Forwards Issue 1,Rev 10 to Inservice Testing Program for Pump & Valves
ML20116B235
Person / Time
Site: Beaver Valley
Issue date: 10/22/1992
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20116B238 List:
References
NUDOCS 9211020114
Download: ML20116B235 (5)


Text

- - _ _ _ _ _ - . . - - - - - -. ------ --- _-------_- _ _ _ __ _ .

DtrMJARrg eeger vajiev pc. , station smopmgoort. PA 15077-()004 (41?) 3D 5255 October 22, 1992 soHN D. S!EBER vee ere.* dent - Nucle Gmup U. S. Nuc2 ear Regulatory Commicsion Attn: Document Control Desk Washington, DC 20555

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Updated Inservico Testing Program, Issue 1 Revision 10 The purpose of this submittal is to provide the Nuclear Regulatory Commission (NRC) with an informational copy of revisions Lo the Beaver Valley Power Station Unit 2 (BVPS-2) Inservice Testing (IST) Program.

Enclosure 1 provides a summary of IST program changes which have been incorporated into Revision 10.

Enclosure 2 is Issue 1, Revision 10 of the BVPS-2 IST Program.

It has been determined that the IST Program changes do not require NRC approval prior to implementation. This determination was made because all of the changes ar- either:

editorial in nature in compliance with the 1983 Edition through Summer 1983 Addenda of the ASME XI Code in compliance with the pnsitions delineated in Attachmeat 1 of Generic Letter No. 89-04, " Guidance on Developing Acceptable Inservice Testi.ig Programs" If you have any questions regarding this submittal, please contact Ms. Julie Carl at (412) 393-5235.

Sincerely, f( ]*

' AALl4---

D. Sieber ri Enclosur< pp ( 3

)Ut I cc: Mr. L. W. Rossbach, Sr. Resident Inspector l  ;

Mr. T. T. Martin, NRC Region I Administrator Mr. A. W. De Agazio, Project Manager Mr. M. L. Bowling (VEPCO) ,,g s

9211020114 921022 PDR- ADOCK 05000412 PDR p ,

' DICIDSURE 1

SUMMARY

OF OIANGIS 'IO THE UNIT 2 IST PROGRAM.jBEV.10)

1. Added the Diesel Generator Main Imbe Oil Strainer Isolation Valves (2D10*106, 107, 108 and 109) (page 113) to the Unit 2 IST Program in IJaponso to NRC Violatior. 91-14-03. 'Ihe valves have already been stroked closed in OST 2.47.3A(3B) as required by ASME Section XI since 9/24/91.
2. Changed the " Valve Category" of the following valves and check valves to

" Category A or A/C" as applicable. Also noted that each valve is leak tested bi' 2BVI' -1.47.11 during each refueling outage as carmitted in our response to Inform tion Notice 91-56, " Potential Radioacti"e Leakage into a Tank Vented to Atmosphere".

[20lS*LCV115B and DJ (pages 51 and 52), CharTJ ing Pump Suction from 15fST

[2 SIS *6 and 7) (page 62), UlSI Pump Discharge Check Valves

[2 SIS *27] (page 62), Check Valve to HHSI Pumps from 151ST (2 SIS *MOV6809A and B) (page 68), U{SI Pump Suction Isolation s

[2 SIS *FDV8890A and B) (page 69), UiSI Pump Mini Flow Recirc Isolation

3. Added str W ng and timing of the following valves in both the open and closed directions per ISEG rammmondations. 'Ihe valves Were already included in the Unit 2 IST Program, but were only being stroked and timed in the open direction. This change was_ done as a result of Unit 1 c LER 1-92-001 on which direction to stroke containment isolation valves.

[2 SIS *MOV836, 840) (page 66), High Head to Cold Ing Injection Isolation (2 SIS *FDV867C and D] (page 67,,-HHSI Pump Isol to Cold Ing Injection (2 SIS *FDV869A and B] (page 67), High Head SI Hot Log Injection Isolation

[2 SIS *FDV8889] (page 69), U!SI Pump Combined Discharge to Hot Icg Isol (2 IRS *SOV950, 951, 952 & 953) (page 73), QMI' Pressure Transmitter Isol

[2QSS*MCV101A and DJ (page 74), Quench Spray Pump Diocharge Isolation

[.'IRSS*FDV155A, B, C and D] (page 77), Recirc Spray _ Pump Suction Isol (2RSS*FDV156A, B, C and D) (page 77), Recirc Spray Pump Discharge Isol

[2 MSS *SOV 105A, B and C] (page 90), TDAFWP Steamline Isolation Valves (2SVS*PCV101A, B and C) (page 93), S/G Atmospheric Steam Dump._ Valves (2SVS*HCV104) (page 93), Residual Heat Release Valve

[2 EWE *HCV100A thru F) (page 96), S/G AFW Throttle Valves PAGE 1 OF 3 1

... J

1

__ ENCIDSURE 1

SUMMARY

OF QWJGES TO THE UNIT 2 IST PROGRAM (REV. 10) (continued)

Also updated _the " Alternate:_ Test" description __ of Cold Shutdom -

-Justification No 's 25 (page 134), 26 (page 135), 27 (page 135), 37 (page 141) and 38 (page 141)-to reference stroking and timing of the applicable valves in both the open and closed directions. -

1

4. Added stroking and timing of the following valves in both the open and closed directions per ISB3 reconmendations. The valves _ w ere already included in- the Unit 2 IST Program, but were only being-stroked and ti2ned in the closed direction. This charge was done as a result of Unit 1 LER -

1-92-001 on which direction to stroke containnent isolation valves.

[2CVS*SOV302) (page 71), Post Accident Samplirg Valve (2SSR*SOV128A1 and A2) (pages .80 and 81), Primry Coolant Hot leg Sample (2SSR*SOV129Al and A2) (page 81), RHR/QMF Sump Sarple (2SSR*SOV130A1 and A2] (page 81), PRZR Relief Tank Gas /PDPP Sample (2 PAS *SOV105A1 and A2] (page 82), QMF Atmosphere Sample Ilne (2HCS*SOV114A and B) (page 11C), QMr Isol to H2 Rammbiners (2HCS*SOV115A and B) (page 116), Backup O MT Isol to H2 Recombiners (2HCS*MOV116 and 117] (pages 116 ard 117), Recombiner Return to QMF Isol (2HCS*SOV133A and L) (page 117), H2 Analyzer Outlet Inside OMT Isol (2HCS*SOV134A and B) (page 117), H2 Analyzer Outlet Outside OMT Isol ]

(2HCS*SOV135A and B) (page 117), H2 Analyzer Inlet Inside QMF Isol

[2HCS*SOV136A and B)- (page 118), H2 Analyzer Inlet Outside OMT Isol ,

Also updated the " Alternate Test" description of- Cold _ Shutdown Justification No. 52 (page 150) _for (2CVS*SOV102] to reference stroking and timirg of this valve in both the open and closed directions.

5. Added stroking and timing of the Reactor Vessel Head Vent. Valves (2RCS*SOV200A and B), [2RCS*SOV201A~ and B) and (2RCS*HCV250A- and B)

(page 49) in both the open and closed directions per ISD3 recommendations.

The valves were already included in the-Unit 2 IST Program, but were only being stroked and timed in the open direction. Also updated-the'" Alternate-Test" description of Relief Request No. -29 (page 186) to reference stroking and timing of these valves ir. both the open and closed. directions.

PAGE 2 OF 3

DJCIDSURE '1 -

MM4ARY OF OIANGES 'IO 'IHE UNIT 2 IST PROGRAM (REV,10) (continued)

6. Added CMT Pressure Transmitter Isolation Valves [2U4S*SOV950, 951, 952 and 953] to Relief Request No. 30 (page 187) as " Rapid Acting Valves" (stroke in less than 2.0 seconds) since they are no longer "Pansive" valves. Per ,

IStB rmMations as a result _of. Unit 1.LER 1-92-001,' these valves should be stroked and timod in both the open and closed directions and.are now Category "B" valves stroked aM timed per 20ST-47.3A(3B), (page 73).

7. Noted in the "Pasis for Relief" for Felief Request No. 30 (page 187) that

" relief from trending these valves is permitted by Generic Letter No.

89-04, Attachment 1, Item 6" for Rapid Acting Valves. In addition, for each of the Rapid Acting Valves listed in Relief Request No. 30, reference to "RR30" was added in the "CSJ or Relief Requests" column on the " Valve Testing Outline" sheets for each valve (pages 49, 53, 70-75, 79-82, 90, 116, 117 and 118).

8. Corrected a typographical error in the " Test Quantity" column of Table IWP-3100-2 on page 2.
9. Clarified in the " Comments" section for vibration (V) of the Residual Heat-Removal Pumps [2RHS*P21A and B) (pages 11 and 12) that the motor is equipped with " fixed" vibration sensors.
10. Noted additional testing of the Auxiliary Feecuater Header Check Valves

{2FWE*42A,B, 43A,B and 44A,B] (page 95) in- the reverse direction by monitoring pipe temperature to verify check valve closure per 20ST-24.1 on a monthly basis. Also noted. the additional testing in CSI No. 40 (page 143) under " Alternate Test."

11. Corrected a typographical error in the mark number for [2D30*115]

(page 113).

12. Added to the " Alternate Test" description in Cold Shutdown Justification No. 3 (page 122) for the Service Water Pump Discharge and Header Check Valves: if cold shutdown coincides with - refueling, then "some of the valves may also be" full otroke exercised at refueling per 20SI-30.13.

PAGE 3 OF 3

DICIDSLHE 2 s

. . .