ML20116J589

From kanterella
Jump to navigation Jump to search
Forwards non-proprietary Rev 1 to CEN-628-NP, Verification of Structural Integrity of ABB Ceno SG Welded Sleeve
ML20116J589
Person / Time
Site: Prairie Island  
Issue date: 08/09/1996
From: Wadley M
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20116J590 List:
References
NUDOCS 9608130290
Download: ML20116J589 (2)


Text

l Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch, Minnesota 55089 August 9,1996 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Sinarn Generator Tube Sleeves Metallurgical Examination Results This letter is a follow-up to our May 3,1996 letter on the same subject. That letter submitted a proprietary report prepared by Combustion Engineering, CEN-628-P, Revision 01-P, " Verification of the Structural Integrity of the ABB CENO Steam Generator Welded Sleeve." By letter dated July 22,1996, you requested that we submit a non-proprietary version of this report. The non-proprietary version is attached to this letter.

In this letter we have made no new Nuclear Regulatory Commission commitments.

Please contact Jack Leveille (612-388-1121, Ext. 4662) if you have cay questions related to this letter.

Michael D Wadley g

Plant Manager g

Prairie Island Nuclear Generating Plant i

c: (see next page) e r, g 01 9608130290 960809 ADOCKOSOOg2 PDR P

USNRC NORTHERN STATES POWER COMPANY August 9,1996 Page 2 c:

Regional Administrator - Region Ill, NRC (w/o attachments)

Senior Resident inspector, NRC (w/o attachments)

NRR Project Manager, NRC J E Silberg (w/o attachments)

Attachments: CEN-628-NP,' Verification of the StructuralIntegrity of the ABB CENO j

Steam Generator Welded Sleeve," March 1966 i

METALRGI. DOC