ML20116E529
| ML20116E529 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 11/02/1992 |
| From: | Parker T NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9211090226 | |
| Download: ML20116E529 (1) | |
Text
.
Northem States Power Company 414 Nicollet Mall Minneapol s, Minnesota 55401 1927 SAFEGUARDS INFORMATION Novettber 2,1992 10 CFR Part 50 Section 50.54(p)
U S Nuc1 car Regulatory Commission 10 CFR Part 73 Attn: Document Control Desk Section 73.55(d)(8)
Washington, DC 20555 MONTICELLO NUCLEAR CENERATING PLANT Docket No. 50-263 License No. DPR-22 Subtrission of Revision 7 to Monticello Safeguards Contingenev Plan Pursuant to 10 CFR Part 50, Section 50.54(p), we are submitting four copies of Revision 6 to the Monticello Safeguards Contingency Plan.
The title of the Security Shift Supervisor he.s been changed to Shift Security Specialist with the addition of the shift errergency communicator function to this position.
These changes do not decrease the effectiveness of the Monticello Safeguards contingency Plan.
This revision to the Monticello Safeguards Contingency Plan contains Safeguards Inforrtation as identified by the Commission in 10 CFR Part 73, Section 73.21.
The Safeguards Contingency Plan revision should not be stade available for inspection and should not be placed in the public document room.
Please contact us if you have any questions related to the revision.
/
(W a w ber Thomas.
Par Manager Nuclear Support Services When Separated from Enclosures,
%ndle This Document as Decon':olled I
c: Regional Administrator-III, NRC (w/ 2 copies)
NRR Project Manager, NRC (transmittal letter only)
NRC Resident Inspector (transmittal letter only)
J Silberg (transmittal letter only)
Attachment:
Monticello Safeguards Contingency Plan 9211090226 921102 PDR ADOCK 05000263
^
j3' SAr5uvanvo EvnwfATION A(J c
100001
_____