Monthly Operating Rept for Sept 1992 for WCGS
ML20115B916
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/30/1992
From: Maynard O, Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WO-92-0122, WO-92-122, NUDOCS 9210160334
Download: ML20115B916 (7)


Text

-

.-.,~

s -

NUCLEAR OPERATING October 13,-1992 WO 92-0122 U. S. Nuclear. Regulatory Commission ATTN: Document Contrul Desk Hall Station PI-137 Washington, D. C. 20555

Subject:

- Docket No. 50-482:

September,1992, Montraly i

Operating Report Gentlemen:

Attached is the September, '1992, Monthly Operatins; Report -for Wolf Creek Generating-Station.

This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.

Very truly yours, 4^ -

// /p sq at Otto L. - Mayna rd Vice President Plant Operations

~-*

OLM/jra Attachment cc:

A. T. Ilowell (NRC), v/a J. L. M11hoan (NRC), 9/a G. A. Pick-(NRC), w/a W. D. Reckley-'(NRC), w/a o

9210160334 920930 PDR ADOCK 05000482 R

PDR

'.a.v u v v v

. PO. Box 411/ Dvh ton KS 66839 i Pheny (316) 364-8331 J

An Squ# Opgxytnty Egover MF+1C/ VET-

[.-

4 Y.

--en v.---

.... ~

s-4

-l Attachment l-to - WO 0122, L

-U-

s

!i t

i t

l b

j WOLF CREEK NUCLEAR OPERATING CORPORATION j

=!]

WOLF CREEK GENEPATING STATION

.i MONTHLY OPERATING REPORT

-l

. 1 MONTH: j entember YEAR:

1992 l

Docket No.:

50-482-l

~

i Facility Operating License No.:.NPF-4:

-1

'_ F. - I Report No.

91

' j i

_1]

l

.b

l il l

Prepared by:

Merlin G. Williams j

]

j

,s

l I

1 i

e --....

+

LAttachment to1VO 92-0122'

~

1.7 St.M1ARi J

i The following report highlights the operating experience of Wolf Cfeek Generating Station for the month of_ September, 1992, 'This_ report is being; provided pursuant to. Technical Specification 6.9.1.8.

1.

SUMMARY

'0F OPERATING EXPERIENCE The unit operated at or near-1002 power throughout the month of September.

'i II' MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES No major safety related maintenance activities were perfornred'during the-L month of September.

I a

i i

I a

y Wolf Creek-Generating'S'tation Monthly operating Report September.1992 Page 1 of 5

.__m

-t

< Attachment to WO.92-0122 OPERATING DATA REPORT DOCKET NO.-

50-482-WOLF CREEK GENERATING STATION

.VOLF CREEK NUCLEAR = OPERATING CORPORATION.

DATE 10-01492 COMPLETED BY M. Williams' TELEPHONE 316-364-8831

- OPERATING STATUS 1.

Reportit.g Period:

September. 1992 Gross Hours la Reporting Periods

-720 _

2.

Currently Authorized Power Level (MWt): 3411 Max. Depend. Capacity (MWe-Net): 1131' Design Electrical P.ating (HWe-Net):

1170

=3.

Power Level to Which Restricted (If Any)(MWe-Net):

N/A A.

Reasons for restriction (If Any):

N/A

. Cumulative This Month Yr. to Date-5.

Number of Hours Reactor was Critical 720.0 5.429.1 49.119.2 6.

Reactor Reserve Shutdown-Hours 0.0 0.0 339.8'-

.-7.

Hours Generator on Line 724.0 5.361.5 48.473.7 8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 18;069.012 158.162.603 9.

Gross. Thermal Energy Generated (MWH) 2 453.478 2

_.10. Gross Electrical Energy Cenerated (MWH).

856.565 6.301.241 55.014.747 11.

Net Electrical Energy Generated (MWH) 823.457 6.012.922 52.468.393

=

"12.

Reactor Service Factor 10 0. 0__,

82.6 79.2

1?

Reactor Availability Factor 100.0 82.6-

-79.7 14.

Unit Service Factor 100.0,__

81.5 78.1 15.

Unit Availability Factor

'100.0 81.5 78.1 1 6.

_ Unit-Capacity Factor (Using MDC) 101.1-80.9 74 8 1

117. Unit Capaelty Factor (Using Design MWe) 97.8 78.2 72.3 l18.

Unit Forced Outaga_ Rate 0.0 18.5 6.6 i

Sbutdowns Schedul,ed Over Next-6 Months (Type, Date, and Duration of each): Refueling.

b

'19.

L Outage on March 4, 1993 for 65 days.

l 20.

IfLShut Down at End of Report Period, Estimated Date of Startup:

_IU A Wolf Creek Cenerating Station.

Monthly Operating Report September 1992=

Page 2lof 5

'O ~ ~.

4

' Attachment to'WO 92-0122-.

AVERAGE DAILY UNIT POWER LEVEL:

1

.D0 MET NO.

50-482' WOLF--CREEK GENERATING STATION:

WOLF CREEK NUCLEAR OPERATING CORPORATION =

-DATE 10 01-92 COMPLETED BY M. Williams TELEPHONE-316-364-Ba31 IHONTH September, 1992

- DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1142 17 1142 2'

1142 18 1144

.3' l1' 40 19 1147 4-1139 20 1146 5

1141 21

_1_141 6-1141 22 1145 7-1140 23-1145 3.

8' 1143 24 1146 9-1143 25 1146-

.10.

1143 26 1147 11 1144 27 1147

-:12 1145 28 3147

13 -

1144 29 1149 14-

=1140 30 1148 15' 1141 31 N/A-

'16 1142

' Wolf Creek-Generating Station' Monthly Operating' Report September 1992 Page'3 of 5 9

4 is.--Je

-p-

-e-grr r

.ph, 4

r..

e-

-s

~

g y

Attachment-to WO 92-0122' UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.

S0-482 ?

WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 10-01 COMPLETED BY M. Williams REPORT MONTH September. 1992 TELEPHONE 316-364-8831 TYPE lMETHODSSHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COP 9fENTS

[k)

Date S: SCHEDULED (EOURS)

(1)

OR REDUCING POWER (2)

I SUt9(ARY:

The unit operated at or near 100I power throughout the month of September.

1) REASON: A:

EQUIPMENT PAILURE (EXPLAIN)

E: -OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:

1.

MANUAL B: MAINTENANCE OR TEST F: ADLTNISTRATIVE 2.

MAN'JAL SCRAM C: REFUELING G: OPEkATIONAL ERROR (EXPLAIN) 3.

AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.

CONTINUED 5.

REDUCED LOAD-9.

OTHER Wolf Creek Generating Station Monthlv Operating Report September-1992

.Page 4 of 5

4 httec,hment.to'NO 92-0122-4 WOLF CREEK NUCLEAR OPERATING CORPORATION-

-VOLF CREEK GENERATING STATION a.

-UNIT NO _1 MONTH Sentamber.'1992 j

--l

SUMMARY

OF OPERATING-EXPERIENCE.

Listed below in chronological sequence is a: summary of operating experiences.for this month._

which required-' load reduction or resulted in significant non-load related incidents.

DATE TIME EVENT

' September 1, 1992 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100I power.

. September 30,' 1992 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 100Z power.

f l

l,.

l i

h.

Wolf. Creek Generating'_ Station Monthly Operating. Report-l

- September-1992'.

- Page 5 of 5 O

est <~

4 h

4 w-y P