Text

.. _

~

W$LF CREEK

~

~

NUCLEAR OPERATING CORPORATION Richard N. Johannes Chef Administrative Offcer August 1, 1996 t

t l

l CO 96-0062 U.

S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D.

C.

20555 l

l

Subject:

Docket No. 50-482:

Semi-Annual Fitness for Duty Program Performance Data Report l

Gentlemen:

The purpose of this letter is to transmit the Semi-Annual Fitness for Duty Program Performance Data Report for the Wolf Creek Generating Station in l

accordance with 10 CFR 26.71(d).

This report covers the six tranth period beginning January 1, 1996, and ending on June 30, 1996.

j l

1 l

If you should have any questions regarding this report, please contact me at l

(316) 364-8831, extension 4001, or Mr. Terry Morrill at extension 8707.

I Very truly yours, l

r

+9 f

NSlY l

/

Richard N. Joha es RNJ/jad Attach * / Ant cc:

L. J.

Callan (NRC), w/a W. D. Johnson (NRC), w/a J. F. Ringwald (NRC),'w/a J.

C. Stone (NRC), w/a j

1 I

s i

9608060204 960801

{

i PDR ADOCK 05000482 j

i R

PDR g

l 1

i P O. Box 411/ Burhngton, KS 66839 / Phone. (316) 364-8831 An Equal OppMeity Employer MT MCNET j

1 Attachqent to CO 96-0062

)

Page 1 of 3 1

WOLF Ci!EEK LUCLEAR OPERATING CORPORATION Fitness For Duty Events Report for Period of January 1,

- June 30, 1996 TEST RESULTS WCNOC employees No WCNOC employees tested positive during this report period.

I WCNOC had one directed screen for an employee. The screen was directed for a medical / reliability issue. The result was negative.

j Centractors The number of contractors testing positive during pre-access testing were as follows:

three for marijuana, three for cocaine, one for amphetamines, one for phencyclidine, and one for alcohol. All of the individuals were denied access.

There were two "for-cause" screens during the report period which resulted in removal of access. One contractor tested positive for marijuana and another contractor tested positive for alcohol.

Two contractors were questioned during their pre-access screening due to suspicious behavior and the temperature of their specimens.

One sample was out of range and the other sample tested at only 90 degrees Fahrenheit.

Both individuals were asked,to provide another specimen under observation and refused. The specimens collected were submitted for testing and access was denied to both individuals.

The specimens were tested to limit of detection and the results were negative.

FITNESS FOR DUTY PROGRAM CHANGES i

A new Ottage Processing Center was established which includes a dedicated Fitness for Duty testing trea.

The location and the privacy of the testing area are important enhancements to the program.

EVENTS REPORTED IN ACCORDANCE WITH 10CFR26.73 WCNOC did not have any reportable events under 10 CFR 26.73.

a Attachrgent to CO 96-0062

~ '

Pege 2 of 3 Fitness for Duty Program Performance Data l

Personnel Subject to 10CFR26 1

i Wolf Creek Nuclear Operating Corporation 6/30/96 i

Company 6 Month knding i

P.O.

Box 411, Burlington Kansas 66839 Locatson 3

Gary Burchart, Manager Human Resources (316) 364-8831 ext. 8591 Cont.act Name Phone tinclude area codet Cutoffs:

Screen / Confirmation (ng/ml)

X Appendix A to 10CFR26 i

j Marijuana

/

Amphetamines

/

/

1 Cocaine

/

Phencyclidine

/

/

Opiates

/

Alcohol (%BAC)

/

i l

l 1

Long Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 1045 271 338 Categories Tested Positive Tested Positive Tested Positive Pre-Access 16 0

73 1

758 8

For Post-Accident 1

0 0

0 0

0 Observed Cause Behavior 0

0 1

1 1

1 Random 251 0

65 0

66 0

Follow-Up 9

0 2

0 5

0 Other 1

0 0

0 0

0 Total 278 0

141 2

830 9

6

ttachrynt to CO 96-0062 Pege 3 of 3 Breakdown of Confirmed Positive Tests for Specific Substances Licensee Long-Term Short-Term Total Employees Contractors Contractors Marijuana 1

3 4

Cocaine 3

3 Opiates Amphetamines 1

1 5

Phencyclidine 1

1 Alcohol 1

1 2

Refusal to Test 2

2 A

13 l

>