ML20116N119
| ML20116N119 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 11/05/1992 |
| From: | Gates W OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20116N124 | List: |
| References | |
| LIC-92-329, NUDOCS 9211230200 | |
| Download: ML20116N119 (4) | |
Text
.
k
-. ~= m... -
....4.__..._-___..*
...u._..-.4.-..-_._
o Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 402/636-2000 November 5, 1992 Lic-92-329
- 11. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station Pl-137 Washington, DC 20555
Reference:
Docket No. 50-285 Gentlemen:
SUBJECT:
Transmittal of Changes to the Fort Calhoun Radiological Emergency Response Pl an (RERP) and Emergency (FCS)
Station Plan Implementing Procedures (EPIP)
As required by 10 CFR 50 Appendix L Part V and 10 CFR 50.4(b)(5)(ii)d 165.
, the following FCS RERP changes are provided for NRC copies 154, 155, 156,-an REMOVE SECTION INSERT SECTION RERP Index.. page 1, issued 9/17/92 RERP Index, page 1, issued 10/26/92 RERP Section H, R20, issued 12/11/91 RERP Section H, R21, issued 10/22/9%
Summary of RERP Chances:
These changes are necessary to reflect the new location of.the Operations Support Center.
- Note ** RERP Section H contains privacy information.
Also, as required by 10 CFR 50 Appendix E Part V and 10 CFR 50.4(b)(5)(iii), the following FCS EPIP changes are provided for NRC copies 154, 155, 156, and 165.
REMOVE SECTION INSERT SECTION EPIP Index, page 1, issued 9/17/92 EPIP Index, page 1, issued 10/26/92 EPIP-0SC-21, R1, issued 4/2/92 EPIP-0SC-21, R2, issued 10/26/92 Summary of EPIP Chances:
These changes are necessary to reflect the_ new location of the Operations Support Center.
- Note ** EPIP-0SC-21 contains-privacy information, f
o
?211230200 921105 i
i PDR ADOCK 05000285
/
F pop I
" ' ^
cs 5124 Employnwn E
opportunity g
/
I U
S. Nuclear Regulatory Commission LIC-92-329 Paue 2 Please return the transmittal sheets to confirm your receipt of these changes.
If you should have any questions, please contact me.
Sincerely, O
' W. G. Gates
'Vice President Nuclear WGG/grc c:
LeBoenf, Lamb, Leiby & MacRae J. L. Milhoan, NRC Regional Administrator, Region IV R. P. Mullikin, NRC Senior Resident inspector S. D. Bloom, NRC Project Manager i
i 4
j 1