Text
M6 Commonwealth Edison c
One First National Plaza. Chicago, lilinois Address Reply to: Post Office Box 767 Chicago, lilinois 60690 April 4, 1985 Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Braidwood Station Units 1 and 2 Supplemental Response to Inspection Reports Nos.
50-456/84-21 and 50-457/84-20 NRC Docket Nos. 50-456 and 50-457 l
References (a):
R. F. Warnick letter to Cordell Reed dated November 20, 1984 (b):
D. L. Farrar letter to J. G. Keppler dated January 31, 1985 (c):
D. L. Farrar letter to J. G. Keppler dated February 27, 1985
Dear Mr. Keppler:
References (b) and (c) provided, in part, a response to Item 3 of the Notice of Violation transmitted with reference (a). The enclosure to this letter amends that response te. provide' additional information relative to our position on the issue involved.
Very truly yours, H _~ m Dennis L. Farrar Director of Nuclear Licensing
/klj Encl.
cc: NRC Resident Inspector-Braidwood 9941N 8504290220 850404 PDR ADOCK 0500 6
G APR g 1995 Fc, a l *h
e e
c.
ENCLOSURE CO M NWEALTH EDISON CO WANY SUPPLEENTAL RESPONSE 50-456/84-21 AND 50-457/84-20 ITEM 456/84-21-07 AND 457/84-20-07 In reviewing the status of the completion of the Flushing Program at Braidwood, it was decided that better progress could be made in completing flushing activities and closing out open items. A flushing group, which will' supervise flushing, is being formed. This group will assume the System Test Engineer responsibility for following the completion of open items in the flushing program.
The materials discovered during the recent preparation for the Full Flow ECCS Test indicates the need to review the flushing program and to take corrective action where appropriate. The flushing group will also assume this responsibility.
t.