ML20116M515

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1992 for Browns Ferry Nuclear Plant,Units 1,2 & 3
ML20116M515
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/31/1992
From: Pierce G, Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9211200305
Download: ML20116M515 (13)


Text

..

1 J.,.

A.

~. k

. '4(,

n

j., ;

6 Tennessee Va%y Aconty Post OMe Dos 2000 Dere t. Mama 35609 November 16, 1992-U.S. Nuclear Rei"Istory Commission ATTN:

Document Control Der,k Washington, J.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos.-50-259 Tennessee Valley Anthority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MONTilLY OPERATING REPORT FOR Tile MONTil OF OCTOBER 1992 In accordance with the requirements of the BFN Technical Specifications section 6.9.1.3, the Monthly Operating Report for the month of October.

1992 is provided in the enclosure.

If you have any questions, please telephone me at (205) 729_-7566.

.. Sincerely,

.S l IY m 6 <

G. D. Pierce Interim Manager of Site Licensing Enclosures cc:

See page 2 t

i 230002 p

/

9211200305 921031 PDR ADOCK 05000259 R.

PDR

.+

6

l2

'a U.S. Nuclear-Regulatory Commission

. November 16, 1992 Enclosures

~

cc (Enclosures)s INPO Records Center Institute of-Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500-Atlanta, Georgia 30389 Regional Administrator-t U.S. Nuclear' Regulatory Commission Region II 101 Marietta Street, NW, Seite 2900 Atlanta, Georgia 30323 Mr. Frederick J. tiebdon, Director "roject Directorate II-4 Division of Reactor Projects 1-II Off3ce of-Nuclear Reactor-Regulation, Mail 13 H3 Washington, D.C.

20555 Mr. Ted Martson, Director Electric Power Research Institute P.O. Box 10412 Palo Alto, California 94304 Mr. B. A. Wilson, Project Chief U.S. Nuclear' Regulatory Commission Region.II Regulatory Commission 101 Marietta Street, NW,? Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611

-Mr. Fred Yost, Director of Research

--Services, Utility ' Data Institute, Inc.,

1700 K Street, NW,. Suite 400 Hashington, D.C.-

20006 l

l p

~

, e

~

l l.:

1 e

mf yr e

g;_

i r;

s

'd

p

- _. 3 MONTHLY OPERATIhG_ REPORT =

d BROWNS FERRY NUCLEAR PLANT-TENNESSEE VALLEY AUTi'ORITY OCTOBER 1992 i

DOCKET NUMBERS 50-259, 50-260 AND 50-296 LICENSE NUMBERS DPR-33, DPR--52, AND DPR-68 t

a T

4

(

i i,l '

N p

y

--s

I OPERATIONAL,"#11ARY OCTOBER 1992 UNIL1 Unit remains on administrative hold to resolve various TVA and NRC concerns.

URIL2 Unit 2 entered f uel cc,astdown on October 1,1992, with a planned rt" of Cycle date on January 29, 1993. The unit was online 100 percent of t',.1

.seporting pe rior.' and generated 754,560 MWils (Gross) Electrical Power.

UNIL3 l<

Unit remains on administrative hold to resolve various IVA an(. NRC concerns.

c

'm f

P

\\

4

~

AVERACE DAILY UNIT POWER LEVEL i

DCCKET NO.

__ 10-159 Unit

__]n c FREPARED BY E,_A1__Ratlif L TELEPHONE 1205)_Z19_-19.32 -

Mormi __.

onIorER_1992 DAY AVERAGE DAILY F0WER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 Q_

17 Q_ _.

2 0_.

18

_0 3

Q_

19

__D 4

._Q 20 0.

5 0

21

. _0 6

3 22

_0 7

Q_

23 0

8

_Q 24 0

1 9

0 25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15

_ _.Q_

31 0

16 0

PLLIC207/449/8

__.__________._____.___.________m-.

s

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

__ 10-160}-

. Unit Two PREPARED BY-L l uRatliU _

TELEP110NE - 1201)_Z19-1932' MONTil OCTO)18._1992_ _

DAY AVERAGE DAILY POWER LEVEL DAY AVEPAGE DAILY POWER LEVEL.

)

(MWe-Net)

(MWe-Net) 1 9 10 17 984 2

907 18 990 3

._J44 19 93 5 4

1059 20 991 5

1051 21 973 6

1Q1Z_

22 976 7

_ _ _1QM_ __

23 573 8

_lQ29 24 91 1 9

1D30 25 1004*

10 1024 26 962

.i 11 1017 27 958 12 1019 28 93 0 13 1003 _.

29 955 14 1DH6 30

-248 15 1042 31 945 16 961 NOTE: Net-genecation values are based on manual readings from an watt hour meter. Small differences in the time of day.of integratino manual recording may cause the values to vary slightl.v.

(*25 aours due to time change from Daylight Savings Time to. Central' Standard Time.)

PLLIC207/449/9

t AVERAGE DAILY LU!!T POWER LEVEL DOCKET NO.-- d 0-29.6 UNIT -. Thr1L PREPARED BY.-

S. A.-Ratliff_ -

TELEP110NE (205) 729-2932 MONTH OCT,QDER._1932 i

DAY AVERAGE DAILY POUER LEVEL DAY AVERAGE DAILY POWER LEVEL l

(MWe-No t. )

(MWe-Net) 1 0_

17 0-2 0

18 0

3 0

19 0

4 0

20 0

a 5

Q 21 0

6 0

22 0

7 0

23 0

- 8 0

24 0

9 0

25 0

10 0

-26 0

11 0

27 0-

' 12 0

28 0.

13 0

29 0

i

.i 14

._0 30 0

15 0

31 0

~6 0

t PLLIC207/449/10

' OPERATING DATA REPORT DCCKET NC.

-259 PREPARED BY $

-tliff TELEPHONE t 2' 5 29-2937 OPERATING STATUS-Notes 1,

Unit Kame:

Browns Ferry Unit One 2.

Reporting Period:

October 1992 3.

Licensed Thermal Power (MWt): 3293 4.

Nameplate _ Rating (Gross MWe): 1152 5.

Design Electrical Rating (Net MWe):

1065 6.

_ Maximum Dependable Capacity (Gross MWe):

1098.4 7.

Maximum Dependable Capacity (Net MWe): _1065 3

8.

If Changes-Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted,;If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 745*

7320 160064

12. Number of Hours Reactor Pas Critical 0

0 59521

13. Reactor Reserve Shutdown Hours 0

0 6347

- 14. Hours; Generator On Line 0

0 58267

15. Unit Reserve Shutdown Haurs 0

0 0

16.-. Gross Thermal. Energy Generated (MWH) 0 0

168036787

17. Gross Electrical Energy Generated (MWH) 0 0

55398130

18. Net Electrical Energy Greerated-(MWH)

-2416

-22422

-53513068

19. Unit Service Factor 0

0 36.4

20. Unit Availability Factor 0

0 36.4

21. Unit Capacity Factor (Using MDC Net) 0 0

31.4

-22. Unit' Capacity Factor (Using DER Net) 0 0

31.4

23. Unit. Forced Outage Rate-100 100 58.8
24. Shutdowns' Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: To be dete-mined
  • Includes time change CDST to CST..

- PLLIC207/449/ll.

.,_ss

_na-3 m

- + -,

xLwx x

-nud'-~,,E_

a_..n

--n.,

A.

a

--ma-,-

OPERATING DATA REPORT DOCKET NO.

50-260 PREPARED BY S. A. RatlitT TELEPHONE (205 ) 729-2937 OPEP. ITING STATUS Notes 1.

Unit Name:

Browns Fer y Unit Two 2.

Reporting Period:

October 1992 3.

L! censed Thermal' Power.(Wt): 3293 4

Nameplate Rating (Gross MWe): _1152 5.

Design Electrical Ratirig (Net MWe):

1065 a

6.

M5ximust Depe'ndable Capacity (Gross MWe):

1098.4

-7.

Maximum Dependable Capacity (Net MWe): 1065 l

8.

If. Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If.Any (Net MWe):

N/A'

10. Reasons For Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative-

11. Hours.in Reporting Period 745.0*

7320.0 154951

12. Number-of Hours Reactor Was Critical 745.0 7031.9

-67538 13.-Reactor Reserve Shutdown Hours 0

0 14200

-14. Hours Generator On-Line 743.0 6940.5 65407

15. Unit Reserve Shutd,wn Hours 0

0 0

16. Gross Thermal Energy Generated.;MWH) 2245537.4 21828712.4 186904568 t
17. Gross' Electrical Lnergy Generated.(MWH).

'754560.0 7332390.0 62002198=

18. Net Electrical Energy Generated (MWH) 734861.0

. _7151467.0 59961726

19. Unit Service Factor 100.0 94.8

'42.2

20. Unit Availabilit'y Factor-92.6 91.7 36.3 100.0 94.8 42.2-
21. Unit Capacity Factor'(Using MDC Net)
22. Unit Capacity Factor:(Using DER Net) 92.6 91.7 36.3
23. Unit Forced Outage Rate 0

2.5 50.8 124. Shutdowns Scheduled Over Next.6 Months-(Type,:Date, and' Duration of Each):

Refueling. January 29; 1993.'120 days

25. If. Shut Down At End Of-Report Period, Estimated Dete of Startup:

N/A

  • Includes time change CDST to CST.

PLLIC207/449/12.

M 4

g-g p-rg, 4

,j-

a., y OPERATING DATA REPORT' DOCKET NO.

50-296 PREPARED 5.

S. A. Ratliff TELEPHONE ' 205) 729-2937 OPERATING STATUS Notes l.-

Unit Name:

Browns Ferry Unit Three 2.

Reporting Period:

October 1992 3.

Licensed Thermal Power-(W t):

3293 4.

Nameplate Rating (Gross MWe):

1152 J

5.. Design Electrical' Rating (Net MWe):

1065 6.

Maximum Dependable Capacity (Gross'MWe):

1098.4 7.

Maximum Dependable Capacity (Net MWe):

1065 8.

If Changes Occur in' Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A-9.

Power Level To Which Restricted If Any.(Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative

11. Ecurs in Reporting Period 745.0*

7320.0 13/375

12. Number of Hours Reactor Was Critical 0

0 45306

~ 13. Reactor Reserve Shutdown Hours 0

O 5150

14. Hours Gene ator On-Line 0

0 44195

15. Unit Reserve Shutdown Hours 0

0 0

- 16. Gross Thermal. Energy Generated (MWH) 0 0

131868267

17. Gross Electrical l Energy Generated.(MWH).

0 0

43473760

18. let Electrical Energy Generated (MWH)

-1766.0

-17672.0 41935137

19. Unit Service. Factor 0

- 0 32.2

20. Unit Availability Factor.

0 0

32.2

=

. 21. Unit Capacity Factor (Using MD0 Net) 0 0

28 7

22. Unit Capacity Factor.(Using DER Net) 0 0

28.7

23. Unit Forced Outage' Rate 100.0 100.0 63.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 23 If-Shut Down.At'End Of. Report Period, Estimated Date'of.Startup: To be' determined

  • Includes time, change-CDST.to_ CST...

PLLIC207/449/13-I d b I

V-T' f

'Wi*'-

4 f

W 5

l l

. iim I

'd DOCKET NO:

50-259 UNIT SHUTD0'*S AND POWER REDUCTIONS UNIT NAME:

One FREPA:iED BY:5. A. Ratlif f REFORT Mor:TH:

OCTOSER 1992 TELEFHONE:(2051 729 2932 l

l l

l l

lMethodof l Licensee l

l l

Cause and Corrective l l

l l

l Duration j iShuttingDown l Event l System l Component l Action to l

l No.

! Date l Type l(Hours) l Reason l hacter lReportido. l Code #

l Code l

Prevent Recurrence l

l 2

3 S

l 1

1 I

I I

I l

l 1

I I

I I

i l

i I

i I

l315 l06/01/85 l F

l 745" l

F l

4 l

l l

l Administrative hold to l l

l l

l l

l l

l l

l l resolve various TVA and l l

l l

j l

l l

l l

lNRCconcerns.

l 1

1 I

I I

I I

i i

I I

I I

i i

I I

I I

I I

I I

I l

i i

I I

I i

i i

l i

1 1

I I

I i

l i

i i

I i

i i

i l

I I

i i

l I

i i

l i

I I

I I

I I

I I

I i

I I

i l

i i

1 i

i i

i i

l 1

I i

i l

I I

I I

I i

I i

l i

I I

I I

I i

i I

I i

I I

I I

I I

I i

i i

I I

I I

I I

I I

I I

I I

I I

i 1

1 I

I I

I I

I I

I I

I I

I I

i 1

1 I

I

.I I

I i

l l

I I

I i

i I

I l

i I

i i

i i

i I

l 1

.1 l

1 i

t I

I I

i 1

4r hibit G-Inst. ructions 3

x I

2 Hethod.

F: Forced Reason:

1-Manual for Preparation of Data 5: Scheduled A-Equipment Failure (Explain)

B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee 3-Automatic Scram Event Report (LER) File C-Refueling 4-Continuation of Existing Outage (NUREG-061)

D-Regulatory Restriction E-Operator Training and License Examination 5-Reductici.

F-Administrative 9-Other SExhibit I-Same Source G-Operational Error (Explain)

H-Other (Explain) l

" Includes time <.hange CDST to CST.

PLLIC207/449/14

-y u

DOCXET NO:

50-260 UNIT SHUTDOWN $ AND POWER REDUCTIONS UNIT NAME:

Two COMPLETED BY:5. A. Ratliff RE MRT MONTH:

OCTOBER 1992 TELEPHONE:G951 72%Z937 l

l l

l l

l Method of l Licensee l

l l

Cause and Corrective j i

l 1

l Duration l lShuttingDown l Event 1 System l Component l Action to I

l 2

3 5

l No.

l Dale l Type l(Hours) [ Reason lkeactor lReportNo. ] Code #

l Code l

Prevent Recurrence l

l l

j f

i I

I I

l I

l l

l 1

1 I

i I

I I

I INone l

l l

l l

l l

l l

l 1

I i

I i

i l

i I

I I

I I

i I

I I

i 1

1 1

I I

I I

I I

I I

i l

1 1

1 I

I I

I I

I I

I I

I I

I I

I I

I I

i 1

I i

1 1

I I

I i

I I

I I

i l

l I

I I

I I

I I

i I

I i

i i

l 1

i i

i i

l i

I l

I I

I I

I i

I I

i l

I i

i l

l 1

1 I

I I

I I

I I

i I

i i

l l

I i

i i

l i

i i

l i

i i

i l

i i

l i

I i

i i

i i

i l

i i

l i

l l

I i

i l

i I

I I

I I

I I

I I

I I

I I

i i

i I

i i

l i

I I

I I

i i

l i

I

.I I

i i

i l

i i

I i

i i

i 1

I l

l l

1 1

I l

l I

l l

I 2

Method:

Exhibit G-Instructions 3

F: forced Reason:

1-Manual for Preparation of Data 5: Scheduled A-Equipment failure (Explain)

B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee 3-Automatic Scram Event Report (LER) Tile f

C-Refueling M ontinuation of Existing Outage (NUREG-061)

D-Regulatory Restriction E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other SExhibit I-Same Source G-Operational Error (Explain)

H-Other (Explain)

PLLIC207/449/15

1 DOCKET NO: _ 30-296 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:_ Three COMPLETE, 83Y:L_f Ratliff REPORT HONTH:

OCTCBER 1992 TELEPHONf:M iL_7MZ l

l l

l l

l Method of l Licensee l

l

[

Cause and ~orrective l l

l l

l Duration l lShuttingDown l Event i System l Cer.,nenti Action to l

l No.

l Date l Type

] (Hours) l Rsason l Reactor lReportNo. ] Code #

l'4 l

Prevent Recurrence 1

l 3

l_

l l

l 1

1 I

I 1

I l

1 1

I i

l I

I I

I i

l157 l03/03/85 l f

l 745*

l r

}

4 l

l l

lAdministrativeholdto l

l l

l l

l l

l l

l l resolve various TVA and l l

l l

l l

l l

l l

]NRC concerns.

l l

1 1

I I

I I

I I

l 1

1 I

I I

I I

I l

i l

i I

I I

I I

I I

I I

l I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I l

l 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

i i

l I

I I

I I

I i

i i

I i

i i

i l

i l

i l

I I

I I

I i

i i

l l

I I

I i

1 1

I I

I I

I I

i 1

I I

I I

I I

I I

I I

I I

I i

i i

i l

I I

i i

I I

I i

l i

l i

I i

I I

i i

i l

I i

1 l

l 1

i l

1 I

l 1

l l

3 Exhibit G-Instructions I

2 Hethod:

F: Forced Reason:

1-Nanual for Preparation of Data 5: Scheduled A-Equipment failure (Explair.,

B-Haintenance or Test 2-Manual Scram Entry sheets for Licensee 3-Automatic Scram Event Report (LER) file C-Refueling 4-Continuation of Existing Outage (NUREG-061)

D-Regulatory Restriction E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other 5 Exhibit I-Same Source G-Operational Error (Explain)

H-Other (Explain)

" Includes time change CDST to CST.

I t

PLLIC207/449/15 i