Forwards Response to Request for Addl Info to Support TS Amend Request to Rerack Unit 1 Spent Fuel Pool,Including Responses to Question Pertaining to Heavy Load Concern & Spent Fuel Pool Cooling Sys
ML20116H883
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 11/04/1992
From: Shields J
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 9211130354
Download: ML20116H883 (6)


Text

- - - - _ _ - _ _ -. _ _.

Commonwealth Edison c

1400 Opus Place b'

Downers Orove, littriois 00515 Novem'oer 4, 1992 Dr. Thomas E. Murley, Director Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Hashington, D.C.

20555 Attn:

Document Control Desk

Subject:

LaSalle County Station Unit 1 Proposed Spent Fuel Pool Rerack Amendment NRC30che130-313

Reference:

September 30, 1992 B.L. Siegel letter to T.J. Kovach, Request for Additional Information (RAI), LaSalle Station, Unit I spent fuel Pool Rerack

Dear Dr. Murley:

The referenced letter requested additional information to support NRC review of the proposed Technical Specification &mendment request to rerack the Unit 1 Spent fuel Pool.

The questions pertain to heavy loads concerns and the spent fuel pool cooling system.

Responses to these questions are included in the Attachment to this letter.

If you have any questions, please call this office.

Sincerely, JoAnn Shi Ids Nuclear Licensing Administrator Attachment cc:

A.B. Davis, Regional Administrator - RIII B.L. Siegel, Project Manager - NRR D.L. Hills, Senior Resident Inspector - LSCS Office of Nuclear Facility Safety - IDNS 100020 00 A

i\\

9P.11130354 921104 ZNLo21 t E'43 P_R ADOCK 05000373 P

PDR

t i

s t

ADACHMENT A.

IiEAYLLOADS_ CONCERNS l

Question Ad In considering the drop of a rack (page 2-4 of the June 5, 1992, submittal) you select the heaviest rack, cleprly a conservative assumption.. However, you limit the drop from the pool water level, apparently-not-a conservative premise.

Justify not having selected the top of the pool (or higher) as the o

level from which the rack could fall.

Response _At1 i

The apparent density of the LaSalle high density racks (weight divided by:the_

l external prismatic volume) is less than the density of water.- As a result, the dropping of a rack from the maximum possible evaluation during the-i handling operations over the pool (less than 6 feet above the top of water)-

will provide a surface impact between the rack and the water mass, resulting in dissipation of the momentum of the falling rack through splashing of water.

Following-the-abrupt deceleration,-the rack Will-sink into the pool and accelerate downwards.

The velocity of the rack as it propels towards the pool slab will essentially correspond to that of.one sta ting its descent from

.the top of the water line.

Therefore, simulating the drop of a rack from the top of the pool water surface is identical in its consequences to that from a-higher evaluation.

QuestionmAm2

_l l

Can the Unit 1 spent fuel-pool-(SFP) be completely separated from the Unit 2 pool by a valve, gate, or other means?

Responst Am2 the Unit 1;and Unit 2 spent. fuel pools are joined by a transfer canal and fuel storage vault.

Each pool is separated from the transfer canal _by gates.-

Ques 11on_A,3 On what basis can you exclude the possibility of a load drop which' includes a l

p rack and the-15 ton auxiliary.holst't l

' Answer _At3 The 15 ton auxiliary hoist and 'its ' connection to the main hoist is single-failure-proof.'

L I

ZNLD211919, av

.-.__.~;.;,_-m

. m.

Questionl d The duality feature for the remotely engageable lifting rig includes dual load paths.

However, each load path must be capable of supporting three times the load before any rig component is stressed to the yield point and five times the load before any component is stressed to the ultimate stress in order to be considered single-failure-proof.

Does your rig conform to these criteria?

Ariswer_Ad The load transfer from the rack to the hoist hook occurs through a minimum of four independent paths.

Failure of any one load path will not cause loss of load maintaining ability inasmuch as uncontrolled lowering of the rack cannot occur.

Postulating the failure of one load path still retains the required margins, namely a factor of safety of three and five, respectively, between the material yield stress and the maximum primary stress in the rig, and the material ultimate stress and the naximum primary stress.

Ques.t1on.Ai5 You appear to have mixed methods of resolving heavy load concerns in reracking the Unit 1 SFP by following guidelines (1) and (2) of Section 5.1,

" Recommended Guidelines," of NUREG-0612. " Control of Heavy Loads at Nuclear Power Plants." Clarify wh We approach you are following and provide further details, if needed, or cite those already provided to delineate that approach.

Answer _A,5 Our method of dealing with heavy load issues does indeed follow a mixed approach as provided for in Section 5.1.6 of NUREG-0612, which provides for improving the reliability of the handling system "through increased factors of safety and through redundancy or quality in certain active components." All components below the main hook, namely the intertradiate hoist, the lift rig and the connecting asserrblage (e.g. the turnbuckles) are single-failure-proof due to built-in redundancies.

The main crane, on the other hand, meets the enhanced reliability requirement through a large factor of safety (over 10) between its ultimate capacity and the maximum load being lifted (15 tons).

Quest}OfLA.6 Do you plan to use the lifting rig for some time after reracking the Unit 1 SFP7 If so, discuss your plans for maintaining compliance with ANSI N 14.5-1978.

Response _Ai6 CECO has no plans to reuse the lifting rig after the Unit I rerack is complete.

ZNtD2112'40 4

D.

' SPENUVELPOOL COOLING Question _D,1 In your submittal you cite two cases of validated codes.

These are (1) numerical integration code "Onepool," page 5-7, and (2) the code used for numerical integration of the last equation on page 5-7.

Briefly describe the process of validation.

Response _Bil ONEPOOL integrates the governing differential equation (Equation 5.1 on page 5-6 in the licensing report) numerically to compute the pool water temperature T at a function of the time coordinate 7'.

ONEPOOL was benchmarked by running it against Holtec's older computer code BULKTEM which solves the governing differential equation analytically and provides the results by computing the value of T from the algebraic equations for T obtained from the analytical solution.

BULKTEM was used in several doctets (such as Grand Gulf Unit One, Byron, Braidwood, and St. Lucie Unit One) before it was superseded by the more versatile code ONEP00L.

Nontheless, BULKTEM serves as a validation tool for ONEP00L.

The code TB0ll used to compute the time-to-boil and b;!1-off rate also uses the standard numerical integration procedure to solve for the dependent variables.

It was validated by checking overall enthalpy balance and also by hand calculation.

Quest.lon D.2 In Section 9.1.3.1.1, " Safety Design Bases" of the LaSalle Updated Final Safety Analysis Report (UFSAR) the emergency heat load is calculated to be 42 MBTV/HR while you show a value of approximately 37 MBTU/HR on Table 5.8.2 of your submittal.

Provide assurance that these values are not inconsistent or make the necessary changes in your calculations or in the UFSAR, Response _D,2 The reracking of the LaSalle Unit 2 spent fuel pool was approved as Amendment 48 to Facility Operating License NPF-18, Docket 50-374.

The technical justification for the Unit 2 change documented the ability of one train of the spent fuel pool cooling system to remove the resultant heat due to a maximum heat generation rate of 42.0 MBtu/Hr.

As a result of this amendment, the UFSAR section 9.1.3.1.1 was revised to reflect the worst case Emergency Heat Load, the Unit 2 value of 42.0 MBtu/hr.

Table 5.8.2 of the LaSalle Unit I rerack submittal reports a maximum heat generation rate of approximately 37 MBtu/Hr.

CECO has evaluated the off-load scenarios associated with the two respective maximum heat generation rates and has concluded that the maximum heat generation loads shown on Table 5.8.2 are bounded by those previously documented for Unit 2.

After NRC approval of the Unit I amendment, the UFSAR will be res. sed to reflect the Unit I rerack design.

Question _D.3 Tech Spec 3.9.4 permits movement of irradiated fuel in the Unit I reactor vessel after a minimum decay (actually subtriticality) period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, while your submittal regarding Cases I and 11 on page 5-4 states that offloading occurs after 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> decay in the reactor.

What means have you taken to assure that spent fuel will not be moved before a decay period of 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />?

ZNLD211941

i I

'd,

)

J

'm'o. el handling procedure LFS-100-4, Core Alterations Shiftly e a f', ice, will be revised to incorporate a decay period of 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />.

Dutition B d i

In discussing your calcult.tions relating to bulk pool coolant temperatures (page 5-12) you note that system calculations indicate a total system flow rate of 5050 gpm in lieu of the 6000 gpm anticipated by Table 9.1-3 of the UFSAR.

Discuss these results and show how you arrive at your estimate that 1

such flow decrease will result in a bulk coolant temperature increase of less than 12'F.

Response _Rd

.)

The estimated upper bound on the expected temperature increase was based on-previous 3xperience of Holtec engineers with such analyses.

To respond to i

this question, a rigorous calculation has been performed to obtain the pool temperature )rofile for the case of 5050 gpm spent fuel water rate.

In order-to perform tils analysis.the temperature effectiveness of the fuel pool heat exchanger for the reduced _ flow scenario had to be r,1culated. ' Calculations show that the effectiveness of cooler drops from 0.292 to 0.279-when the flow l

ra+e is reduced from 6000 vpm to 5050 gpm. ONEPOOL was utilized to determine the pool water temperature profile for Case II in Table 5.8.2 (the governing case).

The temperature' profile is shown in Figure 1, which indicates that the

' maximum pool water temperature is 128.6*F.

Thus, the actual increase is only 1.4'F (120.6*F minus 127.2*F), which is conservatively bounded by the estimate of 12*F presented in the licensing report.

Question _St5 Provide an estimate of the decay heat generated and concomitant bulk coolant temperature in the event a normal offload is used to fill the SFP after reracking.

RunonseJL5 The NRC clarified that " normal offload" means normal fuel pool cooling = system =

line-up, or one fuel pool c~ooling train in service.:

l As discussed in response to Question'B.2, the offaload-scenario -as described:

in paragraph 5.2 of Attachment B of our submittal, results in a heat rate of-37 MBtu/Hr.-'The comparable Unit.2 value is 42 MBtu/Hr.

In-Section 2.2.1 of; the Safety Evaluation _ Report issued with Amendment 48 to-Facility Operating License.NPF-18, the NRC verified that one' fuel cooling train was capable'of maintaining the bulk pool: temperature less'than 140'F at a maximum. heat generation rate of 42-MBtu/Hr. After evaluation of the off-load scenarios 3

= associated with-the two. respective maximum' heat generation rates, CECO

= believes that-the Unit 1 maximum heat generation rate'of 37 HBtu/Hr-isL conservatively bounded by the Unit 2 value of 42 MBtu/Hr.