1 g ENkOIhy Operations
' gyyradons. im, fn m
,i.,
D.F. Packer W3f1-92-0432 A4.05 OA October 23, 1992 U.S. Nucicar Regulatory Commission Attn:
Document Control Desk Wo bioyion, D.C.
20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPf-38 Reporting of Special Report Gentlemen:
Attached is Special Report Number SR-92-001-00 for Waterford Steam Electric Station Unit 3.
This Special Report is submitted per 10CfR50.36(c)(2) and Technical Specifications 4.4.4.5.a and 6.9.2.
Very truly yours,
)
/
({ p n,d -N gu 9 WVI D.F. Packer General Manager - Plant Operations DFP/BRL/ssf Attachment cc:
J.L. Milhoan, NRC Region IV G.L. Florreich J.T. Wheelock - INP0 Records Center R.B. McGehee N.S. Reynolds NRC Resident inspectors Office Administrator - LRPD i
i I
L
' '\\t w
v-g
- - v
1
)
4 SPECIAL REPORT
(
/
oR-92-001-00 1
i Steam Generator Eddy Current Examination
{
(5thRefueling) i l-Inservice Eddy Current examination of the Steam Generator (5/G) tubing was j
completed at Waterford Steam Electric Station Unit 3 on October 10, 1992, l
This report is submitted in accordance with Technical Specification (IS)
J 4 4.4.5.a. which requires reporting the number of tubes pluaged in each i
j S/G within 15 days of completing inservice inspection (ISI) of 5/G tubes f
pursuant to TS 6.9.2.
A follow-up report will be submitted in 6ccordance i
with iS 4.4.4.5.b by October 10, 1993.
I The total number of tubes which have been plugged in each S/G are shown i
below:-
l S/Gfl S/G #2 i
l Manufacturing /Preservice 6
20 i
Batwing (Preventive Plugging) 149 149 i
l First Refueling 0
1 l
Second Refueling 3
0 i
Third Refueling 10 9
l fourth Refueling
[
- Preventive Plugging 4
5 l
As a Result of ECT
- Batwing Preventive Plugging 156 156 2
Fifth Refueling 4
5 i
Total:
332 345.
l PLANT CONTACT l
J.E. Howard, Procurement / Programs Engineering Manager (504) 739-6327 4