances There were no EPP noncompilances for this reporting period.
.4 e'2.6
- Chang 7s in Stetton Design or Operation, Tests, or Experiments There were no changes in the Limerick Generating Station design or
~
operation, tests, and experiments during this reporting period which involved an unreviewed environmental question.
2.7 Nonroutine Reports Submitted For this reporting period, no nonroutine reports in accordance with EPP Subsection 4.4.2 were subrnitted.
hfh/nt/04158501 I
~,--\\---
i 1
1 PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 12151841 4000 April 24, 1985 Dodcet No. 50-352 & 50-353 Dr. Thomas E. Exrley Regional Administrator Office of Insp. & Enforcement OIE US Nuclear Regulatory Comm.
631 Park Ave.
Region I King of Prussia, PA 19406
Dear Dr. Mirley:
Pursuant to the requirements set forth in Appendix A of the Limerick Generating Staticn Operating License, Technical Specificaticms, Section 6.9.1.7., we are seniing you a copy of the 1984 Regional Radiological Environmental Mcnitoring Program No.1 by Teledyne Isotopes and Radiation Nnagemnt Corporation.
'1he ten day period that this report covers represents the portion of 1984 after which Limerick achieved initial criticality. The Radiological Environmental 2nitoring Program confirmed that the IES environmental effects from radioactive relmses are well below the IES Technical Specificaticns arvi applicable regulatory limits.
Yours truly, 4A/
[
h W. B. Willsey Director Environmental Affairs W3W:htr Attachent BAY
\\