L U-0825 L30-85 ( 05-03)-L 1A.120 ILLINDIS POWER COMPANY CLINTON POWER STATION, P.O. BOX 678. CLINToN, ILLINOIS 61727 May 3, 1985 Docket No. 50-461 Office of Nuclear Reactor Regulation Attention: Mr. Hugh L. Thompson, Jr., Director Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555
Subject:
Certification of Compliance to 10CFR50.49, Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants (Generic Letter 84-24)
Dear Mr. Thompson:
Illinois Power Company is implementing an Environmental Qualification Program which satisfies the requirements of 10CFR50.49. Prior to operation, the plant will have at least one path to safe shutdown using fully qualified equipment or will have submitted a justification for continued safe operation (JCO), pending full equipment qualification.
All other equipment within the scope of 50.49 will be fully qualified or a JC0 will be submitted pending full qualification.
Illinois Power Company has in place a program which controls IE Bulletins and Information Notices frcm the time of receipt through closeout. This program assures that each item is reviewed for applicability to Clinton Power Station, and is acted upon. A record of both the review and action is maintained. Included within this program are those IE Bulletins and Information Notices which identify EQ problems.
I hereby affirm that the information in this letter is correct to the best of my knowledge.
Sincerely yours, a1 Vice President hED/ lab cc:
B. L. Siegel, NRC Clinton Licensing Project Manager NRC Resident Office Regional Administrator, Region III, USNRC Illinois Department'of Nuclear Safety 1