ML20116J084

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1992 for Waterford 3.W/
ML20116J084
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/31/1992
From: Burski R, Centolanzi P
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-92-0439, W3F1-92-439, NUDOCS 9211160049
Download: ML20116J084 (6)


Text

. - - - . _ . - . - _ . _ _ - _ - - _- ---

x .

&# ENTER 0I c- I"T" 0 <a L A 70N"".6 kcM47B{l'4 R. F. B uts ki n,,

% m .,

W ' i3 W3F1-92-0439 A4.05 QA November 12, 1992 U.S. Nuclear Regulatory Commission A1IN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers;the opertting statistics for the month of October, 1992. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical. Specifications for facility Operating License No. NPF-38.

Very troly yours, P1 RFB/TSB ssf Attachment cc: J.L. Milhoan, NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost-(Utility Data Institute, Inc.).

J.T. Wheelock (INPO Records Center)

NRC Resident inspectors Office 1

k _

1

.. . . . . - - . - . - - . . . _ - . ~ . _ - - . - . .. --. .

p

+ . .

#- g NT.C MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 OCTOBER 1992 The unit operated at an average power of 0.0% and contined Refuel Outage 5 during the period.

= __, i,_.. ~ #

t _

i l

. 1 I

I i '

PRESSURIZER SAFETY VAL'fE

'AILURES AND CilALLENGES  !

WATERFORD 3 l i  :

l t a During the month of October 1992, there were no pressurizer safety valve failures or cha11engen.

l .-

l -

l l

l. +
l. .r i .:

i I

e

.j l- i i

.i I

4

.i

-)

e i

i I

l i

i

^i I

i i

i i

i

l. -)

I i

i

.i

't

. = = - ~_ ) =

. y. _.

~

.,.,. . .z. . . . . - ... .-..... . .

.. . . . .- . ~ ~~ - ,~ ~ ~ ~

. .. . -. . . - - - . . - . . . ~ - - ~ ~ - . - - . . . - . - - - . ~ - . . - - - --._.

a  :. .,

r , ,

I OPERATING DATA REPORT {

DOCKET NAME4 50-332

  • UNIT NAME: WATERFORD 3 ,

DATE OF REPORT: NOVEMBER, 1992  !

COMPLETED BY P. M. CENTOLANZI' 7 1ELEPHONEt 504-729-6683 OPERATING STATUS i

1. Reporting Periods October, 1992  ;

Gross Hours in Reporting Periode 745 ,[

2. Currently Authorized Power Level (MWt): 3390 llaximum Dependable Capacity (Net MWe): 1075 .

Design Electrical Rating (Net HWe): 1104

3. Power Level to which Restricted (if any) (Net MWe): N/A
4. Reasons for Restriction (if any): N/A ,

THIS HONTH YR TO DATE CUMULATIVE  ;

, 5. Number of Hours Reactor wi

! was critical 6,004.7 51,091.1 i-

6. Reactor Reserve i Shutdown Ifours ,_

i 7. Hours Generator was On-line 5,959.1 50,339.9' ,

8. Unit R6Aerve Shutdown Houra - -
9. Gross Thermal Energy ~

Generated (HWH) 20,030,344' 165,579,819

10. Gross Electrical .

-55,511.580 _

Energy Generated (HWH) 6,640,160

11. Not Electrical. Energy ,

Generated (HWH) 6,335.804- 52,885,264'

12. Reactor Service Factor 0.0 __

82.0 82.0 .

13. Reactor Availability Factor 0.0 82.0 82.0
14. Unit Service Factor 0.0 8. 4 80.8
15. Unit-Availability Factor 0.0 81.4 80.8~
16. Unit Capacity Factor _ _

(using.MDC) 0.0 ,90.5 79.0 ,

17. Unit Capacity Factor *

(Uning DER) 0.0 78.4 ,76.9

18. Unit Forced Outage Rate N/A 2.1 4.0 l

.-- .e

_ a. . _ _. _ _ _ 22. . _ ; _ _. . _ _ _ __ . , :_ ; .

r  ;

a ,

i OPERATING DATA REPORT l DOCKET NAME: 50-382 UNIT NAFEs WATERFORD 3 i' DATE OF REPORT: NOVEMBER, 1992 COMPLETED DY: P. M. CENTOLANZI TELEPHONE: SO4-739-6683 OPERATING DATA REPORT (Con't)

19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):

I

20. If Shutdown at end of report period, estimated date of__scartup N/A
21. Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
22. liours in Reporting Period 745.0 7,320.0 62,281.0
23. Unit Forced Outage Hours 125.9 2,110.7 .,
  • Nameplate RatiM9 (Gross uw838 2200
25. If Changes occur in Capacity Ratinge (Items Number 2 and 24) Since Last Report, Give Reasons: N/A 9

i-~

t l

e IL L

AVERAGE DAILY UNIT POWER LEVEL DOCKET NAME: 50-382 UNIT NAMES WATERFORD 3 DATE OF REPORT: NOVEMBER, 1992 COMPLETED BY P. M. CENTOLANZI TELEPHONES. 604-739-6683 MONTH OCTOBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWPR LEVEL (MWe-Net) (MWe-Net) 1 (7) 17 (10) 2 (5)- 18 (10) 3 (5) 19 (10)

~ (10) 20 (6) 5 (6) 21 (6) 6 (1) 22 (6) 7 (10) 23 (5) 8 (9) 24 (6) 9 (8) 25 (9) 10 (9) 26 (6) 11 (a) 27 ~(6) 12 (5) 28- (4) 13 (5) 29 (5) -!

4 14 (6) 30 (9) 15 (6) __

31 (10) 16 :10)

INSTRUCTIONS

l. On this format, listtheaveragedailyunitpowerlevelinMWe-Netforeachdayl
j. in the reporting month. Compute to the nearest whole megawatt.

9 L. . ..

I 1

UNIT SHUTDOWNS ATO POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NUMBER: WATERFORD 3 DATE OF REPORT: NOVEMBER, 1992 i COMPLETED BY: P. M. CENTOIANZI l NLEPHONE: 504-739-6683 REPORT FOR OCTOBEP l

l l Method of Shutting l

T 1 pe Cause, Comments and F = Forced Duration Down the Reactor or Reason (1) Reducing Power (2) Corrective Actions Number Date S = Scheduled (Hours)

C 4 Unit removed from 92-05 920919 s 745.0 service to begin Refuel Outage 5.

Outage continued from previous period.

(1) REASON (2) METHOD A = dquipment Failure (explain) I = Manual B = Maintenance or Test 2 = Manual Scram C = Refueling 3 = Automatic Scram D = Regulatory Restriction 4 = Continuation from Previous Period E = Operator Training and 5 = Power Reduction License EFanination 6 = Other (ewplain)

F = Administrative G = Operational Error (explain)

H = Other (explain)

- ._ .,.