Monthly Operating Rept for Sept 1992 for WCGS
ML20115B916
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/30/1992
From: Maynard O, Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WO-92-0122, WO-92-122, NUDOCS 9210160334
Download: ML20115B916 (7)


Text

- .-. ,~ . _ _ .. . , . . - . - . . . . . .

s - -,

NUCLEAR OPERATING October 13,-1992 WO 92-0122 U. S. Nuclear. Regulatory Commission ATTN: Document Contrul Desk Hall Station PI-137 Washington, D. C. 20555

Subject:

- Docket No. 50-482: September,1992, Montraly i Operating Report Gentlemen:

Attached is the September, '1992, Monthly Operatins; Report -for Wolf Creek Generating-Station. This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.

Very truly yours, 4^ - .

// /p sq Otto L. - Mayna rd at Vice President ~

Plant Operations -*

OLM/jra Attachment cc: A. T. Ilowell (NRC), v/a J. L. M11hoan (NRC), 9/a '

G. A. Pick-(NRC), w/a W. D. Reckley-'(NRC), w/a o

9210160334 920930 PDR ADOCK 05000482 -

R PDR

'.a.v u v v v . PO. Box 411/ Dvh ton J KS 66839 i Pheny (316) 364-8331 '

An Squ# Opgxytnty Egover MF+1C/ VET- [ .-

-- 4 Y. $ - --en ,,- v.---

. . --- - - - . -. . . - . . .. . . ~ - --

s-4

-l Attachment l- to - WO 0122, L -U-

s i

t i

t b

l .

j WOLF CREEK NUCLEAR OPERATING CORPORATION j

=!

WOLF CREEK GENEPATING STATION ]

.i MONTHLY OPERATING REPORT -l

.1 MONTH: j entember YEAR: 1992 l

~

Docket No.: 50-482- l i

Facility Operating License No.: .NPF-4: -1

'_ F . - I Report No. 91 'j i

_1

] l

.b

l il l

Prepared by:

Merlin G. Williams .

j

]

j

,s

l ,

, I i

e -- . . .. _ _ _ _ . - . _ . - - . . . . . . . - _ . . - - . - _ . . . . . . . . . . . . _ _ . - . . . . _ . . . . . . . . . - . . . . . . . . . . . _ _ _ . . . . . . - . . _ _

1

+ ,,

~

. LAttachment to1VO 92-0122'  !

1.7 .

St.M1ARi J i

The following report highlights the operating experience of Wolf Cfeek Generating Station for the month of_ September, 1992, 'This_ report is being; ,

provided pursuant to. Technical Specification 6.9.1.8.

1.

SUMMARY

'0F OPERATING EXPERIENCE The unit operated at or near-1002 power throughout the month of September. 'i-II'. MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES ,

No major safety related maintenance activities were perfornred'during the-  !

L month of September. I a

i i

I a

y Wolf Creek-Generating'S'tation Monthly operating Report _

September.1992 -

Page 1 of 5

. . . _ . _ _ _ _ . , _- _- . . , .__m , .

-t

< Attachment to WO.92-0122 .

OPERATING DATA REPORT DOCKET NO.- 50-482-  ;

WOLF CREEK GENERATING STATION

.VOLF CREEK NUCLEAR = OPERATING CORPORATION.

DATE 10-01492 COMPLETED BY M. Williams' TELEPHONE 316-364-8831

- OPERATING STATUS

1. Reportit.g Period: September. 1992 Gross Hours la Reporting Periods -720 _
2. Currently Authorized Power Level (MWt): 3411 Max. Depend. Capacity (MWe-Net): 1131' Design Electrical P.ating (HWe-Net): 1170

=3. Power Level to Which Restricted (If Any)(MWe-Net): N/A A. Reasons for restriction (If Any): N/A ,

This Month Yr. to Date- . Cumulative

5. Number of Hours Reactor was Critical 720.0 5.429.1 49.119.2
6. Reactor Reserve Shutdown-Hours 0.0 0.0 339.8'-

.-7. Hours Generator on Line 724.0 5.361.5 48.473.7

8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross. Thermal Energy Generated (MWH) 22 453.478 18;069.012 158.162.603

_ .10 . Gross Electrical Energy Cenerated (MWH). 856.565 6.301.241 55.014.747

11. Net Electrical Energy Generated (MWH) 823.457 6.012.922 52.468.393

=

"12. Reactor Service Factor 10 0 . 0__, 82.6 79.2

1? Reactor Availability Factor 100.0 82.6- -79.7
14. Unit Service Factor 100.0,__ 81.5 78.1
15. Unit Availability Factor -

'100.0 81.5 78.1 11 6. _ Unit-Capacity Factor (Using MDC) 101.1- 80.9 74 8 117. Unit Capaelty Factor (Using Design MWe) 97.8 ,_

78.2 72.3 l18. Unit Forced Outaga_ Rate 0.0 18.5 6.6 ,

i .

Sbutdowns Schedul,ed Over Next-6 Months (Type, Date, and Duration of each): Refueling.

b '19.

L Outage on March 4, 1993 for 65 days.

l

20. IfLShut Down at End of Report Period, Estimated Date of Startup: _IU A .

Wolf Creek Cenerating Station.

Monthly Operating Report September 1992=

Page 2lof 5 -

'O ~ ~. - -,

4

' Attachment to'WO 92-0122-.

AVERAGE DAILY UNIT POWER LEVEL: 1

.D0 MET NO. 50-482' WOLF--CREEK GENERATING STATION:

WOLF CREEK NUCLEAR OPERATING CORPORATION =

-DATE 10 01-92 COMPLETED BY M. Williams TELEPHONE-316-364-Ba31 IHONTH September, 1992

- DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) ,

1 1142 17 1142 2' 1142 18 1144

.3' l1' 40 19 1147 4- 1139 20 1146 5 1141 21 _1_141 6- 1141 22 1145 1145 7- 1140 23-3.

8' 1143 24 1146 .

9- 1143 25 1146-

.10. 1143 26 1147 11 1144 27 1147

, -:12 1145 28 3147

13 - 1144 29 1149 14- =1140 30 ,

1148 15' 1141 31 N/A-

'16 1142

' Wolf Creek-Generating Station' Monthly Operating' Report September 1992 Page'3 of 5 9 4 is.--Je -p-

-e- ,

grr r .ph, 4 r.. e- -s ~

g y

Attachment-to WO 92-0122' '

UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. S0-482 ?

WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 10-01 COMPLETED BY M. Williams REPORT MONTH September. 1992 TELEPHONE 316-364-8831 TYPE lMETHODSSHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COP 9fENTS

[k) Date S: SCHEDULED (EOURS) (1) OR REDUCING POWER (2)

I SUt9(ARY: The unit operated at or near 100I power throughout the month of September.

1) REASON: A: EQUIPMENT PAILURE (EXPLAIN) E: -OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST F: ADLTNISTRATIVE 2. MAN'JAL SCRAM C: REFUELING G: OPEkATIONAL ERROR (EXPLAIN) 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4. CONTINUED
5. REDUCED LOAD-
9. OTHER Wolf Creek Generating Station Monthlv Operating Report September-1992

.Page 4 of 5

4 httec,hment.to'NO 92-0122-4

,, WOLF CREEK NUCLEAR OPERATING CORPORATION-

-VOLF CREEK GENERATING STATION

a.  ;

-UNIT NO _1  ;

MONTH Sentamber.'1992 j

--l

SUMMARY

OF OPERATING-EXPERIENCE.

Listed below in chronological sequence is a: summary of operating experiences.for this month._

l which required-' load reduction or resulted in significant non-load related incidents.

DATE TIME EVENT

' September 1, 1992 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100I power.

. September 30,' 1992 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 100Z power.

f l

l ,.

l i

h.

Wolf. Creek Generating'_ Station Monthly Operating. Report-l - September-1992'. -

- Page 5 of 5 O est <~ 4 h 4 --- w- y P