c e ga ro w c u any 40 in vtriru Cmle Pney v
'cz,1 On w Don 12?S
' % rmtg xn awe a 3201 Mpcw 205 677-7122 u
Ogia Powcr C. K. McCoy
$$N W!"'m " m "
November 5, 1992 MSV-Oll36-
- 3603 Docket No. 50-424 U. S. Nuclear Regulatory Commission 1
ATTN:
Document Control Desk Washington, D. C.
20555 Gentlemen:
V0GlLE ELECTRIC GENER? TING PLANT
[fRRECTION TO INSERVICE INSPECTION
SUMMARY
REPORT by letter MSV-00876 dated February 13, 1992, Georgia Power Company (GPC) submitted Volumes 1 and 2 of the Vogtle Electric Generating Plant, Unit 1 (VESP-1) Inservice Inspection (ISI) Fint.1 Report which discussed ISI activities conducted at VEGP-1 during the fall 1991 maintenance / refueling outage.
Those report volumes constituted the " Owner's Report for Inservice Inspection (Form NIS-1)" required by Subsubarticle IWA-6230 of the American Society of Mechanical Engineers (ASME) Boiler and. Pressure Vessel Code,Section XI, 1983 Edition with Addenda th.w gh Summer 1983.
During the course of preparing the ISI Final Report document for ISI activities conducted at Unit 2 (VEGP-2), it was noted that certain examinations which were performed during the VEGP-1 Fall 1991 maintenance / refueling outage had not bean addressed in the_ISI Final Repert for VEGP-1.
Similar examinations were performed at VEGP-2 during the Spring 1992 maintenance / refueling outage and were addressed in the VEGP-2 ISI Final Peport for that outage.
Specifically, the surface examinacion.of four 2-inch thermowell-to-i, ranch connection welds were inadvertently omitted froni the VEGP-1 ISI Final Report.
The subject welds resulted from a piping modification which was performed during the VEGP-l Fall 1991.
maintenance / refueling outage on the RTD section of the Reactcr Coolant System, The examination re*ults for each of the thermowell-to-branch connection welds were satisfactory.
Enclosed are corrected pages which are to be incorporated into Volume 1 of the report submitted by our "05000425/LER-1991-012, :on 911211,thermal Barrier Isolation Valves Declared Inoperable.Caused by Inadequate Original Vendor Specified Info.Torque Switch Limiter Plates for Valves 2HV-19051,2HV-19053 & [[SSC" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Were Removed|February 13, 1992 letter]].
Instructions for incorporating the correc ad pages are provided in the enc'.osure.
Corrections to the report are denoted by marginal lines.
ko$N24 p
i PDR ens.
-.u L
4 Georgial ower JL.
V. S. Nuclear Regulatory Commission MSV-Oll36 Page Two Five copies of the corrections to Volume 1 of the ISI 'inal Report for the VEGP-1 Fall 1991 maintenance /refuelirqi outage are prov.ded for your use.
Two copies of the corrections to the subject report. volume are being provided to the Regional Administrator for USNRC Region II.
Should there be any questions in this regard, please contact this office.
Sincerely,
! hI
[
C. K. McCoy CKM/JAE/jae Enclosate:
Correction to VEGP-1 ISI Final Report for Fall 1991 Maintenance / Refueling Outage xc: Georaia Power Company Mr. S. H. Chesnut Mr. M. Sheibani Mr. W. B. Shipman NORMS U. C. Nucluar Reculatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, licensing Project Manager, NRR Mr. B. R. Bonser, Senior Pesident Inspector, Vogtle
't t-7tAF76 '
L.