Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 92-11,revising Existing LCO 3.9.10 Re Reduced Refueling Water Level for Control Rod Latching & Unlatching
ML20116E922
Person / Time
Site: Sequoyah  
Issue date: 11/02/1992
From: Joshua Wilson
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20116E925 List:
References
NUDOCS 9211100089
Download: ML20116E922 (3)


Text

. a.

..y ;

,i k

e

- m N

,p iA.M

--we ww Amu em om > m x

.nn, teme e 3m9

?

,l. L Wilum t

we rwum %wyd; %Ovm Ma November 2, 1992 q

TVA-SQN-TS-92-11 10 UFR 50.90-j U.S. Nuclear Regulatory Commission ATTH: -Document Contrel Desk l

Washingtoa, D.C. 20555 i

Gentlement In the Matter of

)

Docket Nos. 50-327.

Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR P1 ANT (SQN) - TECHNICAL SPECIFICATION-(TS) CHANGE 92-11,

" REDUCED REFUELING WA'IED LEVEL FOR CONTROL R0D LATCHING AND UNIATCHING" I

In accordance with 10 CFR 50.90, we are enclosing a requested amendmont:

to Licensen DPR-77 and DPR-79 to change the TSs of SQN Units 1.and 2._

4 The proposed change revises the existing Limit.ing Condition for Operation--

(LCO) 3.p.10'to provide a new applicability statemeni that supports control' cod latching and unlatching without the 23-foot or greaterf-

.,I refueling water level requirement. Additinnal clarifications to:.

LC0 3.9.10 have been incorporated into'this TS change.- The associated.

surveillance requirements have been appropriately revised to' reflect' this -

l change.

The proposed TS chs.nge is identified in Enclosure 1. _The justification ~

for the proposed TS change is provided in Enclosure 2.

A proposed determination et no significant hazards consideration performed pursuant.-

to 10.CFR 50.91 is provided in Enclosure 3.

The proposed changes will allow the duration of activities for refueling:

-j

? operations to1be reduced as well-as a reduction in the complexity of K

-these operations.- Flood up to-23-feet;for fucl movement can be delayed!

L until after control rod drive unlatching and-attachment of the-upper l

~ internals lifting rig-that eliminates an additional drain down and subsequent reflood.

The s,ame benefit will be-realized when reinstalling; L

the upper internals and latching control rod drives.

For'this reason-_

l TVA requests NRC' approval'of this'TS change before the_ upcoming Unitil l'

O Cycle _6 ref ueling outage presently _ scheduled: for-April-2,: 1993. The E

proposed change isiconsistent-with the recently approved: Methodically.

- A Engitieered Restructur'ed and Improved Technical Specifications

4 1

z 1;D :- (NUREG-1431).

V q

~

19211100089'921102

[

LPDR_ ADOCK-05000327-

" P_ <

_ PDR \\

~

~..,.,,er

,,,.,..,,,,. +,.

,,,,e,,,-s.,,

4 4..

,.y,

._,2

.y,-n

[

i U.S. Nucicar Regulatory Conunission Page 2 November 2, 1992 WA requests a 30-day implementation per4od for this TP change following issuance.

Please direct questions concerning this issue to K. C. Weller at (515) o43-7527.

Sincerely, 1

J. L. Wilson Sworn to and subscribed befpre me this..

day of

' f.grazzeJ 992 AA S/

L Notary Public My Connaission Expires k_

Enclosures cc (Enclosures):

Mr. D. E.14 Barge, Project Manager U.S. Nuclear Regulatory Conunission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. Michael !!. Mobley, Directos (w/o Enclosures)

Division of Radiological llealth T.E.R.R.A. Building 150 9th Avenue, N Nashville, Tennessee 37203 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igo_u Ferry Road 1

Soddy Daisy, Tennessee 37379 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Conanission Region II 1.01'Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 j

ti usa i

1 m

- d

g P

i 4

t ENCLOSURE 1 PROPOSED TEC11NICAL SPECIFICATION (TS) CitANGE SEQUOYAll NUCLEAR PLANT UNITS 1 AND 2 DOCKET NOS. 50-327 AND 50-328 (TVA-SQN-TS-92-11) 1 LIST OF AFFECTED PAGES UniL.1 3/4 9-10 UniL2 t