ML20116M513

From kanterella
Jump to navigation Jump to search
Forwards July 1996 MOR for Wolf Creek Generating Station & Corrected Pp 3 & 5 of June 1996 Mor.Corrections Reflect Changes to Number of H Generator on Line Based on Calculation Difference
ML20116M513
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/14/1996
From: Warren C
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20116M519 List:
References
WO-96-0120, WO-96-120, NUDOCS 9608200182
Download: ML20116M513 (1)


Text

-

4 s

W@ NUCLEAR OPERATING LF CREEK J

Clay C. Warren Chief Operating Officer i

t August 14, 1996 k

WO 96-0120 1

)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 2

Mail Station F1-137 I

Washington, D.

C.

20555

+

7

Subject:

Docket No. 50-482:

July, 1996, Monthly 1

Operating Report Gentlemen:

i to this letter is the July, 1996, Monthly Operating Report for d

l Wolf Creek Generating Station.

This submittal is being made in n;cordance with the requirements of Technical Specification 6.9.1.8.

. provides corrected pages 3 and 5 of the June, 1996, Monthly Operating Report.

These corrections reflect changes to the number of hours i

the generator was on line, based on a calculation difference.

=

very truly yours, i

Clay C. Warren j

CCW/jad Attachments cc:

L. J., Callan (NRC), w/a W.

D.

Johnson (NRC), w/a 4

J.

F. Ringwald (NRC), w/a l

J.

C.

Stone (NRC), w/a

( I l

9608200182 960814 PDR ADOCK 05000482 i

R PDR P.O Box 411/ Burhngton, KS 66839 / Phone: (316) 364-8831 An Equal Opportunity Employer M FNC/ VET i

.