Responds to NRC Re Noncompliance Noted in Insp Rept 50-412/84-12.Corrective Actions:Procedures Will Be Revised to Include Independent QC Insp Prior to & QC Representation During Subsequent Walkdown,As of 850301
ML20114D346
Person / Time
Site: Beaver Valley
Issue date: 01/22/1985
From: Woolever E
DUQUESNE LIGHT CO.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
2NRC-5-009, 2NRC-5-9, NUDOCS 8501310227
Download: ML20114D346 (3)


Text

.

jve

'Af 412)787 5 t (412) 923-f 960 Nuclear Construction Division Robinson Plaza, Building 2 Suite 210 Telecopy (412) 787-2629 Pittsburgh, PA 15205 Jar.uary 22, 1985 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:

Mr. Richard W. Starostecki Division of Project and Resident Programs

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 USNRC IE Inspection Report No. 50-412/84-12 Gentlemen:

This is in response to the Item of Noncompliance cited in Inspec-tion No.

50-412/84-12 and listed in Appendix A (Notice of Violation) attached to your letter to Mr. E. J. Woolever, dated November 9,1984. On Decembe r 10, 1984, Duquesne Light Company provided a partial res pons e to the violation via letter 2NRC-4-204 and committed to addres s the second half of the violation by January 15, 1985.

Since that time, Mr.

C.

E.

Ewing, Manager of Quality Assurance, has requested and was granted an extension until January 22, 1985, from the Sr. Resident Inspector, Mr. G.

Walton.

Response

The remaining part of the violation to be addressed concerns certifi-cation of personnel involved in the System Walkdown prior to the turn-over for system testing.

The System Walkdown will occur in two phases, the QC inspection of the system followed by the Start-Up Group's (SUG) walkdown.

In order to ensure that QC inspection of the system or subsystem involved is performed on a formal basis with personnel certified for the actual attributes being inspected, our procedures will be revised to include an independent QC inspection.

This inspection will be performed by QC personnel on the completion status of the systems or subsystems by Construction.

This inspection occurs prior to the Start-Up Group's (SUG) walkdown to conditionally accept the system for initial testing. The subsequent SUG walkdown will include a QC repre-s ent at ive to ens ut e that the results and condition exis ting at the time of the QC inspection have not been invalidated.

It should be noted that the SUG walkdown is not an inspection, examination, or test as de fined by ANSI N4 5. 2.6, and therefore need not be conducted by certified personnel other than the QC representative.

8501310227 850122

(;\\

gonaoOcnOs*0;;2 n

e United States Nucisar Rsgulatory Cosmicsitn Mr.. Richard W. Starostecki Page 2 The revised program will be implemented by March 1,1985.

DUQUESNE LIGHT COMPANY l

By E.VJ. Woolever Vice President JS/wjs

_ec:

Mr. R. DeYoung, Director (3)

Mr. B. K. Singh, Project Manager Mr. G. Walton, NRC Resident Inspector INPO Records Center NRC Document Control Desk SUBSCRIBED AND SWORN TO BEFORE E THIS DAY OF-

/W.ecgt4/

_, 1985.

MfL JEW Notary Public ANITA ELAINE REITER, NOTARY PUBLIC ROBINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISS!Ott EXPlRES OCT03ER 20,1986 a._

y-..

1.

Unitcd Sectos Nuciccr R;gulctcry Commiosisn Mr. Richard W. Starostecki Page 3 COMMONWEALTH OF PENNSYLVANIA )

)

SS:

COUNTY OF ALLEGHENY

)

On this &

day of Gt4/A//

/fN, before me, a Notary Public in and for said honwealth and County, personally appeared

. E. J.' Woolever, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowl-edge.

L Notary Public ANITA ELAINE REITER, NOTARY PUBUC ROBINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXFIRES OCTOBER 20,1988 I