d VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO.
85-02 APPROVED BY: -
/h t-
' STATION MANAGER i
8504180626 850228 PDR ADOCK 05000280 T ESA R
\\W t
^
C
- Section
,[ g!!
1 Operating Data Report - Unit #1 2
Operating Data Report - Unit #2 Unit Shutdowns and power Reductions - Unit #1 3
Unit Shutdowns and Power Reductions - Unit #2 4
Load Reductions Due to Environmental Restrictions - E it #1 5
Load Reductions Due to Environmental Restrictions-U ;t #2 6
Average DaDy Unit Power Level-Unit #1 7-7 Average DaDy Unit Power Level-Unit #2
~
Summary of Operating Experience 8,9 Amendments to PacDity License or Technical Specifica aos 10 11 FacDity Changes Requiring NRC Approval 11 Facility Changes 'Ihat Did Not Require NRC Approval 12 Tests and Experiments Requiring NRC Approval 12 Tests and Experiments That Did Not Require NRC Appr ral 13 Other Changes, Tests and Experiments 14 Chemistry Report Description of AH Instances Where 'Ihermal' Discharge 15 Limits Were Exceeded Fuel Handling 16,17 Procedure Revisions 'Ihat Changed the Operathg Mode Described in the FSAR 18 Description of Periosc Tests Which Were Not Con., Met Within the Time Limits Specified in Technical Specifice ons 19 1
,,w-
.~. c
._,-4..,...,.,
t-.m,..-,,.
m.
~ ~.
.~
11 Page_
Maintenance of Safety Related Systems During Outage or Roduced Power Periods - Unit #1-Mechanical Maintenance 21
~ Mair.tenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 - Mechanical Maintenance 23 Maintenance of Safety Related Systems During Outage or 25 Reduced Power Periods - Unit #1-Electrical Maintenance Maintenance of Safety Related Systems During Outage or 27 Reduced Power Periods - Unit # 2 - Electrical Maintenance Maintenance of Safety Related Systems During Outage or 29 Reduced Power Periods - Unit #1-Instrument Maintenance Maintenance of Safety Related Systems During Outage or 31 Reduced Power Periods - Unit #2 -Instrument Maintenance l
i 1
s
).
e.
(
VEPCO OPERATING DATA REPORT
( ~
DOCKET NO.
50-280 DATE FEBRU arf 1984 COMPLETED 8Y
- v. JUNES-(
IELEPHONE 804-35f-3184 UPERAllNb Status
(
SURRY UNii 1 se
- 1. UNii NAME FE8RUARY 1985
- 2. REPURilNG PERIOD
- 1. LICENSED THERMAL power -Mwl-2448 I
4 NAMEPLATE RATING -bR055 MWE-847.5 788
M Aul 4UM DEPENUAtst E C AP AC liv -GROS S -MwE-811 I
T. MaxlMuM UEPENDAHLE CAPAClif.-NET MwE-TT5 1
5.
IF LHANGE5 OLLUR IN CAPACITV RATINGS g
-I IE MS 5 IHWUUbH 7-SINCE LAST REPORI. GIVE REASONS
- 9. PUwER LEVEL 10 wHILH RESTRICTED, IF ANf
-NEi MWE -
3
- 10. NF A50NS FOR RE5tRICilON5e IF ANf g
THIS MONTH VR-TO-DATE CUMMULAlivE
\\'
672 0 1416.0 106848 0
- 11. HUUR$ IN REPORilNG PERIOD
- 12. HUMHER ilf HOURS REACTOR wAS CRITICAL 672 0 1359.8
.8$736.5
- 15. REALIUM RESERVE SHUTOOwN HOURS 00 00 3FT4 5
)
672 0 1335.3 84344.4 16 HOUR S GE NE R A T OR UN-LINE 4
I
- 15. UNil R E 5*;R vE SHUTUUwN HOURS 0.0 0.0 3736.2
- 16. b9055 ilcRMAL ENERbf GENER ATED -M WH-1630578 2 29226T1 4 148936848.5 g
li. buuS5 ELELTRICAL ENERby BENE R A IED -MwH-549800.0 977175.9 47879138.8
',53459LD 937746,0 45339590.4
' 100 04 94.3 %
60.3%
- 19. UNIT SERvlLE F At t0R
- 20. UNli AvAlLAHILiif FACTOR 100 0t 94.3 %
63 7%
- 21. UNii LAPAllif TACTOR -USING MDC NET-100 7%
84.5%
57.8 %
- 22. UNtf LAPALITY FACIOR -051Nb DER NET-99.lt 83.1 %
56.8 %
0 04 5.74 20.la '
- 23. UNII FURCEO UUIAbE RATE 24 SHUIOUwN5 SCHEDULED OVER NEX T 6 MONTHS finuhber/ Maintenance 06-14-85 le Days
-IVPE. DATE AND UURATION OF EACH-t
- 25. IF Shui UU4N At END OF REPOR T PERIOD,
't3 f'
ESTIMAir IINE Ut STARTUP
- 20. UNil5 BN TE5i STATUS FORECAST ALHIEVED e
-PHlOR TO Lt)MME R L I AL OPER A TION-O I
INiil AL Leti tlc Allif 1
INiilAL ELELTRilliv ta L OMMERC I AL OPERAil0N
- Modification to increase efficiency have twen made to this unit. Maximum Dependable Cepecity of M will w
continue to be used until new Menimum Dependable g
,4 Capacity (MDC) can be established.
w
o 6 +
e o-WEPCU OPERATING DATA REPORT i
UUCKEI No.
50-288 DATE FEURUARf 1986 (UMPLETED Bf V.
JONES s.
TELEPHONE 804-357-3184 UPENAllNb SIAIUS l'
5URRf UNIT 2
- 4. UNIT NAM 6 g
FEBRUARY 1985
- 2. RE PURi lNb PE R IUD
- 3. LlL( N5tu IHERM AL PUdEK
-MWi-2441
- 4. H AME PL A T E RAIINb -bRUSS MWE-847.5 g
- 5. DESIGN ELELTRICAL R A T ING -NE T MwE-788
- 6. MAKIMJM DEPENUAHLF CAPAClif -GROS $ MwE-811
't. MAXIMUM ULPENDAHLE CAPAClif -NET Mw E -
775 8.
IF LH ANbE S ULLUM IN CAPACITV RATINGS
-lTEMS 3 IHROUGH I-SINCE L AST REPURI. GivF REASUNS
)
f IF ANY 9.
POWER LEVEL 10 wHILH RESIRECTED,
-NET Mwt -
)
- 10. RE ASONS FOR RESTRILi[DNS. IF ANY THIS MONTH VR-TO-DATE CUMMUL Af i vE
)
(
672.0 1486.0 103728.0
- 11. HOUR 5.IN REPORilHG PERIUG
- 12. NUMHER OF HOUR S RE AL IOR WAS CRiflCAL 672.0 1418.0 193720.0
- 13. RE AL IUR RESERvt SHUIDOWN HOURS 00 040 328 1 g
- 14. HOURS LEHERAIUR UN-LINE 672.0 1416.0 es323.8
- 15. UNIf RESERVE Steu T UUwN HOURS 0.0 00 0.0 lb. GNU 55 IHERMAL ENERbf GENER AT ED -MWH-1575733 4 3323,195.0 5 155321519.3 II. GRUSS ELEllRILAL tt4ERbf GENE R ATEU -MwH-583645.8 1983745.0.
58354219.9
- 18. NET ELEC-IRILAL ENFRGf GENERATED -MwH-
.417848.9 1909096.0 47735530.9 100.0t*
100 08 63 98
- 19. UNII SERvlLE EAlluu.
- 20. UNii AvAILAMILliv FACTOR
-100.04 100 0%
65.94
- 21. UNil LAPAttif F Alf 0R -USINb MDL NET-91.8 %
92.lHE 59.44
- 22. UNil L APalli f F ALIUR -USING UER NET-90.24 99.4 %
56.4%
4
- 23. UNIT fuRCEO UUIAbE RATE 0.04 0.04 14.25 24 SHUIUU NS iLHE DULED UvER NEN T 6 MONTH $
-IvPE. DAIE AND UURailuN OF EACH-Refueling 03-22-85 99 Deye
- 25. IF 5*401 HuwN Al ENU OF REPORT PERIUD, k'
ESIIHAIE TIME UF SIARIUP 13
- 26. 00115 IN TEST STATUS FORELAST ACHIEVED
-PRIUR IU LUMMEWLI AL UPER ATION-os li4tilAL tulIILALITY Cp INillAL ELLLIRillIV LUMMERC I At. OPERAllON j
tt l
se
.o A
e o
- O 4
4 IM)CRET No. _ 50-280 UNITShuTDowNs AND tower RtDUCTIONS ifMIT NAME SurryI 4
.IDA1E 03-05-85 l
00MPlETED BY V IL Jonan j
REFORTMONHi February.1985 TER.ErtMME and-357-21a4 4
- "}"
c...Acweet. e l
ucensee g4
.!I
}
Event -
r...es. Rec
..,.ce Acelunle
-( -
4 he.
Dese Rei ni.
]
jay Unit was reduced to 73% power (595 MW's) 85-6 02-25-85 S
0.0 H
I for load following.
4 i
./
n I
~
4 I
I 3
Enidlelt G. Instsucilons Metimd:
for rieposellen of Data
- u l
F: Fwced Reason:
1.Manuel Entry $lieets fm I.leensee 8
5: Sclieduled A Equipment FsNwe(Emplain)
. 2-Manuel Sceem.
Event Repots(LER)FileINUREG. e i
8-Maintenance of Test 3 AmeossiseleScenen.
w C.Reteeling 40 lies (Emplain) 2, 0468)
D-Reguleimy Resteiction il E4peseen, Tseleing & IJcense Emansinellon 5
w
~
F-Adentent:46eelve Esidiple i.Some Simece G-Opeeassosial Ee w (Eaplain) l ll a hee (Emplain) l'*/77)
y e
50-281 IRKET NO.
surry 11
. UNIT SilOTHOWtts AND hMWER REDUCHONS SINIT NAME 03-05-85
- DATE V. II. Jones COMPl.ETED BY 804-357-3184 REPORT MONHO Fahiimi.;, in85 TEl.ErtlONE "L
N) cause A C os m ga..
E (g,,,,,,,
gg
'5 = j I
Acth= 'a ee
)
g
]!
8.
li I
Ewm -
gi 1
r..m I Rum e.c.
u,,-
Deie p
a
,3
,,, o
,g R,,,,,,
L; 3,
~
Unit was re'duced to 63% power (495 MW's) 85-2 02-01-85 S
0.0 A
1 for repairs of 2-FW-P-1B.
Pump bearings were repaired and pump was RTS on 02-04-85.
}
}
i
./
4 l
i I
i 1
i 4
l 3
Enlilipit G Instiucikms Method:
tot prepaesikm of Dmin
[
I F: FmeeJ Reesem:
1.Manuel Entry Sheessim Licensee
<o 3: 5thsta=8e.d A Eigmipment Fallae(Esplein) 2.Mennel 5ceem.
Event Repal(LER) File INUREC-'.
4 3.Malatenance of Test 3 Autonistic Sevens.
0168) 1 o
i C. Refuel:ag 4 Othes(Emplelse)
]
D-Reguleemy RestslesIon E-Opesetne Teelning & IJcense Essenhisthwi 5
Ealiable 1 - Same Source F Adeninisttottu G Opeestlessel Esene(Emplain) llethes (Emplain) l9117)
?
Paas 5 of 31 LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO.
I MONTH: February,1985
- DATE, TIME HOURS-LOAD. MW.
REDUCTIONS, MW MWH REASON NONE DURING THIS REPORTING PERIOD.
9 4
'I em O
O l
l I
i t
MONTEY TOTAL Er
s Page 6 of 31 LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO.
2 MONTH:
Februarv,1985 t
l I
- DATE, TIME HOURS-LOAD. MW REDUCTIONS, MW MWH REASON NONE DUFING THIS REPORTING PERIOD.
9 e
4 e
I MONTHLT TOTAL 6
,.q ;
e CEPLO AVENAbt Ja L v uni t power LEVEL SURRY PO=ER SIAft04 REPORTING MONTH - FESRUARY 1985 00LKET NO. 50-280 DOLKE7 NO. 50-2 RI UATE FtuRUARf 1985 LOMPLETED uf W.
JONES-UN I T DN E UN I f Tw0 AVERAGE dally PDwER LEVEL AVER AGE D AILv power LEVEL DAv
-MwE-NET--
-MwE-NET-I F85.6 722 2 2
782 5 447.2 3
F80.5 445.2 F82 4 588.0 4
5 F83.2 744.9 6
F85 3 745.5 i
F85.1 745.2 8
F82.5 F43.6 9
782 2 F45.8 10 F83 7 747.0 11 782 9
/*7.8 12 781 9 729.2.
13 F84 1 745.6 14 Fel.?
743.4 15 786.3 744.3 le 788.0 F45.7 17 788.3 F45.7 18 788.3 '
746.5 19 786.9 742.3 j
20 F86 2.
745.1 21 784.5 744.6 22 788.0 747.3 23 F84.9 715.3 24 F76 4 707.5 25 707.6 26 761 8 Fil.9 696 1 27 F84.0 728.5 28 F84.0 728.5 m
Q N
O lab
.h o
b.
P ga 8 of 31
SUMMARY
CF OPERATDIG EXPERIENCE Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT ONE 02-01-85 0000 This reporting period begins with the unit at 100 % power (820 MW's).
02-24-85 0338 Commenced power reduction for load following at 150 MW/hr.
0407 Holding power at 92% (770 MW's).
0715 Commenced power increase at 3%/hr.
0925 Unit at 100% power (825 MW's).
2245 Commenced power reduction for load following at 150 MW/hr.
02-25-85 0040 Holding power at 73% (595 MW's).
0420 Commenced power increase at 3%/hr.
1316 Unit at 100% power (820 MW's).
02-26-85 0005 Commenced power reduction for load following at 150 MW/hr.
0100 Holding power at 86% (720 MW's).
0330 Commenced power increase at 3%/hr.
0830 Unit at 100% power (820 MW's).
02-28-85 2400 This reporting period ends with the unit at 100% power (820 MW's).
Paga 9 cf 31
SUMMARY
CF CPERA1118G EXPERIENCE Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT TWO 02-01-85 0000 This reporting period begins with the unit at 100% power (780 MW's).
02-01-85 2115 Commenced power reduction for 2-FW-P-1B repairs at 150 MW/hr.
2240 Holding power at 63% (495 MW's).
02-04-85 0556 Commenced power increase at 150 MW/hr. 2-FW-P-1B returned to service.
0727 Reduced power increase to 3%/hr due to "6B" feedwater heater level alarms.
02-05-85 0150 Unit at 100% power (785 MW's).
02-12-85 0020 Commenced power reduction at 150 MW/hr for load following.
~
0130 Holding power at 88% (680 MW's).
0445 Commenced power increase at 150 MW/hr.
0615 Unit at 100% power (785 MW's).
02-23-85 0239 Commenced power reduction at 150 MW/hr for load following.
0542 Holding power at 88% (680 MW's).
0545 Commenced a slow power increase due to potential"6B" feedwater heater alarms.
0730 Unit at 100% power (775 MW's).
02-24-85 0319 Commenced power reduction at 150 MW/hr for load following.
0350 Holding power at 91% (700 MW's).
0713 Commenced power increase (slow).
0930 Unit at 100% power (780 MW's).
02-26-85 1600 Commenced power decrease due to losing condenser vacuum while "2C" waterbox is out of service.
1630 Holding power at 86% (520 MW's).
1735 Commenced power increase (slowly), "2C" waterbox RTS.
2030 Unit at 100% power (780 MW's).
02-28-85 2400 This reporting period ends with the unit at 100% power (780 MW's).
Pcg3 10 of 31 AMENDMENTS TO FACILITY LICENSE OR TECHNICAL SPECIFICATIONS MONTH / YEAR February,1985 The Nuclear Regulatory Commission issued on 01-22-85, Amendment No(s) 101 & 100 to the Operating License for Surry Power Station, Unit No(s) 1 & 2. This Amendment concerns deletion of control rod drop time testing at cold conditions.
The Nuclear Regulatory Commission issued on 02-01-85, Amendment No.
101 to the Operating License for Surry Power Station, Unit No.
2.
This Amendment concerns extension of snubber inspection interval-Unit 2.
e B
i I
i
'a j
t
Paon 11 of 31 FACILITY CHANGES REQUIRING NRC APPROVAL FEBRUARY,1985 NONE DURING THIS REPORTING PERIOD.
e FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL NONE DURING THIS REPORTING PERIOD.
e 6
l 4.=a<--.-s y.,.~..p.
---..e
-m-.--.L
~v.
7-.--
,-.-,.!?
- -, ~, - -'
Paga 12 of 31 TESTS AND EXPERIMENTS REQUIRING NRC APPROVAL FEBRUARY,1985,
NONE DURING THIS REPORTING PERIOD.
TES15 AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL FEBRUARY, 1985 NONE DURING THIS REPORTING PERIOD.
6 fb
-.- - -. -..,., - -- n, -
---~-----~-,r
,.v-
-v
--+-
' - - -- - - - - - ~ - - - ' * * ' ' ' - ' " *
~
Page.13 of 31 fyrHER CHANGES, TESTS AND EXPERIMENTS l
FEBRUARY,1985 NONE DURING THIS REPORTING PERIOD.
6 S
9 9
4
.)
PCU 2E-06 Pcga 14 of 31
'e VIBGINIA PO R SURE POWE:R SMIT CHEMISTRY REPORT FEBRUARY 19 85 PRIMARY COor. ANT N NO. 1 tR1IT NO. 2 gggg MAXIM.N MDTDD' AVER 7GE MAXDiN MINDO: AVERAGE Gross Radinart., uCi/mi' 1.21E+0 4.00E-1 8.37E-1 9.59E-2 5.22E-2 7.50E-2 SS-i *-" Solida,==a 0.0 0.0 0.0 0.0 0.0 0.0 3ross Tritium, uCi/mi 2.10E-1 1.01E-] 1.60E-1 4.69E-2 2.79E-2 4.06E-2 131 Irvi*ne
, uCi/mi 1.48E-1 5.04E-2 7.54E-2' 7.97E-4 9.98E-5 2.15E-4 131 131 I
jy 0.47 0.30 0.34 0.24 0.08 0.14
' Rya w i, cc/kg 42.9 34.2 38.8 39.1 27.7 33.1 LiStium,===
(A) 1.66 1.35 1.49 0.61 0.32 0.41 Boron-10, = n*
160 148 155 34 5
14 Oxygen, (D.O.), m,n s 0.005 s 0.005 s 0.005 s 0.005 s 0.005 s 0.005 50.hk s0.hk5 sb1 50.hk5 50.02-5 0.02 Chloride, y pH 9 25'C 6.42 6.22 6.32 7.13 6.68 6.94
- Boron-10 = 'Ibtal Boron x 0.196 RENARKS: (A) CATIN BED PIACED IN SERVICE N UNIT CRE ETR LITHIW RDWAL CN 2-1, 2-7, 2-12, 2-17, AND 2-21.
ADDED LITHItM '10 UNIT 'INO: 518 GR8MS N 2-4 NE 100 GRAMS W 2-17.
(B) DURDG 'IHE KN1H ' DIE CHIDRIDE IIMER DETECTICE LIMIT NAS CHANGED FRCH 50.02 ppu
'Io 50.01 ppn.
g
- ~
Paga 15 of 31 DESCRIPTION OF ALL INSTANCES WHERE THE En FEBRUARY, 1985 NONE DURING THIS REPORTING PERIOD.
0 4
l l
Is -
n
,--,---e
-r
--~~---n--
~~w-=r-~~'
~ m
w-~'**
~"'^^*v
'*'^'-'~'*^~~"V
" ' ' ~ ' ~ ' '
Paos 16 cf 31 UNIT #
I MONTH / YEAR Februarv,1985 DATE NO. OF ANSI NO.
NEW OR SPENT FUEL SHIPPED / RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEI NOME DURING THIS REPORTING PERIOl >
O M
l 1
i l
4
Paan 17 of 31 J..
FUEL '{ANDLING UNIT #
H MONTH /YEAE February,1985 DATE NO. OF ANSI NO.
NEW OR SPENT FUEL IEIPPED/ RECEIVED ASSEMBLIES PER S$IPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVI' I
NONE DURING ' ~HIS REPORTING PERIOD a
e
)
" ' ~ ~ '
Pco 18 of 31 PROCEDURE REVISIONS THAT CHANGED THE OPRRATmG MODE DESCRIBED Di THE FSAR FEBRUARY, 1985 NONE DURING THIS REPORTING PERIOD.
O h
'\\
Pag]19 of 31 DESCRIPTION OF PERIODIC 11tSTS WHICH WERE NOT COMPLETED WITmW Tetz TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH / YEAR February,1985 UNIT PRO.NO.
TITLE 2.42 Functional Testing of Control Room Habitability, 1
Redundant Chlorine Monitor (CLA-VS-100A) 1 37.1 Electrical Hydrogen Recombiners 2
37.1 Electrical Hydrogen Recombiners 38.46 Chemistry Sampling - Station Discharges (Discharge 1&2 No. 999, Reported as 999) e
]
Page 20 of 31 MAINTENANCE OF SAFETY RELATED SYFrEMS DURING OUTAGE OR REDUcau POwns PERIODS UNrrNO.1 MECHANICAL MAINTENANCE 9
4 hO
YEPCO SAFETY N1ATD IMtllE EBLED P0hp EORTD BY LMIT AND DEPARTIENT pam 21 cf 31 gRugRY 85 FROM MTINED TO 410 MPT SERVICE MALE DUGER luen 140 TITLE HISTtRY SIMtARY
(
0220 02/XdW5 01-BR -
-3 014239 DIAPtNdin LEAN. IdATE LEAKS F910VED V.V 3010ET, IlWE!:TED DIA-PtRAIN, If!ER. Ale DTIER EALIls S'MA28. RDtACD DIAPIRA91 &
FJPLA3D PmeET & 70 RED SNE.
B.~ MET PMVIOUGLY ISTALLD 18015.
)
0228 02/25/SE 01-CH -Fi -242 003457 F910VE Il4SULATIDR & IItSTN L C0'F'ITD LNDER DC 84-59
.I 0220 02/25/85 01-GW -
-77 001121 1-014-77 F FILTER DIS::K%0E F3tACED MNET ASSY TORRED 50 FT.
valve LPS.
0220 02/25/95 014tc -E
-1A 009427 RDENE SWllK BOLT t5 HELICDIL t12,15,11,7 BAD TlMADS 7.11,16 TMIEADS REPAIK D ON Ntt.E 14 9tLT STISB 12+15 3* TS RDENED Ale IEPh!RB ftAM 02 3 02/25/35 014W 4 m -14 009610 fENNE, FUNCTIONAL TEET, IEPp.O DEAMR IN ACIIItDMEZ li!TH 199-C 4GB-13011-2H4 0220 02/25/M 01 -70 014125 PIPE FITTDC LEAKING T19ffDD PIPE PITTils 4
t 9
e 4
0 0
6 O
e
r.
i j
Pcom 22 of 31
)
I l
l MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCm POWER PERIODS l
UNIT NO. 2 MECHANICAL MADETENANCE l
+
9 9
M N RELATD IAADE REBUCED FQdER SORTD BY UNIT AND DEPARTE FEBRUARY,BARY1985 Page. 23 of 31 FROM -
.L
. UNIT 02 IETLNDED 70 yo E
SERVICE MARK MMBER MA9ER WO TITLE HISTORY M 0220 02/03/95 02-CV -P
-1A 013345 F9tP VILL 10T Ft**
KDO.D OLD MPF, INSTALLED 161 Ft#F, ADJJ61D BELT.
s
\\
a me 4
6 S
0 o
1 e
m O
i.-
~
____m_______
Page 24 of 31 MlLINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 ELECTRICAL MAINTENANCE af
@ tXI
- SAFETY llELATD RRiisi anti:Th 80lER SORTED BY (MIT AND DU%RTIENT Paoe 25 of 31 Filst. FEBRUARY 1 85
~
IMIT 01 RETIFdED TO WD DEPT SERVIE MARK M.lMbER psER WO TITLE HISTUtY RetWtY tYW1.E TO 05TAIM FROS Il@ICA-DECKED OUT WIRING FOLIC WIRE 0229 02/25/95 01-5W -P2/ -103D 013:;38 ens in the Hi Hi CLS SHORT D A:lROSS XI ON TER.BLK. AT cabinet t01 LIMIT SW. CHANGED POSITION 7 LUG, CORRECTED PROBLEM VITH RELAY (10 CLS LIGHT. INST TECHE DID PTS.5 I.
e e
e 4
e e
I 1
l I,
y' I
as
e Pace 26 of 31 1
MADtTENANCE OF SAFETY RELATED SYNTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 ELECTRICAL MADITENANCE i
l i
1 l
1 l
l f
___.Jy..i..,
r-WEPCD.* SA*ETY RELATD BLRIlG REDLED poler S(RTD BY WIT AND DENRTIENT
-- P ge 27 of 31 FROM. gRgRW85 RET 1M ED TO WD DEPT SERVI 2 MARK ltlMEER luiMR WO TIRE HISTORY N t
0229 02/(4/E 02-GW -TV -202 013363 VALVE HG F_0'.N DI%
F9' ACEL DIODE PER EPP-C-SOV-92 OH ENERGIZING UALVE.FG.!ND (FEN LIMIT CL'T OF ADJUSTMENT.ADESTED LIMIT.RETtHED UALVE TO SERVI 2.
'~
g 6
m
- g o
O V
I k
Pagt28 of 31 e.
MADtTENANCE OF SAFETY RELATI:D SYSTEMS DURDIG OUTAGE OR REDUCED PODfER PERIODS s
UNIT NO.1 INIrrRUMENT MADITI: NANCE e
9 2
2
.~
--_w_,-
4 iEPCD SMETY RELATEN BL5tDE REBLEED PmER fl0RTED BY LNIT AND DEPMTPENT PIge 29 cf 31' FROM FEBRUARY 1985 D
LMIT 01 analRY RET 13tfED TO..
WO IEPT SEWICE HARK NLMBER IUSER WO TITLE HISTORY SUPflARY 0237 '02/35/B5 01-BR -LI -100 013183 FDFORM 1E MONTH CALIBRATION FIFF0ttID 19 M3mi CALIERATION REPL (LED MAiWF LS-BR-100P
.;237 02/25/B5 01-MS -PI -464A 014059 CHA!#EL 4 STEAM HEADER F.EFtt."ED TFA*SMITTER FOUND TRNEMIT TER FAILED HIGH. REFLA::ED SAME AND FECALIIMTED OPN SAT
.m e
een e
sem e
Me e
D e
e D$
T Paga 30 of 31 r
MAINTENANCE OF SAFETY RELATED SYSTEMS DURDIG OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 DtirrRUMENT MADITENANCE e
a to
r 1
I WiPCD
- ' SAFETY IELATD.DLRDE EDLEED SORTD N LMIT AND MPARTENT Farm. FEBRUARY. T9 5 ~
LMIT 02 BARY Page 31 of 31 RETURED TD WD DEPT -SERVICE MARK MMBER EMBER WO TITLE HISTCRY SLNMARY CHAMEL READS HIGH IN C0rFtRI-LI-477A IS READDG 0237 02/03/95 02-16 -LI -477A 010005 son to other channels
. OTER WILE RAMIE LEVEL INDICATOTG DN TE FIPE PROTECTION PAEL.0FS when selected SATISFID THoT TERE IS le PROE.EM 0237 02/03/95 02-46 -LI -487A 010006 CHAP 6EL INDICATION POES EDT LI-4E7A SSJING SAE AS TE OTHER WILE RNDE LEVEL INDICATORS ON THE chan9e FIFE FRDTECTION PAEL.tPS SATISrID THAT TFEE IS NO PROKD
. ' 0237 02/03/95 02-96 -TV -209 009283 PETCOCK MISSDE SCREM IN TIGHTEED PETCOCK SCREE THAT WAS IN bottom P.JiCE NO AIR BLOWDE BY CPS. SAT
~.
e m
64
'6N
'~
e
,,wea
.m e
a m 0F REPORT 9
d e
0 h
1
y Mckwrthmaions Oputment x
nmuL Snwar O
. %kel+esident y cgge u m.
N"'k" CP**'0"*
CwMs%.r%
?.
g-e.
Rkinsord \\*irg$nia23261 s
March 15, 1985 vmonwaroemer Mr. Maurice R.'Beebe Serial No.'85-184 Office'of Resource Management N0/JDH:aca U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, D.'C.
20555 50-281
. License Nos..DPR-32
Dear Mr. Beebe:
' VIRGINIA POWER SURRY POWER STATION UNIT NOS. 1 AND 2
~
MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for Surry Power' Station Unit Nos.-1 and.2 for the month of February,~1985.
Very truly yours, bf S
j, \\'\\
G kEJ W. L. Stewart Enclosure-(3 copies)
.cc:
Mr. J.' Taylor, Director-(12 copies)
~
Office'of Inspection and Enforcement
'Dr. J. Nelson Grace -(1 copy)
Regional Administrator Reg!on II.
-[
'Mr..D. J. Burke NRC Resident Inspector
-Surry Power Station m
'/ r
)
t