ML20116J058
| ML20116J058 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/18/1985 |
| From: | Shell R TENNESSEE VALLEY AUTHORITY |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20116J054 | List: |
| References | |
| NUDOCS 8505020450 | |
| Download: ML20116J058 (1) | |
Text
r d'"
SAMGUA:RDS INFORVK[ TON TENNESSEE VALLEY AUTHORIF?
Cp
- n t,
- G,y CHATTANOOGA. TENNESSEE of C. G'Q r
400 Chestnut Street Tower II AA 8.' g 3g April 18, 1985 Dr. J. Nelson Grace, Regional Administrator 10 CFR '73.21 AFEGUARDS INFORMATION U.
Nuclear Regulatory Commission ATTACHED Atlanta, Georgia 30301
Dear Dr. Grace:
SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 - NRC-0IE INSPECTION REPORT NOS. 50-327/85-12 AND 50-328/85 RESPONSE TO VIOLATION This is in response to R. D. Walker's March 26, 1985 letter to H. G. Parris, transmitting Report Nos. 50-327/85-12 and 50-328/85-12 which cited TVA with one Severity Level IV Violation. Enclosed is our response to the item of violation.
Our response contains physical security information that is exempt from disclosure in accordance with 10 CFR Part 73 21. We, therefore, request that the enclosed response not be placed in the Public Document Room. If you have any questions, please call R. E. Alsup at FTS 858-2725.
To the best of my knowledge, I declare that the statements contained herein are complete and true.
Very truly yours, TENNESSEE VALLEY AUTHORITY l
R. H. Shell Nuclear Engineer Enclosure oc (Enclosure):
Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission-ly1 CAT 10N FORMATION G%g WEN Washington, D.C.
20555 g
Yhpos<
U I
Records Center D
g Institute of Nuclear Power Operations SEFAE 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 SAFEGUAXJS ENFO:RMA"ON l
l 8505020450 850429
{DR ADOCK 05000327 i
PDR I
An Equas Opportunity t mployer