- i GarrsttD. Edwards -
6 Plant Manager F%ach Bottom Atonic Fbwer Station a,
=r PECO NUCLEAR nco eme,,, c,ae,.
A Unit of PECO Energy ~
$8ft,,
8 A13 9032 717 456 4244 Fax 717 456 4232 July 17, 1996 Docket No.
50-277 License No.
DPR-44 i
Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION UNIT 2 SPECIAL REPORT-VENT STACK WIDE RANGE GAS RADIATION
- MONITOR SYSTEM OUT OF SERVICE GREATER THAN SEVEN DAYS
REFERENCES:
PEACH BOTTOM ATOMIC POWER STATION TECHNICAL -
REQUIREMENTS MANUAL 3.6.D.1
Dear Sir:
Description of Occurrence On 6/03/96, the Unit 2 Vent Stack Wide Range Gas Radiation Monitor System (GRMS) was removed from service for a planned modification.. The system was subsequently returned to service on 7/01/96. This modification replaced both the Narrow Range GRMS and the Wide Range GRMS with more reliable equipment.
The time required to perform this modification was necessary to maintain at least one Narrow Range GRMS channel operable at all times. The Peach Bottom Technical Requirements Manual requires a special report submission within 14 days following an initial seven days of Wide Range GRMS inoperability. This report is being submitted beyond :ts required due date. The underlying reasons for the late submittal will be investigated and appropriate corrective actions will be taken.'
j Corrective Actions Taken The Vent Stack Wide Range Gas Radiation Monitor System is used for post-accident monitoring. In the remote possibility that an accident had occured during this period of inoperability, field survey teams would have been dispatched to monitor radioactive effluentg as defined in the Peach Bottom Emergency Plan.
9607230313 960717
.POR ADOCK 05000277 S
\\
b CCN#96-14064
r.
U. S. Nuclear Regulatory Commission Page 2 Plan for Restorina Eauipment to an Operable Status The system was returned to service on 7/01/96 after modification work was completed.
If you have any questions or require additional information, please do not hesitate to contact us.
Sincerely, J
Garrett D. Edwards
///
GDE/GSL/JHG:jhg cc:
B.
Gorman, Public Service Electric & Gas R. R. Janati, Commonwealth of Pennsylvania T. T. Martin, US NRC, Administrator, Region I R. l. McLean, State of Maryland W. L. Schmidt, US NRC, Senior Resident inspector A. F. Kirby ill, DelMarVa Power H. C. Schwemm, VP - Atlantic Electnc i