Amend 126 to License NPF-29,revising & Deleting Surveillance Requirement,Notes & Action Statements Involved W/Requirements for Drywell Leak Rate Testing & Air Lock Leakage & Interlock Testing in Subsection 3.6.5.1
ML20116E092
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/01/1996
From: Donohew J
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20116E096 List:
References
NUDOCS 9608050083
Download: ML20116E092 (8)


Text

a na O

UNITED STATES g

g NUCLEAR REGULATORY COMMISSION l'

WASHINGTON, D.C. 20066 4 001 l

[

o 0

9....

4 i

i ENTERGY OPERATIONS. INC.

$151EM ENERGY RESOURCES. INC.

SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION ENTERGY MISSISSIPPI. INC.

DOCKET NO. 50-416 GRAND GULF NUCLEAR STATION. UNIT I AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.126 License No. NPF-29 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Entergy Operations, Inc. (the licensee) dated November 20, 1995, as supplemented by the letter dated December 15, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

9608050003 960801 PDR ADOCK 05000416 P

PDR

J '

1 i

2.

Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-29 is hereby amended to read as follows:

(2) Technical Snecifications i

l The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.

, are hereby incorporated into this license.

Entergy Operations, Inc. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION (h

/

Jack N. Donohew, Senibr Project Manager Project Directorate IV-1 i

Division of Reactor Projects III/IV l

Office of Nuclear Reactor Regulation i

l l

Attachment:

Changes to the Technical Specifications i

Date of Issuance: August 1, 1996 i

1 m-

1 3

ATTACHMENT TO LICENSE AMENDMENT NO.126 l

FACILITY OPERATING LICENSE NO. NPF-29 DOCKET NO. 50-416 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by amendment number and l

contain vertical lines indicating the area of change.

]

i i

REMOVE PAGES.

INSERT PAGES 3.6-53 3.6-53 3.6-54 3.6-54 3.6-56 3.6-56 3.6-57 3.6-57 3.6-58 3.6-58 l

i

Drywell 3.6.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.5.1.1 Verify bypass leakage is less than or 24 months equal to the bypass leakage limit.

following 2 consecutive However, during the first unit startup tests with following drywell bypass leak rate bypass leakage testing performed in accordance with this limit until 2 SR, the acceptance criterion is leakage consecutive s 10% of the bypass leakage limit.

tests are less than or equal to the bypass leakage limit A!!D 48 months following a test with bypass leakage greater than the bypass leakage limit bN1


NOTE-----

SR 3.0.2 is not applicable for extensions > 12 months.

120 months SR 3.6.5.1.2 Visually inspect the exposed accessible interior and exterior surfaces of the Once prior to drywell.

performance of each Type A test required by SR 3.6.1.1.1 SR 3.6.5.1.3 Verify drywell air lock leakage by 24 months performing an air lock barrel leakage tests at 2 3 psid.

GRAND GULF 3.6-53 Amendment No. 140. 126

Drywell Air Leck 3.6.5.2 3.6 CONTAINMENT SYSTEMS 3.6.5.2 Drywell Air Lock LCO 3.6.5.2 The drywell air lock shall be OPERABLE.

APPLICABILITI:

MODES 1, 2, and 3.

ACTIONS


NOTE-------------------------------------

Entry and exit is permissible to perform repairs of the affected air lock components.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One drywell air lock


NOTES------------

door inoperable.

1.

Required Actions A.1, A.2, and A.3 are not applicable if both doors in the air lock are inoperable and Condition C is entered.

2.

Entry and exit is permissible for 7 days under administrative controls.

A.1 Verify the OPERABLE 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> door is closed.

8HQ (continued) j 1

l I

GRAND GULF 3.6-54 Amendment No. 120, 126 t

i

Drywell Air Lock 3.6.5.2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMP (.ETION TIME C.

Drywell air lock C.1 Verify a door is I hour inoperable for reasons closed.

other than Condition A or B.

8lEl l

C.2 Restore air lock to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE status.

D.

Required Action and D.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

AND D.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> l

l GRAND GULF 3.6-56 Amendment No. MG,126

Drywell Air Lock 3.6.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.5.2.1


NOTE-------------------

Only required to be performed upon entry into drywell.

l Verify only one door in the drywell air 24 months lock can be opened at a time.

l GRAND GULF 3.6-57 Amendment No. He, 126

Drywell Isolation Valves 3.6.5.3 3.6 CONTAINMENT SYSTEMS 3.6.5.3 Drywell Isolation Valves 4

LCO 3.6.5.3 Each drywell isolation valve, except for Drywell Vacuum Relief System valves, shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS


NOTES------------------------------------

1.

Penetration flow paths may be unisolated intermittently under administrative controls.

2.

Separate Condition entry is allowed for each penetration flow path.

3.

Enter applicable Conditions and Required Actions for systems made inoperable by drywell isolation valves.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more A.1 Isolate the affected 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> penetration flow paths penetration flow path i

with one drywell by use of at least isolation valve one closed and de-inoperable.

activated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.

AND (continued)

GRAND GULF 3.6-58 Amendment No.120, 126