ML20116B212

From kanterella
Jump to navigation Jump to search
Special Rept SR-92-001-00:on 921010,inservice Eddy Current Exam of SG Tubing Completed,Per 10CFR50.36(c)(2).Total Number of Tubes Have Been Plugged in SG Shown as Listed
ML20116B212
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/23/1992
From: Packer D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SR-92-001-00, SR-92-1, W3F1-92-0432, W3F1-92-432, NUDOCS 9211020105
Download: ML20116B212 (2)


Text

'

1 g ENkOIhy fn ' gyyradons. im, Operations  ;

,i.,

m D.F. Packer W3f1-92-0432 A4.05 OA October 23, 1992 U.S. Nucicar Regulatory Commission Attn: Document Control Desk Wo bioyion, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPf-38 Reporting of Special Report Gentlemen:

Attached is Special Report Number SR-92-001-00 for Waterford Steam Electric Station Unit 3. This Special Report is submitted per 10CfR50.36(c)(2) and Technical Specifications 4.4.4.5.a and 6.9.2.

Very truly yours,

- ) /

({ p n ,d -N "

gu 9 WVI D.F. Packer General Manager - Plant Operations DFP/BRL/ssf Attachment cc: J.L. Milhoan, NRC Region IV G.L. Florreich J.T. Wheelock - INP0 Records Center R.B. McGehee N.S. Reynolds NRC Resident inspectors Office Administrator - LRPD i

i I

L ' '\t

- - - w v- g - - v -.

4 1

)

SPECIAL REPORT

( ,

/

oR-92-001-00 1

i Steam Generator Eddy Current Examination

{ (5thRefueling) i Inservice Eddy Current examination of the Steam Generator (5/G) tubing was l-j completed at Waterford Steam Electric Station Unit 3 on October 10, 1992, l This report is submitted in accordance with Technical Specification (IS)

J 4 4.4.5.a. which requires reporting the number of tubes pluaged in each i

j S/G within 15 days of completing inservice inspection (ISI) of 5/G tubes pursuant to TS 6.9.2. A follow-up report will be submitted in 6ccordance f

i with iS 4.4.4.5.b by October 10, 1993.

I

! The total number of tubes which have been plugged in each S/G are shown i below:-

l S/Gfl S/G #2 i

l Manufacturing /Preservice 6 20 i

Batwing (Preventive Plugging) 149 149 i

l First Refueling 0 1 l Second Refueling 3 0 i

Third Refueling 10 9 l fourth Refueling

[ - Preventive Plugging 4 5 l As a Result of ECT

- Batwing Preventive Plugging 156 156 2

Fifth Refueling 4 5 i Total: 332 345.

l PLANT CONTACT l J.E. Howard, Procurement / Programs Engineering Manager (504) 739-6327 4