ML20116E590

From kanterella
Jump to navigation Jump to search
Informs That Design Review/Quality Revalidation Rept Supports Conclusion That Tdi Diesel Generators at Facilities Acceptable for Intended Safety Function for Life of Plant. Rept Recommendations Will Be Satisfied
ML20116E590
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/26/1985
From: Foster D
GEORGIA POWER CO.
To: Adensam E
Office of Nuclear Reactor Regulation
References
GN-585, NUDOCS 8504300337
Download: ML20116E590 (2)


Text

-

y , 1 1 . Georg'a' Power Company -

, Route 2, Box 299A

^ Waynesboro Georgia 30830 -

Teicphone 404 554-9961. Ext 3360 -

404 7244114. Ext 3360 . i D. O. Foste, Georgia Power ene anage I' "I"" "''"' #YSI"*

Vogtle Project April . 26,1985 Director of Nuclear Reactor Regulation File: X4AK01 Attention: Ms. Elinor G. Adensam, Chief. X4BA17 Licensing Branch iP4 Log: GN-585 Division of Licensing U.'S. Nuclear Regulatory Commission Washington, D.C. 20565 NRC DOCKET NUMBERS 50-424 AND 50-425

, CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 DESIGN REVIEW / QUALITY REVALIDATION REPORT TDI DIESEL GENERATORS

Dear Mr. Denton:

Pursuant to our letter GN-508, dated January 18,11985, we are currently reviewing the' DR/QR . report and evaluating the Owners Group (0G) recom-mendations. The scope - of review includes evaluation of control panel modifications, piping modifications, and the Maintenance / Surveillance Program. In addition to- the review, a walkdown. will be performed to determine which modifications are applicable to the Vogtle diesel genera-tors.

The DR/QR-report supports the conclusion that the TDI diesel generators at Vogtle. are acceptable for their intended safety ' related function.

Furthermore, the Maintenance / Surveillance Program provides additional assurance . that the diesel generators will continue to perform their intended function for the life of the plant. As operating experience becomes available, the Maintenance / Surveillance Program may be modified

., - to -reflect more appropriate ' maintenance and refurbishment or replacement schedules..

~

The ~ recommendations of the _ DR/QR report were made to improve the overall reliabiity of the diesel generators and maintain their for. the - life of the : plant. Georgia Power- Company (GPC) qualification is committed to satisfying the recommendations of the DR/QR report.

Yo r trul ,

, r k hw N  %

Director of Nuclear Reactor Regulation File: X4AK01 Apri.1 26,1985 X4BA17 Page 2- Log: GN-585 xc: R.~A. Thomas J. A. Bailey B. Churchill J. E.-Joiner, Esquire T. Johnson .

D. C. Teper L. Fowler M. A.-Miller B. Jones, Esquire L. T. Gucwa G. Bockhold, Jr.

C. H. Berlinger

0. Batum.

Project File

., . - _ , _ _ . . _ _ _ - . _ . . _ . _ _ - _ . . _ . . , _ _ _ _ . . _ _ . _ . . _ , , . _ . _ _ . , _ _ _ _ _ _ . - . _ , . _ , _ . . . - . . . _ . . - - , _ . _ . , . _ _ , , . . _ .