NUCLEAR OPERATING October 13,-1992 WO 92-0122 U. S. Nuclear. Regulatory Commission ATTN: Document Contrul Desk Hall Station PI-137 Washington, D. C. 20555
Subject:
- Docket No. 50-482:
September,1992, Montraly i
Operating Report Gentlemen:
Attached is the September, '1992, Monthly Operatins; Report -for Wolf Creek Generating-Station.
This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.
Very truly yours, 4^ -
// /p sq at Otto L. - Mayna rd Vice President Plant Operations
~-*
OLM/jra Attachment cc:
A. T. Ilowell (NRC), v/a J. L. M11hoan (NRC), 9/a G. A. Pick-(NRC), w/a W. D. Reckley-'(NRC), w/a o
9210160334 920930 PDR ADOCK 05000482 R
'.a.v u v v v
. PO. Box 411/ Dvh ton KS 66839 i Pheny (316) 364-8331 J
An Squ# Opgxytnty Egover MF+1C/ VET-
[.-
4 Y.
--en v.---
.... ~
s-4
-l Attachment l-to - WO 0122, L
-U-
- s
!i t
i t
l b
j WOLF CREEK NUCLEAR OPERATING CORPORATION j
=!]
WOLF CREEK GENEPATING STATION
.i MONTHLY OPERATING REPORT
-l
. 1 MONTH: j entember YEAR:
1992 l
Docket No.:
50-482-l
~
i Facility Operating License No.:.NPF-4:
-1
'_ F. - I Report No.
91
' j i
_1]
l
.b
- l il l
Prepared by:
Merlin G. Williams j
]
j
,s
- l I
1 i
e --....
+
LAttachment to1VO 92-0122'
~
1.7 St.M1ARi J
i The following report highlights the operating experience of Wolf Cfeek Generating Station for the month of_ September, 1992, 'This_ report is being; provided pursuant to. Technical Specification 6.9.1.8.
1.
SUMMARY
'0F OPERATING EXPERIENCE The unit operated at or near-1002 power throughout the month of September.
'i II' MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES No major safety related maintenance activities were perfornred'during the-L month of September.
I a
i i
I a
y Wolf Creek-Generating'S'tation Monthly operating Report September.1992 Page 1 of 5
.__m
-t
< Attachment to WO.92-0122 OPERATING DATA REPORT DOCKET NO.-
50-482-WOLF CREEK GENERATING STATION
.VOLF CREEK NUCLEAR = OPERATING CORPORATION.
DATE 10-01492 COMPLETED BY M. Williams' TELEPHONE 316-364-8831
- OPERATING STATUS 1.
Reportit.g Period:
September. 1992 Gross Hours la Reporting Periods
-720 _
2.
Currently Authorized Power Level (MWt): 3411 Max. Depend. Capacity (MWe-Net): 1131' Design Electrical P.ating (HWe-Net):
1170
=3.
Power Level to Which Restricted (If Any)(MWe-Net):
N/A A.
Reasons for restriction (If Any):
N/A
. Cumulative This Month Yr. to Date-5.
Number of Hours Reactor was Critical 720.0 5.429.1 49.119.2 6.
Reactor Reserve Shutdown-Hours 0.0 0.0 339.8'-
.-7.
Hours Generator on Line 724.0 5.361.5 48.473.7 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 18;069.012 158.162.603 9.
Gross. Thermal Energy Generated (MWH) 2 453.478 2
_.10. Gross Electrical Energy Cenerated (MWH).
856.565 6.301.241 55.014.747 11.
Net Electrical Energy Generated (MWH) 823.457 6.012.922 52.468.393
=
"12.
Reactor Service Factor 10 0. 0__,
82.6 79.2
- 1?
Reactor Availability Factor 100.0 82.6-
-79.7 14.
Unit Service Factor 100.0,__
81.5 78.1 15.
Unit Availability Factor
'100.0 81.5 78.1 1 6.
_ Unit-Capacity Factor (Using MDC) 101.1-80.9 74 8 1
117. Unit Capaelty Factor (Using Design MWe) 97.8 78.2 72.3 l18.
Unit Forced Outaga_ Rate 0.0 18.5 6.6 i
Sbutdowns Schedul,ed Over Next-6 Months (Type, Date, and Duration of each): Refueling.
b
'19.
L Outage on March 4, 1993 for 65 days.
l 20.
IfLShut Down at End of Report Period, Estimated Date of Startup:
_IU A Wolf Creek Cenerating Station.
Monthly Operating Report September 1992=
Page 2lof 5
'O ~ ~.
4
' Attachment to'WO 92-0122-.
AVERAGE DAILY UNIT POWER LEVEL:
1
.D0 MET NO.
50-482' WOLF--CREEK GENERATING STATION:
WOLF CREEK NUCLEAR OPERATING CORPORATION =
-DATE 10 01-92 COMPLETED BY M. Williams TELEPHONE-316-364-Ba31 IHONTH September, 1992
- DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1142 17 1142 2'
1142 18 1144
.3' l1' 40 19 1147 4-1139 20 1146 5
1141 21
_1_141 6-1141 22 1145 7-1140 23-1145 3.
8' 1143 24 1146 9-1143 25 1146-
.10.
1143 26 1147 11 1144 27 1147
-:12 1145 28 3147
- 13 -
1144 29 1149 14-
=1140 30 1148 15' 1141 31 N/A-
'16 1142
' Wolf Creek-Generating Station' Monthly Operating' Report September 1992 Page'3 of 5 9
4 is.--Je
-p-
-e-grr r
.ph, 4
r..
e-
-s
~
g y
Attachment-to WO 92-0122' UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.
S0-482 ?
WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 10-01 COMPLETED BY M. Williams REPORT MONTH September. 1992 TELEPHONE 316-364-8831 TYPE lMETHODSSHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COP 9fENTS
[k)
Date S: SCHEDULED (EOURS)
(1)
OR REDUCING POWER (2)
I SUt9(ARY:
The unit operated at or near 100I power throughout the month of September.
- 1) REASON: A:
EQUIPMENT PAILURE (EXPLAIN)
E: -OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:
1.
MANUAL B: MAINTENANCE OR TEST F: ADLTNISTRATIVE 2.
MAN'JAL SCRAM C: REFUELING G: OPEkATIONAL ERROR (EXPLAIN) 3.
AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.
CONTINUED 5.
REDUCED LOAD-9.
OTHER Wolf Creek Generating Station Monthlv Operating Report September-1992
.Page 4 of 5
4 httec,hment.to'NO 92-0122-4 WOLF CREEK NUCLEAR OPERATING CORPORATION-
-VOLF CREEK GENERATING STATION a.
-UNIT NO _1 MONTH Sentamber.'1992 j
--l
SUMMARY
OF OPERATING-EXPERIENCE.
Listed below in chronological sequence is a: summary of operating experiences.for this month._
which required-' load reduction or resulted in significant non-load related incidents.
DATE TIME EVENT
' September 1, 1992 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100I power.
. September 30,' 1992 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 100Z power.
f l
l,.
l i
h.
Wolf. Creek Generating'_ Station Monthly Operating. Report-l
- September-1992'.
- Page 5 of 5 O
est <~
4 h
4 w-y P