. a.
..y ;
,i k
e
- m N
,p iA.M
--we ww Amu em om > m x
.nn, teme e 3m9
?
,l. L Wilum t
we rwum %wyd; %Ovm Ma November 2, 1992 q
TVA-SQN-TS-92-11 10 UFR 50.90-j U.S. Nuclear Regulatory Commission ATTH: -Document Contrel Desk l
Washingtoa, D.C. 20555 i
Gentlement In the Matter of
)
Docket Nos. 50-327.
Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR P1 ANT (SQN) - TECHNICAL SPECIFICATION-(TS) CHANGE 92-11,
" REDUCED REFUELING WA'IED LEVEL FOR CONTROL R0D LATCHING AND UNIATCHING" I
In accordance with 10 CFR 50.90, we are enclosing a requested amendmont:
to Licensen DPR-77 and DPR-79 to change the TSs of SQN Units 1.and 2._
4 The proposed change revises the existing Limit.ing Condition for Operation--
(LCO) 3.p.10'to provide a new applicability statemeni that supports control' cod latching and unlatching without the 23-foot or greaterf-
.,I refueling water level requirement. Additinnal clarifications to:.
LC0 3.9.10 have been incorporated into'this TS change.- The associated.
surveillance requirements have been appropriately revised to' reflect' this -
l change.
The proposed TS chs.nge is identified in Enclosure 1. _The justification ~
for the proposed TS change is provided in Enclosure 2.
A proposed determination et no significant hazards consideration performed pursuant.-
to 10.CFR 50.91 is provided in Enclosure 3.
The proposed changes will allow the duration of activities for refueling:
-j
? operations to1be reduced as well-as a reduction in the complexity of K
-these operations.- Flood up to-23-feet;for fucl movement can be delayed!
L until after control rod drive unlatching and-attachment of the-upper l
~ internals lifting rig-that eliminates an additional drain down and subsequent reflood.
The s,ame benefit will be-realized when reinstalling; L
the upper internals and latching control rod drives.
For'this reason-_
l TVA requests NRC' approval'of this'TS change before the_ upcoming Unitil l'
O Cycle _6 ref ueling outage presently _ scheduled: for-April-2,: 1993. The E
proposed change isiconsistent-with the recently approved: Methodically.
- A Engitieered Restructur'ed and Improved Technical Specifications
4 1
z 1;D :- (NUREG-1431).
V q
~
19211100089'921102
[
LPDR_ ADOCK-05000327-
" P_ <
_ PDR \\
~
~..,.,,er
,,,.,..,,,,. +,.
,,,,e,,,-s.,,
4 4..
,.y,
._,2
.y,-n
[
i U.S. Nucicar Regulatory Conunission Page 2 November 2, 1992 WA requests a 30-day implementation per4od for this TP change following issuance.
Please direct questions concerning this issue to K. C. Weller at (515) o43-7527.
Sincerely, 1
J. L. Wilson Sworn to and subscribed befpre me this..
day of
' f.grazzeJ 992 AA S/
L Notary Public My Connaission Expires k_
Enclosures cc (Enclosures):
Mr. D. E.14 Barge, Project Manager U.S. Nuclear Regulatory Conunission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. Michael !!. Mobley, Directos (w/o Enclosures)
Division of Radiological llealth T.E.R.R.A. Building 150 9th Avenue, N Nashville, Tennessee 37203 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igo_u Ferry Road 1
Soddy Daisy, Tennessee 37379 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Conanission Region II 1.01'Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 j
ti usa i
1 m
- d
g P
i 4
t ENCLOSURE 1 PROPOSED TEC11NICAL SPECIFICATION (TS) CitANGE SEQUOYAll NUCLEAR PLANT UNITS 1 AND 2 DOCKET NOS. 50-327 AND 50-328 (TVA-SQN-TS-92-11) 1 LIST OF AFFECTED PAGES UniL.1 3/4 9-10 UniL2 t
3/4 9-12 l